Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
Heard rumours of another bulk carrier berth getting built and another biomass storage shed going up , the one we have now can hold 65 000 tonnes + . And plans to double the number of trains to 25 a day !!
--- old post above --- --- new post below ---
Saw another DB coal train in the Dock today...
TVHH , I bet you get sick of this climb ;) , my granda used to drive the iron ore trains up there to Consett :- http://www.youtube.com/watch?v=TchlO6uW4Wo&list=UUHcXrDZWgOWroRZWepDnUYw&index=30&feature=plcp
How many trains a day are leaving Tyne Dock and are they planning on increasing this ?
Thats over a half a full ship load shifted in 18 trips WOW ,
A normal shipment is about 68 000 MTonnes in a ship 225 metres long .
Average coal train carries about 1700 Tonnes.
ON the Tyne today is a vessel that came from New Orleans with coal ! Also outside the piers at anchorage is a ship that came from Vystock in Russia ,we get ships from Murmansk and also Ust Luga In Russia , Also we get a lot from Riga which is in Latvia.We have received a few shipments from...
Will they be using covered wagons ?
As biomass must be kept dry.
They stop unloading it at any sign of rain here at Tyne Dock.
I thought GBRF only used one set of covered wagons , does anyone know anything different ?
Just heard from a green driver who is now team (blue)Tyne Dock and I asked him how many trains are running from Tyne Dock , he said 12 a day approx , but they are wanting 25 a day !! I was also speaking to the cargo supervisaor and he told me Drax can ask for 4 trains a day which equates to just...
These are the biomass wagons and they only have one set though the loading facilities can load 8 trains a day as it takes 3 hours to load the silo :-
http://www.gbrailfreight.com/news.php?&newsid=911
--- old post above --- --- new post below ---
Thanks for the reply Freighmaster .
At 70...
It was the Biomass storage shed 'where about 200 tonnnes caught fire :-
http://www.chroniclelive.co.uk/north-east-news/breaking-news/2011/10/30/firefighters-battle-biomass-blaze-in-south-shields-72703-29688092/
The pellets come from here :-
http://www.fibreco.com/about.htm
and look...
Thanks to its locomotive platform
design, the EUROLIGHT can be
equipped with two different Caterpillar
engines: CAT C175-16 (2800 kW)
and CAT C175-12 (2300 kW).
2800 kw is 3753.3512064439996 horsies and
2600 kw is 3083.109919579 Horsepower
I am not bickering , just talking about the class , is there any need for your comment ?
It does look like a 67 though
This looks like the loco and rated power is 3553.70792544 horsepower is this higher than a 66 ? :-...
Hello guys,
Wonder if anyone can let me know how many trains per week are leaving Tyne Dock as I have noticed the coal stock piles are dramatically reducing.I often go into the dock as I do work as a volunteer for Mission to Seafarers and have noticed that not too many trains load coal during...
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.