• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Thameslink/ Class 700 Progress

Status
Not open for further replies.

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,068
Location
Redcar
can we take all timetable discussion to here

Yes any further timetable discussion should be carried on in the linked thread and leave this one clear for the rolling stock discussion. Any further timetable posts are likely to be deleted for being off-topic.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

class387

Established Member
Joined
9 Oct 2015
Messages
1,580
10.02 & 12.32 Brighton - London Bridge and returns from next week is the claim from Three Bridges

Finally! :D Are the depot runs on RTT yet?

A bit disappointed they aren't going through the core though.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
10.02 & 12.32 Brighton - London Bridge and returns from next week is the claim from Three Bridges

Right now planned introduction date is still not set. But we are talking a matter of days not weeks.

Finally! :D Are the depot runs on RTT yet?

A bit disappointed they aren't going through the core though.

Give it some time. Softly softly.
 

physics34

Established Member
Joined
1 Dec 2013
Messages
4,081
Yes any further timetable discussion should be carried on in the linked thread and leave this one clear for the rolling stock discussion. Any further timetable posts are likely to be deleted for being off-topic.

thats fair enough, just posted the amendments so people would see them, i realise its the wrong thread.
 

Nic Robinson

Member
Joined
15 Jun 2016
Messages
48
Well I can't wait not to have to get a 4 car 377/4 on the (e.g.) 1942 to Brighton. Unbearable! At least it's 8 or 12 on the core services.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
I love this irony of this, as much as I understand the reasons. Thameslink trains not going through the Thameslink core.

The indeed. However won't last that long.

Just to add the diagram is as previously stated

1B18 10:02 Brighton to London Bridge
1B21 11:12 London Bridge to Brighton
1B28 12:32 Brighton to London Bridge
1B31 13:42 London Bridge to Brighton

Starting some point next week.
 

Nic Robinson

Member
Joined
15 Jun 2016
Messages
48
The indeed. However won't last that long.

Just to add the diagram is as previously stated

1B18 10:02 Brighton to London Bridge
1B21 11:12 London Bridge to Brighton
1B28 12:32 Brighton to London Bridge
1B31 13:42 London Bridge to Brighton

Starting some point next week.

Thank you for this. I think I'll be on one of these on Thursday.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,157
I love this irony of this, as much as I understand the reasons. Thameslink trains not going through the Thameslink core.

Class 700s are supposed to begin operating on Great Northern well before the Canal Tunnels come into passenger use.
 

Sunset route

Established Member
Joined
27 Oct 2015
Messages
1,223
The indeed. However won't last that long.

Just to add the diagram is as previously stated

1B18 10:02 Brighton to London Bridge
1B21 11:12 London Bridge to Brighton
1B28 12:32 Brighton to London Bridge
1B31 13:42 London Bridge to Brighton

Starting some point next week.

Not long then to get the track through the Down Fast Platform at South Croydon sorted out then :lol:
 

Sunset route

Established Member
Joined
27 Oct 2015
Messages
1,223
Slow line runs for now it seems :(

Not quite the glorious start for a new train in service on infrastructure that was ready for it until a tamper had a hissy fit and slewed the track the wrong way thus making train and infrastructure incompatible at the launch, especially if one goes down there and get re-profiled if the signaller has now idea if it's a 319, 377, 387 or 700 on that particular service. :oops:
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Not quite the glorious start for a new train in service on infrastructure that was ready for it until a tamper had a hissy fit and slewed the track the wrong way thus making train and infrastructure incompatible at the launch, especially if one goes down there and get re-profiled if the signaller has now idea if it's a 319, 377, 387 or 700 on that particular service. :oops:

RCM has a copy of the workings so once go is given, advance notice can be given and guidance for signallers outlined. Phase 2 will be more of an issue.
 

class387

Established Member
Joined
9 Oct 2015
Messages
1,580
The indeed. However won't last that long.

Just to add the diagram is as previously stated

1B18 10:02 Brighton to London Bridge
1B21 11:12 London Bridge to Brighton
1B28 12:32 Brighton to London Bridge
1B31 13:42 London Bridge to Brighton

Starting some point next week.

Does this include weekends?
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
Not quite the glorious start for a new train in service on infrastructure that was ready for it until a tamper had a hissy fit and slewed the track the wrong way thus making train and infrastructure incompatible at the launch, especially if one goes down there and get re-profiled if the signaller has now idea if it's a 319, 377, 387 or 700 on that particular service. :oops:

In a situation like this, would the driver have been made aware of this issue and so would be ready to reject a route if necessary?
 

LBSCR Times

Member
Joined
17 Sep 2013
Messages
617
Location
Sussex born and bred
Not at present.



The restriction is already there so updating it means there no reason it should be missed. Units are already running around so unless you use xZxx headcode they should be find.

Err, no....
That's why they run around as 3Txx at present, so the signallers knows they're 700's.
One tried to go out the other night as a 5Zxx and was queried as it came out of the depot, before being changed.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Err, no....
That's why they run around as 3Txx at present, so the signallers knows they're 700's.
One tried to go out the other night as a 5Zxx and was queried as it came out of the depot, before being changed.

At one point the signallers demanded 5Zxx when 3Txx were first brought in. Considering 3xxxx headcode run on BML now, there is scope for issue under your example.

Not that it matters, NR has lifted the restriction after actually checking.
 

Sunset route

Established Member
Joined
27 Oct 2015
Messages
1,223
At one point the signallers demanded 5Zxx when 3Txx were first brought in. Considering 3xxxx headcode run on BML now, there is scope for issue under your example.

Not that it matters, NR has lifted the restriction after actually checking.

Confirmed the restriction at South Croydon was withdrawn at 16:09 today.

Plus the use of the 3Txx codes was because the ever changing N/RAPs restrictions was getting confusing and the signallers needed a positive way of identifying a class 700s other than the 6X66 on delevery and even now if you were to ask every signaller what the class 700 restriction are you will get different answers.

Next weeks class 700 passenger workings
 

Attachments

  • image.jpg
    image.jpg
    117.3 KB · Views: 198
Last edited:

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Confirmed the restriction at South Croydon was withdrawn at 16:09 today.

Plus the use of the 3Txx codes was because the ever changing N/RAPs restrictions was getting confusing and the signallers needed a positive way of identifying a class 700s other than the 6X66 on delevery and even now if you were to ask every signaller what the class 700 restriction are you will get different answers.

We could of course implement the Dec 2017 train reclassification on all 700 services meaning we would have a far better understanding of what is running.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Can anyone advise me what 700 is working tomorrows ferme park reception ln gbrf to three bridges depot tomorrow please?

Strange how it's pathed as a 313

http://www.realtimetrains.co.uk/train/K97293/2016/06/19/advanced

Also is it under its own power
Thanks

It's time as a 313 just as a general paths for speeds etc. Not really important for an ECS moves anyway. Don't forget there no such thing as a 377/387 either, it's all 375.

700s are DV units, would be silly to not run them under hier own power on cleared routes. And the NLL has always been a route for 700s to be moved ECS.
 
Status
Not open for further replies.

Top