Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
https://www.countypress.co.uk/news/26459614.ryde-pier-shut-off-pedestrian-vehicle-access-cable-works/
Bizarrely and perhaps uniquely there will be no vehicle OR pedestrian access to Ryde Pier Head from 10pm on Friday, September 25 to 5am on Monday, September 28 to allow the installation of a...
A sad end to Jessie's Seat, apparently no longer maintained due to access issues and now accidentally destroyed.
https://guildford-dragon.com/historic-chilworth-chicken-memorial-topiary-accidentally-felled-by-railway-upgrade-contractors/
https://www.bbc.co.uk/news/articles/cwynweyk247o
Moderator note: Split from
https://www.railforums.co.uk/threads/transpennine-route-upgrade-and-electrification-updates.88054/
Intriguing post on Skyscrapercity - any truth in Network Rail being interested in the Globe Road development site for two extra tracks approaching Leeds from the west...
A notable milestone for this project, the first Brake Van has returned from Ramparts and the first DM has departed for its running gear and electrical work: https://www.ltmuseumfriends.co.uk/projects/friends/project/33/q-stock
10 years later it has happened again - Monktonmead Brook, which the railway follows from Smallbrook Junction, has once again turned the railway into a river, flooding the track and depot and filling the tunnel to the brim as can be seen on Railcam. Track washouts and damaged rolling stock appear...
Sounds like the capacity upgrade at Ely is all but dead sadly - they're blaming changing travel patterns despite freight being the major beneficiary?
https://www.elystandard.co.uk/news/threat-ely-rail-upgrade-9095796
Some great news in the latest Steam Railway magazine - Barrow Hill's Mervyn Allcock has reportedly signed a 7-year lease on some of the facilities at St Blazey, including the turntable: https://www.mpowerkernow.org/projects
He cautions that it won't be a 'Barrow Hill version 2' but...
Does anyone know, or can find out, information about the runaway train described in the blog post below?
https://hydeparknow.uk/2019/02/21/runaway-tube-trains-2/
I was vaguely aware of this anecdotally and had heard of changes at Shanklin to prevent a repeat, yet this potentially disastrous...
First we had white 5G aerials above each cab, but now both 483s in use have acquired black boxes on the roof, visible in the videos below near the middle of the train. Any ideas?
I'm guessing it's another 5G aerial, but could it be related to the line's upgrade? Cab radio perhaps?
Details are beginning to emerge of the major works coming next winter, with thanks to the IW Bus Users Group - http://www.iwbususers.btck.co.uk/RecentMinutes
According to SWR's programme manager for the project:
Design work is 75% complete.
Platforms heights will be raised or track lowered to...
The big story today is that a two-train service has finally resumed, presumably marking the long awaited return of 007 from it's lengthy overhaul?
https://www.islandecho.co.uk/island-line-resumes-normal-2-train-service/?fbclid=IwAR06EMNrZgp4twtWQq4qq1CHxR_urPtbRz1nq_Kh9Bk9ffKx5o-UWiS9u6E
I think this project may have passed this forum by, but the NER 'Electric Autocar' is nearing completion at Embsay.
"There’s still work to do but we’ve set a launch date in October. This is for members and supporters, but the general public will have their chance as soon as possible afterwards"...
With the first test runs expected this year some photos have now emerged of the progress being made.
The June 2015 edition of Pullman & CIWL News shows on pages 41-45 the body of Car 85 as well as a general update of how the project is progressing, further TV appearances, a possible event at...
BBC - HS2: Heathrow spur plans dropped by transport minister
An inevitable, common sense decision - the high cost, limited frequency and wasteful use of paths for the likely traffic was never going to be justified.
Presumably Higgins will suggest an alternative use for the paths this frees...
The data for Q3 (October-December) 2014/15 is now available:
Passenger journeys up 6.7% on Q3 2013/14
Passenger km up 6.5%
Revenue up 9.0%
L&SE Passenger Journeys up 8.0% / Passenger km up 6.8% / Revenue up 9.6%
Regional Passenger Journeys up 3.1% / Passenger km up 5.0% /...
ORR Passenger Usage Report
Not only have passenger journeys increased but as Roger Ford pointed out "after a couple of years flatlining passenger km are rising again in all three sectors":
London & South East passenger kilometres increased by 2.8%, Long Distance was up 5.5% and Regional up...
South East Route: Sussex Area Route Study Draft for Consultation
http://www.networkrail.co.uk/long-term-planning-process/south-east-route-sussex-area-route-study-draft-for-consultation/
I think this is probably worth it's own thread, there's no shortage of talking points. Perhaps of the...
The Bluebell-owned 4-VEP 3417, looked after by the SETG, is heading from it's recent storage at Clapham Junction to Ilford Depot for restoration.
The Bluebell's Facebook page has the following announcement:
Chris
A consultation has been launched on a future London Overground interchange at Old Oak Common: click here for information and to reply
Through the Options Assessment Report they've narrowed it down to three possibilities:
- Option A would involve one new station to the west of the HS2 station...
The operation of shuttles on the freight-only Brentford branch have now been confirmed, using Didcot's Steam Railmotor:
www.didcotrailwaycentre.org.uk/news/latest.html#news01
Chris
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.