• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. C

    WCML Accidents in the 1980s

    Even more of a co-incidence is the date of my post regarding 46202 - 74 years to the day.
  2. C

    WCML Accidents in the 1980s

    It took quite some time to recover. They had to build a Bailey bridge in Water Lane, then they had to build the temporary road, bring in and build up the cranes (Sparrows supplied the cranes), lift the loco, detach the bogies and then put it on a trailer. The unusual road move had to be...
  3. C

    WCML Accidents in the 1980s

    George Stephenson College, built on stilts because Water Lane used to flood regularly. When Watford Borough Council (much later) declined to approve the Hotel in Water Lane because it was a flood plain, a Government Planning Inspector approved it on appeal. Just before it opened it flooded and...
  4. C

    WCML Accidents in the 1980s

    87007 didn’t end up down the embankment - you are confusing it with 86209, which did in 1975. 87007 wasn’t even derailed. A temporary road was built across the water meadow to recover 86209, which was taken on a trailer from Water Lane, round the infamous Watford one way system the wrong way...
  5. C

    Wrexham, Shropshire & Midlands Railway updates

    Lumo Rochdale and Avanti (1 Blackpool return and 1 Chester, iirc) will also feature in the announcement.
  6. C

    Wrexham, Shropshire & Midlands Railway updates

    0700 tomorrow morning is when it will be announced.
  7. C

    Avanti West Coast - Renationalisation on March 7th 2027

    Correct. They are taking them back in strict CTED order, at a rate of 4 a year, approximately three months apart. The CTED dates for Avanti and EMR are identical so it was always a toss up as to who went in March and who went in June/July 2027. Now we know.
  8. C

    Swindon Works

    The SR standard 3MT tanks (82010-9/22-5) also the made the same move at the same time, although 82010-9 were the only ones that WR actually overhauled. Incidentally, WR then became responsible for their Britannia Pacifics and slowly took over this work from Crewe in 1956/7. To illustrate my...
  9. C

    Sadiq Khan says future of Heathrow Express should be ‘reconsidered’ due to Elizabeth line success

    The real value for HAL is what it can charge airlines for the Airport RAB, which the main fixed assets sit under. The train operation is effectively bunce. The interesting point about the 2025 accounts is that HAL extracted over £100m out of the business. It now has assets of less than £30m. It...
  10. C

    Swindon Works

    Eastleigh was dealing with various Standards and Fairburn 2-6-4T tanks in 1954/5. Swindon didn’t have capacity issues either. The reallocation was all about balancing workloads at a time when the total of needed steam overhauls all over the BR system was starting to decrease. The Standards and...
  11. C

    Swindon Works

    Swindon were responsible for the maintenance on the SR fleet (41290-41319) up until late 1956. The WR fleet were still dealt with at Crewe during this period.
  12. C

    Lifting Tracks in the 1960s - Main Contractors

    52322, restored at Horwich as L&Y 1122 (not it’s real L&Y number).
  13. C

    The Railways Bill - discussion about the legislation that will create Great British Railways

    Yes, because GBR Anglia does not exist yet. It is still only DfTO TOCs and NR working together.
  14. C

    Station pilots

    Yes, 08556, used for work with the steam excursion sets. It was painted in green livery. The class 08 at KX in Sectorisation days is interesting. The passenger station pilot in the 1970’s and 1980’s (“1 shunt”) was a cl.31 usually kept in the milk dock. It was swapped over on a daily basis.
  15. C

    Mk1 Carriages Before Blue/Grey Era

    The Gresley buffet was in teak. Going back to the Green MK 1 SR coaches transferred away, quite a few Green CK’s found their way north. All the Bulleid SO’s were repainted in Maroon by Eastleigh before they were sent north.
  16. C

    GWR timetable cut back

    And the 175’s could have gone to other TOCs but “the music stopped and GWR didn’t have a chair!” Nobody else wanted anything to do with them. The DfT choosing to withdraw the GWR HST’s forced the issue as to where they were going to end up. But the DfT weren’t going to keep them going at their...
  17. C

    Wrexham, Shropshire & Midlands Railway updates

    Looks like it has slipped to the autumn.
  18. C

    Lumo running train with no toilets

    I think the toilet issue is now well in the past - you don’t need to bring your own Elsan!
  19. C

    GBR Anglia

    No chance. October next year is the target date for getting GBR going properly, after being legally set up a few months before, probably March/April. “Access Day”, when the new access and timetable planning arrangements are to be introduced, is currently scheduled for December 2027.
  20. C

    Off the road at Paddington

    This is turning into a Monty Python sketch. I have been involved in recovering wheeled equipment from the tracks at KX, in the good old days when H&S never came into it. The odd station barrow, the odd brute, a few self help luggage trolleys (usually thrown over deliberately) no problem in...

Top