Definitely Not MML Electrification progress updates: A6006 bridge reconstruction

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Joined
5 Aug 2015
Messages
869
Location
Norfolk
There are a number of non-rail projects looking to connect at this site, and other rail GSP sites, like Patford Bridge. This data is available if you go looking at NESO's registers. And you can also see some of Network Rail's future demand connections here too.
Really!? Which registers in particular, I've poked around the excel sheets available for NESO's 10 Year Electricity Statement hunting for transformer MVAs, but there are quite a few railway supply sites missing that I know should be there.
 

InTheEastMids

Established Member
Joined
31 Jan 2016
Messages
1,382
Really!? Which registers in particular, I've poked around the excel sheets available for NESO's 10 Year Electricity Statement hunting for transformer MVAs, but there are quite a few railway supply sites missing that I know should be there.
Tranmission Entry Capacity I think. It's possible not everything is there, I don't know the detailed rules around when projects go into the public version. I never saw MMLE substations listed (phew, back on topic!). HS2 ones e.g. Quainton are though, and are something like 100-120 MVA if memory serves.
 
Joined
5 Aug 2015
Messages
869
Location
Norfolk
Just downloaded the Feb26 TEC register and can't find any railway activity although they may be hiding behind different key words. I did indeed find renewable/battery schemes connecting to some of the substations I know are 25kV only at the moment. Couldn't find HS2 which are at Ickenham, Quainton and Berkswell. I expect there to be some Scottish ones: at the grid sites Glenrothes, Stannergate, Galashiels, Clyde's Mill
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,583
This bridge forms the main access to a proposed new battery development that will connect to National Grid's network at the substation.

That’s not yet been given planning consent though, AIUI.

There’s also a solar farm proposal next door too.


I guess the batteries can charge from the Grid during the night when the railway doesn't need the power, and possibly even supply the railway during the day.

The battery energy storage system (BESS) proposed at Braybrooke is 300MW / 1.2GWh. An order of magnitude higher than any conceivable demand for power from the railway there. To put it in context, 300MW is very approximately 65% of the average traction electricity demand of the entire GB network. It’s also enough to keep the lights on in Harborough for about 2 months.
 
Joined
5 Aug 2015
Messages
869
Location
Norfolk
The battery energy storage system (BESS) proposed at Braybrooke is 300MW / 1.2GWh. An order of magnitude higher than any conceivable demand for power from the railway there. To put it in context, 300MW is very approximately 65% of the average traction electricity demand of the entire GB network. It’s also enough to keep the lights on in Harborough for about 2 months.
I assume these battery storages are used to smooth out demand rises while waiting to turn on generation sources that are a bit slow. I'm thinking if some windfarms were being asked to ramp up generation, it might take them some 10s of minutes to do so and in the mean time the battery can deliver the power in that area. Since Market Harborough 400kV substation has no DNO connection (currently just 2x 50kV single phase transformers!) it'd be feeding power into the surrounded NG sites which are: Staythorpe to the north (major 400kV hub as well as handling 14x 132kV circuits for the East Mids/Lincolnshire/South Yorks, and even a little supply for the ECML) and to the south Grendon and Sundon which do Northamptonshire/Bedfordshire/Hertfordshire and the latter has another MML supply point
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,590
Location
Nottingham
I assume these battery storages are used to smooth out demand rises while waiting to turn on generation sources that are a bit slow. I'm thinking if some windfarms were being asked to ramp up generation, it might take them some 10s of minutes to do so and in the mean time the battery can deliver the power in that area.
From the figures below it's more ambitious than that. 1.2GWh divided by 300MW means the batteries can supply their full power for 4 hours, or maybe a bit less due to system inefficiency. Ultimately systems of this size will contribute to battery and other storage filling the gaps from no solar at night and from no wind on calm days, and almost or totally removing the need for fossil fuels in electricity generation.
The battery energy storage system (BESS) proposed at Braybrooke is 300MW / 1.2GWh. An order of magnitude higher than any conceivable demand for power from the railway there. To put it in context, 300MW is very approximately 65% of the average traction electricity demand of the entire GB network. It’s also enough to keep the lights on in Harborough for about 2 months.
Noted thanks. The railway certainly won't be able to take all the power but having a largeish user next door should reduce transmission losses. Also having generation and storage near the main users of the power reduces the problems the grid has in creating capacity to bring it from further away.
 
