Search results

  1. S

    East-West Rail (EWR): Oxford-Bletchley construction progress

    Here‘s a screenshot from the TWA order drawings, it shows that in the pre-existing condition it had vertical walls either side of the northern abutment:
  2. S

    East-West Rail (EWR): Oxford-Bletchley construction progress

    This has been discussed in the forum before, I‘ll try and find the discussion, it started about post #532. I think they simply took adavantage of the fact that an additional arch had already been previously in use at that bridge, the embankment had been dug out and a third track laid for...
  3. S

    Closure of Thameslink services Harpenden to London over Festive Period

    Then there’s what looks like the entire garden of that block of flats on the right has to be removed and replaced. Hope nobody has been digging too deep in their flower beds…
  4. S

    December 2025 East Coast Timetable

    Why not just get the main ECML operator to run them? That way there’s no need for either Scotrail or Northern to worry about a micro fleet, just transfer the 802s and crews and they're practically the same as LNER 800s.
  5. S

    What should be done with Heathrow Express once Old Oak Common opens? And how could the paths be best used?

    The necessary flat crossing would cause too many down direction conflicts, in fact I see that (according to the layout diagrams in the OOC station thread), the restored single line would only connect onto the future up relief. I doubt through services would ever run, for the same reason as...
  6. S

    Football

    Was that the story I saw on football focus? I wasn’t listening to the detail… :D
  7. S

    Tyne and Wear Metro unable to run under closed Gateshead flyover

    But when would it ever have been useful during the last 40 years or so? If there was ever any sort of long term anticipated need for an emergency connection to the main network, surely Benton SW would have been the one to preserve, as it was already usable in the early years, and more...
  8. S

    What (If Any) Stock Is Currently Unused?

    Yes, but the original question did include a specific requirement for passenger use. People often don’t seem to read the actual question…
  9. S

    What (If Any) Stock Is Currently Unused?

    Why did 325s ever get mentioned in this thread. They’re not exactly ‘suitable for passenger use’ are they?
  10. S

    Transpennine Route Upgrade and Electrification updates

    Which was the location mentioned in post #8599 3 weeks ago, the discussion then meandered off towards Askham Bar, and eventually returned to the west. AIUI any APCO location has to be a significant distance from the end of the wires, to allow room for the manual procedure if auto fails...
  11. S

    MML Electrification: progress updates

    Yes to the distance from St Pancras, it was discussed last month when first noticed. Post #7743 reads that it’s exactly how the electrification masts are identified. https://www.railforums.co.uk/threads/mml-electrification-progress-updates.110445/page-259#post-7040625
  12. S

    Caught last week using freedom pass

    They have a thread that they started this morning.
  13. S

    Northern Cancellations - The stations that came out worst

    It’s 12 of 20 going to XC, the 2 with GC will eventually be returned increasing the stored number to 8. Can’t see them being useful to Northern in any case.
  14. S

    What should be done with Heathrow Express once Old Oak Common opens? And how could the paths be best used?

    They should still be possible, it’s why they are having 2 platforms on each of the four “GW“ lines.
  15. S

    May 2025 Timetable Change - Confirmed Changes Only

    It is shown in the draft. There’s a direct link to it just been added in the Cambridge South construction thread: https://www.railforums.co.uk/threads/cambridge-south-new-station-construction-progress.141520/page-38#post-7083579
  16. S

    December 2025 East Coast Timetable

    If the works at Middlesbrough for P3 ever go ahead, am I right in thinking the additional services would be extensions of the Kings Cross to York terminators, so nothing would need to be retimed?
  17. S

    December 2025 East Coast Timetable

    That’s what I thought, but the most recent XC TAA didn’t seem to ask for any rights to ‘through to the NE‘ services starting at Southampton. Hence saying it was ‘unexpected’.
  18. S

    December 2025 East Coast Timetable

    A bit unexpected, however the morning Reading starters would normally run empty from Eastleigh depot, so having an extended service at that time is relatively straightforward by modifying the ECS service. Still no sign of regular extensions to/from Southampton, but doing it all day at 2 hourly...
  19. S

    December 2025 East Coast Timetable

    I thought it had been decided there’s no room for it between York and Newcastle. I’m sure that’s been the explanation in the earlier threads, I don’t believe it was expected to return.
  20. S

    XC rolling stock speculation (including whether tilt could return)

    You’d think it had never been suggested before. There have been numerous previous threads about XC fleet early replacement - they come round every few months, and they’re all about 10 years too early. I suggest somewhere in DfT there’s a plan to keep them in service for over 40 years…