Search results

  1. V

    Storm to close line at Dawlish evening 23rd to Saturday afternoon (and beyond)

    There’s a suspected void under the down main. That would affect train running.
  2. V

    Storm to close line at Dawlish evening 23rd to Saturday afternoon (and beyond)

    A sinkhole has been discovered with voiding of the main lines between Teignmouth and Dawlish. Can’t see a reopening anytime soon.
  3. V

    Storm to close line at Dawlish evening 23rd to Saturday afternoon (and beyond)

    I would think Monday is most likely, a lot is going to depend on the cliffs between Teignmouth and Parsons Tunnel.
  4. V

    Storm to close line at Dawlish evening 23rd to Saturday afternoon (and beyond)

    Again, it's the parapet that prevents sea water washing away the railway. I guess they could use sandbags to patch the section of wall to secure the railway though.
  5. V

    Storm to close line at Dawlish evening 23rd to Saturday afternoon (and beyond)

    Depends how pedantic you want to be! It's effectively built on the seawall and prevents the railway being washed away or constantly flooded
  6. V

    Storm to close line at Dawlish evening 23rd to Saturday afternoon (and beyond)

    Part of the seawall has collapsed onto the down main.
  7. V

    Storm to close line at Dawlish evening 23rd to Saturday afternoon (and beyond)

    Depends what time you travel. Anything come down from London will be spun at Exeter to go back up. There will also be sets at Exeter for the start of service.
  8. V

    Low speed derailment at Paignton - 16 January 2026

    The unit will be in Goodrington Yard but the crossing will have been opened once repairs were completed.
  9. V

    Storm to close line at Dawlish evening 23rd to Saturday afternoon (and beyond)

    Permanent resilience from major damage to the infrastructure. ie the route can quickly be reopened following a storm rather then long closures for repairs.
  10. V

    Storm to close line at Dawlish evening 23rd to Saturday afternoon (and beyond)

    With one line open through Dawlish they’re picking up delays so I guess some will be turned at Newton Abbot
  11. V

    Low speed derailment at Paignton - 16 January 2026

    This move may well end up being cancelled as the route through Dawlish is being closed from 20:30 this evening due to forecasted severe weather. Something like 14ft waves are expected which has potential to flood or seriously damage the infrastructure
  12. V

    Low speed derailment at Paignton - 16 January 2026

    Disconnected the track circuits occupied by the derailed train. Only allowed upto 4-car trains into Paignton.
  13. V

    Class 175s to GWR

    A “leading driver” job. Again though, no point undertaking non-handling elements of training if there aren’t the serviceable units to undertake the practical handling element on.
  14. V

    Class 175s to GWR

    Surely this proves all you need to start with is trained instructors? There is little point in having trained crew when you don't have enough serviceable 175's to keep there competence up
  15. V

    GwR HSTs to be stood down

    Laira took what 175's were in the best condition, robbing good parts off the ones at Laira to make a good unit. There was no point taking anymore when the amount of work required could not be undertaken at Laira. They pretty much need rebuilding. These units have been sat outside at Ely for...
  16. V

    Class 175s to GWR

    Out of engine hours. They’d need significant amounts of work in terms of both time and money to extend their life and further. I think it’s highly unlikely a 175 will be in passenger service tomorrow but you never know.
  17. V

    GwR HSTs to be stood down

    Keeping them going until enough 175’s were ready would have involved taking maintenance staff off 175’s and, as the Castle sets are now out of engine hours, would have required significant work in terms of time and money to extend their life further. They‘re in this position because of the...
  18. V

    GwR HSTs to be stood down

    The training isn’t the issue. The condition of the 175s was, and still is, the issue.
  19. V

    GwR HSTs to be stood down

    It hasn’t been handled badly by GWR. GWR have been left with no choice.