Joined
5 Aug 2015
Messages
869
Location
Norfolk
From the figures below it's more ambitious than that. 1.2GWh divided by 300MW means the batteries can supply their full power for 4 hours, or maybe a bit less due to system inefficiency. Ultimately systems of this size will contribute to battery and other storage filling the gaps from no solar at night and from no wind on calm days, and almost or totally removing the need for fossil fuels in electricity generation.
How interesting! Market Harborough's immediate neighbour Staythorpe is actually a 1.7GW gas power station which perhaps it could replace. And if they did build a 132kV DNO connection it might be able to minimise the use of the 350MW Corby gas power station as well.
1770243754578.png
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,235
From the figures below it's more ambitious than that. 1.2GWh divided by 300MW means the batteries can supply their full power for 4 hours, or maybe a bit less due to system inefficiency. Ultimately systems of this size will contribute to battery and other storage filling the gaps from no solar at night and from no wind on calm days, and almost or totally removing the need for fossil fuels in electricity generation.

Noted thanks. The railway certainly won't be able to take all the power but having a largeish user next door should reduce transmission losses. Also having generation and storage near the main users of the power reduces the problems the grid has in creating capacity to bring it from further away.
The main target for battery is
a) week day evening peaks hence the 4 hour sizing
b) mornings before solar starts being useful (smaller than a) )

Hence two cycles per day
 

Dazza12

Member
Joined
10 Aug 2022
Messages
18
Location
Derby
Hi,
The main target for battery is
a) week day evening peaks hence the 4 hour sizing
b) mornings before solar starts being useful (smaller than a) )

Hence two cycles per day
Indeed, if we wanted to get rid of big gas generators then we are looking at a lot more wind generation and a total amount of energy storage around 3000 to 10000 times greater than is being built here (if we optimistically assume that there are never periods of greater than 10 days when the wind doesn't blow).

This is a plant designed to reduce the use of open cycle gas generation and diesels, its scale (on its own) has no material impact on the viability of wind generation.
 

InTheEastMids

Established Member
Joined
31 Jan 2016
Messages
1,382
Network Rail is talking up the A6006 Kirk Hill bridge reconstruction as a key part of a number of interventions that have improved clearances on the MML to make it more suitable for freight, particularly containers.

There is a brief mention of how the new structure further provides sufficient clearance for electric or bi‑mode trains should el*********ion be resumed in future
Also, a timelapse video of the bridge demolition and a photo with the new bridge deck (installed at Christmas) at the link below.

 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
Network Rail is talking up the A6006 Kirk Hill bridge reconstruction as a key part of a number of interventions that have improved clearances on the MML to make it more suitable for freight, particularly containers.

There is a brief mention of how the new structure further provides sufficient clearance for electric or bi‑mode trains should el*********ion be resumed in future
Also, a timelapse video of the bridge demolition and a photo with the new bridge deck (installed at Christmas) at the link below.

At least the design work isn't being condemned to a shelf like so many other nixed schemes. Also useful in bringing down the cost & risk should electrification ever be restarted, although shows what potential associated benefits the full MMLe scheme could have brought.
 

londonmidland

Established Member
Joined
22 Dec 2009
Messages
2,347
Location
Leicester
Does anyone know if the wooden pegs, which were used for surveying(?), have come in useful, should electrification restarts again? Or would this all need to be done again, from scratch?
 

Merle Haggard

Established Member
Joined
20 Oct 2019
Messages
3,850
Location
Northampton
Does anyone know if the wooden pegs, which were used for surveying(?), have come in useful, should electrification restarts again? Or would this all need to be done again, from scratch?

The ones on the Up side around East Midlands Parkway disappeared - presumably removed - when the electrification in the area was cancelled. Presumably the same story elsewhere.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,853
Location
Beeston (Notts)
The ones on the Up side around East Midlands Parkway disappeared - presumably removed - when the electrification in the area was cancelled. Presumably the same story elsewhere.
I think some have remained near Trent Jn, but have now been weathered beyond the point of legibility.
 

InTheEastMids

Established Member
Joined
31 Jan 2016
Messages
1,382
Does anyone know if the wooden pegs, which were used for surveying(?)
Replacing them will be the easy bit because any competent organisation will have very precise location data for them in the design information.

At least the design work isn't being condemned to a shelf like so many other nixed schemes. Also useful in bringing down the cost & risk should electrification ever be restarted, although shows what potential associated benefits the full MMLe scheme could have brought.
I agree, but if you look a the business case for the bridge replacement, its benefits are weaker as a standalone intervention. So was it still a good use of taxpayers money at this point, or simply the least-worst option because the project had fundamentally got past the point of no return.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
I agree, but if you look a the business case for the bridge replacement, its benefits are weaker as a standalone intervention.
True
So was it still a good use of taxpayers money at this point, or simply the least-worst option because the project had fundamentally got past the point of no return.
As it's part of a wider gauge enhancement project, it's still a good use of taxpayers money. This is not simply rebuilding one bridge because the contracts cost too much to cancel, but making use of work already done to provide a tangible benefit (gauge enhancement) at lower cost while also leaving provision for the future enhancement originally designed for.

