  1. Fincra5

    Great Northern Fleet - 379s introduction

    At least it gives a sort of warning. A 700, which is Baliase driven for SDO, doesn't tell you the doors won't open until you're basically there!
  2. Fincra5

    Great Northern Fleet - 379s introduction

    Generic for all Electrostars. The "Short Station" is driven by MITRAC Database and GPS. The train only knows its next station has a short platform but cannot know which platform it is for. The GPS tells the train it's within a radius of the station. What allows the, say all 8 coaches, to open...
  3. Fincra5

    Could 387's be fitted with batteries as well as retaining their 3rd rail/ overhead power collection

    Yeah, AFAIK, didn't the 379 also loose it's MCM (Motors) in the MOSL? So there was a loss of available traction power?
  4. Fincra5

    Class 701 'Aventra' trains for South Western Railway: progress updates

    Depends what PIS system the train uses and if a Code is programmed or available for such a Stopping Pattern... If not, then the Guard or Driver should be making PAs.
  5. Fincra5

    Who trains the trainers?

    Usually, the Rolling Stock Owner/ Builder or Trainers from TOCs with Experience and Documentation of the Unit/Loco. There's a lot of background work that goes into the creation of Training Material and we rely on a lot of resources to make it happen.
  6. Fincra5

    Gbrf 769/5 Parcels units, ex 769/9 GWR units

    They wont, if the Track isn't clear for 3rd Rail Either... NR like them removed!
  7. Fincra5

    Great Northern Fleet - 379s introduction

    All GN Drivers are trained. 1749133296 Most likely!
  8. Fincra5

    Great Northern Fleet - 379s introduction

    They should all be turned but guessing for whatever reason a couple haven't been. I'd imagine the need for service is greater than a turning move, which will eventually happen.
  9. Fincra5

    Great Northern Fleet - 379s introduction

    Does appear the 1800 was booked a 379 that had a problem. 1T48 ran as far as Cambridge. So guessing a Crew issue. Now I couldn't sat there's no trains from Cambridge North in that hour...
  10. Fincra5

    Great Northern Fleet - 379s introduction

    There were issues on the GN this morning, unrelated to 379s, which caused delays and thus cancellations/ cut shorts.
  11. Fincra5

    Great Northern Fleet - 379s introduction

    ... Well it was always the plan but the recommissioning has taken longer, due to X, Y & Z. Modifications were required to make these run on the Cambridge & Kings Lynn sections, so nothing could be done until this work was completed and tested reliably.
  12. Fincra5

    Great Northern Fleet - 379s introduction

    Tracklink 3. So far the testing has gone well on the TL3 system on 379s. So will be phased to update the 379 fleet. MITRAC SDO is GPS based, within an area of the station, hence why it cannot do doors per platform length (where mixed) or announce separetly. This makes Tracklink 3 a...
  13. Fincra5

    Grand Central apply for Newcastle - Brighton direct

    Surely this is aimed at 2 Markets. Brighton to Birmingham and then say Reading to York & Newcastle (XC competition). But using 1 service. I doubt many would actually do End to End.
  14. Fincra5

    GWR Class 230 Information, Movements & Discussion.

    Not long enough according to the Sectional Appendix
  15. Fincra5

    Great Northern Fleet - 379s introduction

    They platform needs the tests it wasn't able to have done before... Lighting, SDO, etc.
  16. Fincra5

    Grand Central order Hitachi Tri-Modes - confirmed

    Sounds like every rolling stock manufacturer! ;)
  17. Fincra5

    Class 701 'Aventra' trains for South Western Railway: progress updates

    The 700 went into Long Term "Storage" as it had a motor flashover. Wasn't repairable at Three Bridges, so a solution had to be planned, and ended up at Eastligh. Not quite the same....
  18. Fincra5

    Grand Central order Hitachi Tri-Modes - confirmed

    Not only that, as mentioned previously, the IET is proven product on the ECML. They do not need to go through as many hoops as a new train to introduce them. It makes total business sense. Even down to Stop Car Marks at stations, which are available and in place for 5 car IETs. 1743796012...
  19. Fincra5

    Great Northern Fleet - 379s introduction

    In Hornsey Depot. Sidings are numbered 1 (in this case) being closest to the mainline. Numbered Sidings are known as "Roads" for ease of locating.
  20. Fincra5

    Grand Central order Hitachi Tri-Modes - confirmed

    Absolutely, whilst the IET is bland, its a proven product on the ECML, you can see why any "Long-Distance" operator would select them!