• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. D

    Construction progress: TPE 350/4

    They do indeed.
  2. D

    Construction progress: TPE 350/4

    350408/9/10 out on 12 car empty stock testing Preston - Carlisle today.
  3. D

    Class 380

    Seems strange that the traction supply is fed from the ACUs - on a 350 the traction units (TCUs) are fed directly off the secondary transformer windings, as are the ACUs.
  4. D

    Construction progress: TPE 350/4

    Yup, seems to have been the driver training unit since before xmas.
  5. D

    Construction progress: TPE 350/4

    Yes, yes, yes, similar, and no. Theoretically the could couple mechanically and pneumatically for assistance only, but the prong / horn thingy on top of the 185 coupler would have to be removed first!
  6. D

    Construction progress: TPE 350/4

    As they are at the minute, definitely not.
  7. D

    Construction progress: TPE 350/4

    Not to mention the additional number of drivers, shunt moves, intermediate cabs and passenger shuffling between vehicles that would be needed.
  8. D

    Manchester - Liverpool Electrification

    2 more due a week on Monday apparently.
  9. D

    Proposal for Furness line Electrifcation

    Blackpool is already confirmed for wires, Windermere pretty much green lighted but as for the Barrow line, not sure it's justified for what is basically an hourly-service branch. Currently double-tracked and absolute block throughout, line speed doesn't exceed 60mph and the cost would likely...
  10. D

    Guide Bridge Problems 21/12

    Blown fuses in signalling kit, causing multiple track circuit failure indications and blank signals - bit of a job stopper.
  11. D

    Manchester - Blackpool & Scotland TPEx Changes

    They have indeed - the short single chord from the main line to the Up & Down Lowton was the only bit that was 15mph (not both lines as far as Lowton Jn) but was increased to 20mph earlier this year.
  12. D

    Manchester - Blackpool & Scotland TPEx Changes

    If you mean Parkside - Golborne, line speed is only 20mph throughout.

Top