• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. L

    Southern DOO: ASLEF members vote 79.1% for revised deal

    Yes, maybe going off-topic.... But with the 0400 CMEE crew, the Control would balance the early starts and use the moves for later departures. As regards the other moves now, there is (was?) a lot of goodwill on the part of many drivers in making up etc of trains overnight, to get a correct...
  2. L

    Southern DOO: ASLEF members vote 79.1% for revised deal

    In the same way there used to be a 04.00 CMEE crew at both Brighton and Selhurst, whose first priority was to move stock before the start of service, to ensure the outstations were balanced. But of course another saving, and now we run short in the morning peak!
  3. L

    Southern DOO: ASLEF members vote 79.1% for revised deal

    And I remember back to BR days when we had a full establishment at one depot, and there was rostered sickness as a result.
  4. L

    Southern DOO: ASLEF members vote 79.1% for revised deal

    And to think that when GTR took over FCC, they complained that FCC left them short of drivers...... And yes, the TL route is short of drivers, but nothing compared to the mess the Southern management carried forward! However, both management and union are to blame in that both sides always...
  5. L

    Southern DOO: ASLEF members vote 79.1% for revised deal

    The conversation goes..... GTR: we wish to introduce OBS RMT: we oppose that and insist on guards on every train Hardly takes three minutes to say that, let along any longer. So of course GTR management are going to refuse!
  6. L

    Class 442s - Now at the end of the road and to be withdrawn permanently

    Yes, because the Southern fitters were told that each unit had its own quirks (i.e.: mods), that the Bournemouth staff had got to know over the years. Hence, it the manuals were of limited use!!
  7. L

    Thameslink/ Class 700 Progress

    My opinion on two days travelling on them is similar but.... (And there's always a but!) The first day I sat next to the window. Wrong move! The ducting along the bottom makes it difficult for a long-legged person to sit straight. The second day I sat next to the aisle. Same level of comfort...
  8. L

    Information for GTR Southern passengers during strike (no DOO discussion)

    Cascades down.... Metro depots cover Three Bridges and Horsham work in the metro area, to allow Horsham and Three Bridges drivers, probably along with Redhill, to cover Barnham or Brighton work? As long as it doesn't go on too long, and these depots lose their Metro route knowledge!
  9. L

    Information for GTR Southern passengers during strike (no DOO discussion)

    But Three Bridges and Horsham drivers cover Metro work.....
  10. L

    North Downs line electrification

    Or there is the xx.08 TL service from Gatwick during the day, which connects. Of course GWR also want to operate a half-hourly service to and from Gatwick too.
  11. L

    Omitting station calls, to recover service

    Many of the services only have 6 - 8 minutes at Manchester Victoria, before heading back to Leeds. Control's have to work with the resources they have. If there is a spare unit (or one with a long layover) and a starting crew, then the service can be recovered. However, if the crew work in and...
  12. L

    London Bridge - new timetable during reconstruction works commencing 5th January 2015

    Yes, but TL and SE drivers cannot cover each other's work in the event of a driver not showing up. On more than one occasion SE have been able to help out, but it's been blocked by TL, although there was a recent 2Zxx on the SE than a 1Exx, to get around the issue.....
  13. L

    Thameslink/ Class 700 Progress

    Err, no.... That's why they run around as 3Txx at present, so the signallers knows they're 700's. One tried to go out the other night as a 5Zxx and was queried as it came out of the depot, before being changed.
  14. L

    Southern DOO: ASLEF members vote 79.1% for revised deal

    Been happening for years on the TL route. And if a train does stop and there are no staff, then the driver is advised to carry out a safe method of working, which usually involves manually closing each set of doors! In any case, its no different to running fast to make up time, the customer is...
  15. L

    Southern DOO: ASLEF members vote 79.1% for revised deal

    Often not.... Usually one round trip and then replaced or rectified.
  16. L

    Southern DOO: ASLEF members vote 79.1% for revised deal

    Another example of the safety regulations involved with DOO. Stops at manned stations only. A less frequent occurrence than a Conductor going sick....
  17. L

    Proving to Southern that their own train exists!

    It hasn't been deleted, it is still in the 'Trust' system. Terminated East Croydon due to a Network Rail Incident (OC). --- old post above --- --- new post below --- Usually done at the request of Network Rail, as if the alteration / cancellation is known at least the day before, then it...

Top