Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
As far as I can tell all the stations on the NLL & WLL have them now, along with at certain locations a sign underneath saying "check signal aspect" which is at places where you have to stop right on top of the signal to fit on the platform properly.
From what I heard chatting to someone who's been involved in the testing, we're gonna have the same thing with those as the 313's, takes a few seconds after taking power before anything happens, they were doing stop board positioning and apparently they had real difficulty moving it just a...
if the advertised closure on london overground is saying rail replacement bus from stratford (i havnt checked) then doubt you will see much (if any) freight from stratford, as we tend to work to the nearest station we can reverse at before the engineering possession limits, if stratford isnt...
Walked in thru the shed today and there was one on No. 1 Road and andother on No. 2 Road.
--- old post above --- --- new post below ---
May just be roumour but there was talk of a 378 going into the bay platform at Willesden monday 18th for some sort of launch, apparently some media coverage...
Class 378's have CSR, NRN and GSM-R radios, the ELL core section will have GSM-R coverage and the rest of the route is CSR, and the North London line is all on NRN.
I'm pretty sure LU can do pretty much the same moves as LO do on the DC Route. I have known LU trains to reverse at Kilburn High Road (it's not a station normally served by LU) and has 3rd/4th rail to allow for this, rather than taking the junction indicator on approach, gets a main aspect...
When Euston was re-done it's pretty much (if not all) LED signals all the way to Primrose Hill tunnel. Likewise the west london line has a good mixture of normal 3 aspect signalling and LED
That said, i've been authorised to pass a main aspect and a mid section gpl at the same time, and despite my best efforts to keep the conversation professional the signaller was really slap-dash, in place of signaller out at the end he said "cheerie bye" :D
Which raises another possibility...
LED ground position lights and main aspects are a lot easier to see during the day, far less prone to bleaching from sunlight. Blindingly bright at night though.
That's correct, its going back, apparently 001 will be one of the last units to be delivered (had a chat with a Bombardier bloke last week). Unfortunately 378005 hasnt yet accumulated the 2000 miles testing, so the clock resets to zero and it has to accumulate another 2000 miles with no...
AFAIK Any individual radio cannot be called directly, hence you would get a call along the lines of "Driver of two delta three four please contact blah". However you can ring out to internal and external numbers directly as my DI demonstrated by ringing his mobile (on depot of course - and...
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.