• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. RichardGore

    ERTMS rollout on ECML and GWML

    Really? It was my understanding that there were no plans to use either L1 or L1 LS on the GB network. Overlay does not necessarily imply L1.
  2. RichardGore

    Sunday's Signalling Failure at Machynlleth

    What’s the degraded mode operation on an absolute block line if the bells/block instruments are out of action? That seems like the analogous failure mode, would a 1920s signal box have fared any better?
  3. RichardGore

    Would benefits of joining the Schengen area for international rail services be worth the risks?

    Iceland is also part of Schengen, despite being an island much further from the continental coast. I guess they’re just a lot less afraid of brown people than the above posters in this thread.
  4. RichardGore

    Great Western Electrification Progress

    Is not 2024 the start of CP7 rather than CP6? Network Rail's website suggests CP6 is 2019–2024, which had been previously my understanding also.
  5. RichardGore

    ETCS expansion into London Bridge station

    Sure, but they could be? Forgive me if I am wildly misunderstanding the situation but they must be trained eventually; now is as good a time as any, well in advance of the new timetable. It is not my impression that GTR has cash flow issues, and having all the drivers already trained and very...
  6. RichardGore

    ETCS expansion into London Bridge station

    It still seems odd to me that drivers are not using it to gain familiarity, since it’s there anyway.
  7. RichardGore

    ETCS expansion into London Bridge station

    On passing through London Bridge recently I could not help but notice an ETCS block marker within the station, as well as a number of end of cab signalling signs on the approach (and one on the curve from Blackfriars to Cannon St) which were not there before. I recall the limits of ETCS being...
  8. RichardGore

    Why is Thameslink central section linespeed so slow?

    It’s an overlay on fixed-block ETCS L2.
  9. RichardGore

    Is it immoral to split ticket or exploit loopholes in booking engines or easements?

    Applying Immuanel Kant's categorical imperative to split ticketing suggests it's not an issue. If everyone did it, all the time, would the outcome be undesirable? If everyone used split ticketing and took the cheapest valid fares, the powers that be would adjust the easements and fares where it...
  10. RichardGore

    Great Western Electrification Progress

    How foreseeable future really is this foreseeable future? As in for at least the next few months or are we expecting this to be a permanent quirk of the GWML?
  11. RichardGore

    2019 in Rail - Your Hopes, Fears and Predictions

    Hopes: there are no hopes any more Fears/Expectations: * HS2 cancelled * All future electrification schemes cancelled * All current electrification schemes cancelled * Brexit pans out badly including for the railway * ETCS rollout cancelled and plans to remove it from the Thameslink core put...
  12. RichardGore

    Great Western Electrification Progress

    Makes sense. Thanks for looking that up!
  13. RichardGore

    Great Western Electrification Progress

    Really? I wonder what the rationale for this was rather than using the standard ETCS functionality (Packet 68).
  14. RichardGore

    Avignon to Ashford

    Is the issue not resolved now? I had heard that KVB had been installed at Ashford.
  15. RichardGore

    ATO/ETCS languishing unused in the Thameslink core

    Surely that should suggest (training issues notwithstanding) putting it into use as soon as possible, for effectively free extra system testing and building up practical experience?
  16. RichardGore

    ATO/ETCS languishing unused in the Thameslink core

    The last handful of times I've been through the Thameslink core (at least on trains bound for the Sutton Loop Line) they've run through on AWS, judging by the noises emanating from the cab. Most odd. Why are they not running through on ATO or at least under L2? There was a palaver about the...

Top