• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. T

    WSMR to finish

    I know they won't -- they just seem to ignore the RA5 bit whenever anything heavier is requested to travel down here, and grant one-off permissions each time anything is due to run.
  2. T

    WSMR to finish

    Strictly speaking, the entire Cambrian west of Sutton Bridge Jct is RA5, but this hasn't stopped 67s twice doing a wine 'n' dine to Mach (I'm leaving out the Royalexes). I was shown a document recently that outlines the various speed restrictions for any "heavy" loco movement to Aberystwyth or...
  3. T

    WSMR to finish

    If they were going to run a 67+Mk3s+DVT to Aber, they'll probably just bung the ERTMS kit inside the DVT and link it to a display/controls in the cab of the loco, like they're planning on doing with the 5MT this summer, where the kit will be installed in one of the coaches and linked to a...
  4. T

    WSMR to finish

    There's no direct evidence yet, only stories and rumours people have heard, and that includes me. It's quite likely it's all an internal matter for DB-R, so whatever discussions took place will remain secret. There's something very fishy about it all.
  5. T

    WSMR to finish

    As more and more stories/"evidence" emerge of shadowy dealings behind finishing off WSMR, it looks increasingly likely that the original excuse of the £2.8m loss was only a public reason to be trotted out, and the real reasons for its demise being much more complex and political.
  6. T

    ATW to take over 3 W/S sets

    Da iawn - Cymro arall ar RailUK. (Very good, another Welshman on RailUK) Could you forward the link to my photos to your colleagues please, as some of them were telling me that they'd like to see the photos when I put them on the net...
  7. T

    ATW to take over 3 W/S sets

    Merlodlliw, what was your source for this info, and do you know if they still stand by it if ATW are denying it? We do need this sort of info to be accurate, as you can appreciate. ('Dwi dal yn flin am beth digwyddodd i WSMR.)
  8. T

    WSMR to finish

    I've just been catching up with several days' worth of forum posts on here, so apologies. Firstly, it's desperately sad, and my heart goes out to all the staff and their families affected by this. In a right and just world, these things don't happen, but we're not in one of these. It broke my...
  9. T

    Class 70 Written Off Maybe ?

    Ben Jones on twitter via @modelrailUK posted this: "Getting reports that Freightliner's brand new 70012 has been dropped onto the quayside at Newport after crane lifting it snapped." Model Rail mag is from the same outfit as Rail, and share various staff.
  10. T

    UK Railtours Barmouth Bridge Express, Jan 8th

    Nope. Confirmed top and tail Class 67s. Until someone somewhere changes their minds about it.
  11. T

    UK Railtours Barmouth Bridge Express, Jan 8th

    There's the small problem that a skip has 2 fewer wheelsets than a shed. Class 66: 130t over 6 axles, axle load = 21.5t, RA 7 Class 67: 88t over 4 axles, axle load = 22t, RA 8
  12. T

    UK Railtours Barmouth Bridge Express, Jan 8th

    Edit: I believe 66s are cleared as far as Morfa Mawddach. It's just in practice that they don't go any farther north than Tywyn because of places to run round the train. Shouldn't stop Top and Tail ones going up there, though, but to date none have ventured farther north than Tywyn.
  13. T

    UK Railtours Barmouth Bridge Express, Jan 8th

    Small problem: 66s aren't cleared past Tywyn either. And Barmouth Bridge has had diddly squat done to it. NR HQ may well pronounce that 67s can go to Barmouth, but I do wonder if they've actually bothered to ask their staff on the ground before they announced this. My guess is that they didn't...
  14. T

    ERTMS Live and working

    I don't why it's so big, it just is. This gives you some idea of what the kit inside the 97/3s fitted with it is like: http://class.trains.railways.fotopic.net/p59905376.html And remember, those are 19" racks. --- old post above --- --- new post below --- NR had been crowing that the...

Top