• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. B

    TPE fleet - are the Mk5s the right choice?

    Period 5 reliability figures: NOVA 1 - 20,000 NOVA 2 - 9,000 NOVA 3 - 5,500
  2. B

    TPE fleet - are the Mk5s the right choice?

    If you're expecting large plush seats with acres of legroom on a new build these days you're going to be disappointed. In comparison to other modern designs, the interior layout of the TPE mk.5's is one of the better ones, I can think of much, much worse. Comparing them with designs from 50 or...
  3. B

    TPE fleet - are the Mk5s the right choice?

    Moderator Note: Posts #1 - #20 originally in this thread: https://www.railforums.co.uk/threads/tpe-mark-5a-coaching-stock-progress.143579/ It is true to say that there was a lack of engineering oversight on the part of TPE during the build process, which is now causing problems. TPE's only...
  4. B

    Increase tolerances for cornering G force?

    Don't TPE's class 397 EMU's run at 125 without tilt?
  5. B

    Longest serving driver?

    Up until around 2 years ago, retiring wasn't on my "agenda" at all. I couldn't rise to the dizzy heights of 50+ years service, I joined too late for that, but I had 30 years on the footplate in my sights. But since the May '18 timetable fiasco, and other events since, I've never seen the railway...
  6. B

    TPE Nova 3 (Class 68 + Mk5s) updates and withdrawal from service

    None. Training on 68/mk.5's, due to recommence next week, has been binned until at least June, despite train crew already being booked onto courses. Utter, utter, shambles..... Its 4 years in June since TPE announced they would be using 68's as a "quick fix" to their capacity problems....
  7. B

    Most Depressing Stretch of Line on the Network

    Most depressing? Middlesbrough to Redcar, nowhere else even comes remotely as close.
  8. B

    TPE Mark 5A coaching stock progress

    As I remember, there is no "pre-heat" on 68's, only pre-lube and crank. Takes just a few minutes to start one up from cold, provided the batteries have enough charge..... The coaches have a 90 minute battery supply for the vital systems, so it should be possible to at least switch off the ETS...
  9. B

    TPE Nova 3 (Class 68 + Mk5s) updates and withdrawal from service

    68022 has failed at Lime Street before departure with the 16.54 to Scarborough (1E45) as a result the return service from Scarborough at 20.34 (1P94) is also cancelled. And it was all going so well....
  10. B

    TPE Nova 3 (Class 68 + Mk5s) updates and withdrawal from service

    68023 has taken over training duties at Scarborough from 68025.
  11. B

    TPE Nova 3 (Class 68 + Mk5s) updates and withdrawal from service

    More problems for 027 it seems, its 1F74 (16.32 ex Scarborough) was terminated at Man Vic, then went ECS to Longsight as 5H74. The return working, 1E51, started at Man Vic off a 5E51 ECS from Longsight.
  12. B

    TPE Nova 3 (Class 68 + Mk5s) updates and withdrawal from service

    I see 68027 had problems again this morning at Scarborough causing the cancellation of the 09.32 departure (1F60) and 12.52 return from Liverpool (1E37) as far as York. It has been repaired and gone ECS to York to start 1E37 there, but from being the most reliable of the TPE locos sadly it seems...
  13. B

    TPE Nova 3 (Class 68 + Mk5s) updates and withdrawal from service

    It is being used to train the final Scarborough drivers on the type. Should be there until around the end of January.
  14. B

    TPE Nova 3 (Class 68 + Mk5s) updates and withdrawal from service

    Significant disruption today due to a track circuit failure at Deighton. 68022 working 1F60 was diverted via the Calder Valley arriving at Man Vic 66 late, it has gone ECS to Longsight and the return service from Liverpool, 1E37, is cancelled. Also showing cancelled are 68027's trains 1F68 and...
  15. B

    Transpennine Express December 2019 Proposals

    I wonder how significant it was that Steve Montgomery from First Group was there?
  16. B

    TPE Nova 3 (Class 68 + Mk5s) updates and withdrawal from service

    68021 is making its TPE passenger debut today on 1P05/1F50 etc. (701 diagram).
  17. B

    Transpennine Express December 2019 Proposals

    TPE are not cancelling "over half their services" where on earth did you make that figure up from?
  18. B

    Dartmoor & Weardale Railways for sale

    Indeed, "turnover is vanity, profit is sanity"...
  19. B

    Transpennine Express December 2019 Proposals

    First have form for that sort of thing, last year at the height of Hull Trains problems, they would sell advance tickets the day before for the first service out of Kings Cross the next morning when it was already known the last up service from Hull that night would be cancelled.
  20. B

    TPE Nova 3 (Class 68 + Mk5s) updates and withdrawal from service

    Best day for a very long time on TPE today, and the first day the four 68 diagrams have run in their entirety - providing 1E53 (025), 1P92 (019), 1E51 (023) and 1P94 (022) finish their final journeys without drama. Very nice to see.

Top