• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. D

    Thameslink Services/Timetable from May 20th 2018

    <Pendantic> Thameslink opened in 1988 </Pedantic>
  2. D

    Class 379s or 350s for Corby?

    I think you mean 377s/387s have run as 12 cars at 100mph on the MML. 319s were restricted to 8 car formations.
  3. D

    Glasgow Central Question

    No Motherwell was brand new. It did incorporate the earlier interlocking at Newton though
  4. D

    Glasgow Central Question

    Just to add that it had a major upgrade in the early 70s as part of the extension of the WCML electrification from Weaver Junction to Glasgow. The 1961 ocs panel was replaced with an NX panel and the control area greatly extended.
  5. D

    Cambrian line 20 Oct 2017: loss of ERTMS speed restrictions. RAIB report released

    There have been incidents where systems which were thought to be fail safe but turned out not to be. One I can think of was on the Washington Metro where a track circuit module failed in such a way that it failed to detect a train resulting in a fatal collision. I can think of others in the UK...
  6. D

    Porterbrook Cl.769 'Flex' trains from 319s, initially for Northern

    Units operating on DC generally experience more power interruptions than units operating on AC so that shouldn't be a problem at all for 319s as they've been dealing with it for years
  7. D

    Suggestions for future use of Class 332s post-HEx

    Two problems with the 332s being redeployed. 1. They don't have AWS/TPWS 2. Mechanically they are not in the best of shape That means they will need serious money spent on them if they are to be re-used. Indeed it is possible they would have needed serious money spending on them if they...
  8. D

    The signals in the middle of Penge Tunnel

    It's been resignalled since then when Victoria (SE) panel opened in the 1980s
  9. D

    Great Western Electrification Progress

    Pan down is permissible anywhere at any speed. Pan up above 20mph is only permitted at designated changeover points (ie currently Moreton, previously Maidenhead). The designated changeover points require the ole to be specially tensioned.
  10. D

    What this on third rail ?

    There are locations (usually around S&C) where the running rail nearest to the conductor rail doesn't carry traction return current. Hence trying to use an SCB will a. not work and b. cause havoc with signalling circuits and so the protective cover on the underside acts as a warning and a...
  11. D

    Lord Adonis resignation letter & East Coast franchise

    That'll be the flawed assumption that NR/DfT would deliver the upgrades and new trains on which the franchise contract was predicated.
  12. D

    Was VTEC the right choice?

    DOR deferred some fleet maintenance which is why their financial performance appeared better than it really was and why there have been Class 90s working for VTEC whilst the maintenance backlog is addressed.
  13. D

    Great Western Electrification Progress

    The 85mph limit dates from when the layout was changed at Rushey Platt to allow up stopping trains a faster run into the station.
  14. D

    ALRs and Senior Railcards. LSE morning peak validity

    I note that a condition of a Senior Railcard is: "Your Senior Railcard is NOT valid when travelling between two stations inside London and the South East area during morning peak time." Does this mean that a Senior Railcard holder who purchases an ALR cannot travel from say Brighton to...
  15. D

    Class 455 with AC Motors

    Takes me back to the early days of AC emus and the exploding Class 303s.
  16. D

    Problems using a Britrail pass on London Overground (denied travel)

    Should be no problem but I can tell you from personal experience that it is. I've had a few run-ins with LO RPIs who claimed an ALR was invalid on LO because of variations on the well worn theme of "LO is part of the Underground and not National Rail". My view is that TfL management do...
  17. D

    Midlands to South London - minimum of walking

    If you're going that way then it's better to change at Balham rather than Clapham Jn if you have limited mobility.
  18. D

    Class 88 UKDual & EuroDual

    From the videos it sounded to me like both were under power
  19. D

    Last Chance To Take Photos from Trains.

    The retained HST trailers are getting power doors

Top