• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. Jorge Da Silva

    "WFH is here to stay" - the hypocrisy of HS2.

    True. Freight has rebounded very strongly and is effectively booming and with passenger numbers also recovering (to 92% on the 22 May) rail is growing once again not shrinking
  2. Jorge Da Silva

    "WFH is here to stay" - the hypocrisy of HS2.

    Hs2 will help with freight capacity in the business case for Phase 1 it is assumed off peak there will be 4tph for freight and then in peak times that will be used for passenger services and places like Tring will recieve alot more services during the peak hours.
  3. Jorge Da Silva

    "WFH is here to stay" - the hypocrisy of HS2.

    On the 22 May 2022, the DfT's own figures suggest passenger numbers reached 92% of pre-covid levels overall with many long-distance operators from what I have heard well ahead of pre-pandemic levels as they rely less on business and commuting and more on leisure (which is doing very well...
  4. Jorge Da Silva

    Through running of Elizabeth Line between Shenfield / Stratford and Heathrow / Reading

    I meant from May 2023, yes from the autumn it will be Shenfield terminating at Paddington thats a given.
  5. Jorge Da Silva

    Through running of Elizabeth Line between Shenfield / Stratford and Heathrow / Reading

    I imagine it will be a mix of Shenfield and Abbey wood services going west. So some Abbey wood services terminating at Paddington and some Shenfield. I think it will be closer to londonist
  6. Jorge Da Silva

    Through running of Elizabeth Line between Shenfield / Stratford and Heathrow / Reading

    What?? They will just cut the service or run a reduced service. Plus crossrail is far more prepared and more advanced than Thameslink and doesnt have to deal with other operators on its line very much (only GWR during off-peak i think). 1654180848 So it’s unlikely to be as bad as Thameslink as...
  7. Jorge Da Silva

    Through running of Elizabeth Line between Shenfield / Stratford and Heathrow / Reading

    Dont think that alternative is likely to happen at all. 1654179807 I cant see all services at Shenfield permanently terminating at Paddington??? Sure that’s the plan from Autumn 2022 until May 2023 but beyond that no i cant some will yes but not all
  8. Jorge Da Silva

    Through running of Elizabeth Line between Shenfield / Stratford and Heathrow / Reading

    Ah ok make sense. How many stations have crossovers for reversal?
  9. Jorge Da Silva

    Through running of Elizabeth Line between Shenfield / Stratford and Heathrow / Reading

    Services will run beyond Paddington end of…. About half of services will terminate at Paddington but that was always planned. About 12tph will continue west of Paddington.
  10. Jorge Da Silva

    Through running of Elizabeth Line between Shenfield / Stratford and Heathrow / Reading

    But it is happening. There will be services from Reading to Shenfield 1654173258 Thats not why there are services from Reading Shenfield!!!!!!!! Most people will be travelling from the stations to Central London and from Central London to the stations on those branches so it will be well used.
  11. Jorge Da Silva

    Through running of Elizabeth Line between Shenfield / Stratford and Heathrow / Reading

    First statement is wrong. There are plans to run Reading to Shenfield from May 2023!!!!
  12. Jorge Da Silva

    Feasibility of a Limehouse Crossrail station?

    The answer as to could it be built in the future, is no. It would be too much hassle and just wouldn't be worth the cost.
  13. Jorge Da Silva

    National Rail services which run on non-Network Rail tracks

    They aren't. The former is Heathrow Airport Holdings owned the other is TfL owned but only between Highbury and New Cross/New Cross Gate i think
  14. Jorge Da Silva

    December 2022 Timetable Changes

    That’s gonna be a big one. Liverpool to Cleethorpes is coming then.
  15. Jorge Da Silva

    When will the Trafford Park Line extension to Crumpsall?

    Yes 1651444388 Just wondering when they will extend to Crumpsall
  16. Jorge Da Silva

    When will the Trafford Park Line extension to Crumpsall?

    The line has been finished to Crumpsall, just wondering when it will be extended as planned to Crumpsall.
  17. Jorge Da Silva

    The name of the new station south of Liverpool Central is...

    we dont need a vote on Headbolt Lane
  18. Jorge Da Silva

    Shapps "promised to scrap HS2 Golborne spur"

    In the union connectivity review it was proposed to be scrapped in favour of a connection South of Preston
  19. Jorge Da Silva

    EMR Liverpool-East Midlands a portion working

    There isn’t an extra path on the hope valley or at Manchester 1649268958 Also no capacity at London St Pancras either

Top