SWR did not propose DOO, it was DCO and that was a DfT bid requirement for new stock. The unrealistic bit of the bid was the timetable, which was a DfT spec. agreed with NR HQ but loathed by the Route, who, after award, would not accept it.
At the time of Covid, there was a right row going on...