Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
Appledore is controlled be Ashford IECC and there is no signalbox at Frant, and Bo-Peep is nearer Hastings than Bexhill, all the rest is correct. One oddity is that Tonbridge no longer controls Tonbridge itself as that was taken over by Ashford IECC in the 90s
The talk at work is that the CARS project has been scrapped indefinitely, especially as the current train service and train lengths don’t warrant it anymore.
In both the case of TBASC and TBROC the local management always seem to advertise internally and externally at the same time for reasons better known to themselves.
Platform 6 at Norwood Junction is in constant use, however platform 7 on the other side of the island platform has been out of use for well over 40 years.
They main difference is the technology used for the man machine interface, the ASC is 1980s/2000s designed signaller control desk with push buttons NX (eNtrance eXit) panels and a separate diagram to operate the signalling, whilst the ROC uses 2000s to present PC (keyboard, mouse, monitor) based...
I’ve not been aware of any problems through East / South Croydon effecting the Fast lLines this week and the current problem only effects a very small portion of Down Slow / Up East Grinstead Lines that can easily be worked around without the need to caution trains.
At 11.00 am today the track engineers imposed a non boarded 5mph emergency speed restriction over the effected fixed diamond crossing for train movements on the Down Slow Line and Up East Grinstead line, other routes are not effected. There has been no emergency or any other speed restrictions...
There is no emergency speed restriction in place at South Croydon, but there is a rail defect within the junction that requires that the engineers take a Line Blockage every hour to inspect. They are hoping to repair the rail defect tonight.
I’ve got no idea about signal sighting, that’s above my pay grade. So I wouldn’t quote me on such issues.
But most signallers will place the train at the London end of the platform if they need the country end clear or think they will need to use the country end of the platform whether it’s...
Most GWR drivers with use the radio and request permission to stop short from the signaller and it’s the signaller who decides if they want that or not. Some have stopped short without asking causing platform sharing issues during distribution.
Redhill is controlled by the signallers at Three...
Because timetable planning has had a bad habit recently of booking the South Eastern nonstop diversion services through platform 3 and some colleagues will follow the program exactly even though I would make more sense to run those services through the though road. To me it makes sense to keep...
A pool Signaller at the TBROC could quite easily end up at TBASC or vice versa as we currently have two TBROC pool signallers learning our panels at the moment.
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.