Slightly unrelated to Varamis operations but a GBRF path has appeared from 06/10 to 11/12 timed in the same way as DB Class 325s were (Electric locomotive, trailing load 325 tonnes, Planned for 100mph max)
https://www.realtimetrains.co.uk/service/gb-nr:C01664/2026-10-20/detailed