From the press release:
Through detailed gauging analysis and close collaboration with industry partners, Network Rail has now unlocked additional routes across the East Midlands. Trent High Level, including the Ratcliffe Junction-Toton and Attenborough Junction-Toton sections, and the Trent-Nottingham-Boultham Junction route to Lincoln, are also now available for larger freight containers.
These are quite substantial additions to the freight gauge-cleared network. (Red Circle is Trent High Level/Ratcliffe Jn/Toton/Attenborough Jn, Red Line shows Trent-Nottingham-Boultham Jn.
Turqouise is W12, Light Blue W9, Dark Blue W8, Purple W7, Pink W6. Note this is normal clearance and does not include things like RT3973 form clearances.
1780476887623.png
This work now provides an alternative container route from Birmingham to Doncaster, potentially easing pressure on the Masborough-Swinton section.
(Caveat that the clearances listed on Open Railway Map may not be 100% accurate).
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,853
Location
Beeston (Notts)
Network Rail now reporting that the bridge has reopened to vehicle traffic.
Major milestone for Kirk Hill bridge project as road closures end: Kirk Hill bridge-7

Monday 20 Jul 2026

Major milestone for Kirk Hill bridge project as road closures end​

Region & Route: Eastern: East Midlands | Eastern
Road closures near Kirk Hill bridge were lifted as planned on Friday 17 July as Network Rail’s reconstruction project remains on target and nears completion.
Because diversion routes must be the same type of road as the road being closed, several nearby roads were also closed to prevent them being used as shortcuts, allowing the Kirk Hill bridge project to be carried out safely.
All traffic restrictions were removed on Friday as planned, with Network Rail having completed the bulk of the bridge reconstruction work, which will bring benefits including:
  • providing clearance for larger‑gauge freight trains – allowing more goods to move by rail instead of road, helping reduce congestion and supporting a more sustainable transport network.
  • improving rail maintenance access to support progress towards removing a long‑standing speed restriction and improving reliability
  • offering sufficient clearance under the new bridge for electric or bi‑mode trains, should Midland Main Line electrification be restarted in the future.
The bridge reconstruction was originally planned as part of the Midland Main Line electrification programme. Although electrification was paused, the Department for Transport approved the project to continue because of the long-term benefits it delivers for freight and the railway, while ensuring the route is ready should electrification proceed in future.
The demolition of the old bridge took place over Christmas 2025, meaning no passenger service disruption because trains do not run in this area on Christmas Day or Boxing Day. Other critical work has been carried out overnight and at weekends, allowing engineers to deliver the project while keeping the railway open.
The project has seen Network Rail teams and lead contractor AmcoGiffen install a temporary utility bridge to safely carry gas, electricity, water and broadband services throughout the work; install new bridge components; construct new parapet walls with 14,000 bricks and high-strength concrete to meet modern safety standards; install utility services into the new bridge deck; and complete highway and drainage works.
Still to be carried out ahead of the planned completion in September are the demobilisation of the work compound and reinstating the site.
Nick Wilton, Network Rail senior sponsor, said:
“The project at Kirk Hill bridge was planned to minimise disruption for passengers as much as possible while we delivered this important structural upgrade. However we recognise that there has been some unavoidable disruption for residents and businesses because of the road closures, and we’re sorry for the inconvenience caused.
“We’ve worked with the council to mitigate this as much as we could, and we’ve remained in close contact with the community. Feedback from our regular meetings with the community was taken on board from the beginning.
“We’re pleased to have reached another important milestone with the removal of road restrictions and we thank everyone for their patience as we complete the last of our tasks – taking down our compound and reinstating the site.”
 

WAO

Established Member
Joined
10 Mar 2019
Messages
1,216
In other words the clearance part of MMLEP (typically 25% of cost) is still ongoing, pause notwithstanding, under the guise of freight clearance (not paused).

Good on yer, Heidi!

WAO
 

Dr Hoo

Established Member
Joined
10 Nov 2015
Messages
5,604
Location
Hope Valley
In other words the clearance part of MMLEP (typically 25% of cost) is still ongoing, pause notwithstanding, under the guise of freight clearance (not paused).

Good on yer, Heidi!

WAO
If the clearance part is “still ongoing” what’s the next location?
 
Joined
5 Aug 2015
Messages
869
Location
Norfolk
(typically 25% of cost)
It is intriguing that a huge amount of effort and risk has gone (and is going) into developing discontinuous electrification solutions to deal with that 25%. Of course I support progress to reduce those costs, especially the approach that recent schemes have with VCCs and other minor innovations where even GWEP would have pushed for replacing the structure.

Of course, figures change around a lot and I'd imagine the civil engineering enabling cost goes quite high if you have something like the Severn Tunnel on your project. But these are some numbers from Furrer+Frey which suggest just 15% go towards things I'd consider "work on structures". Perhaps this graph comes from a particular project and so 25% is more representative.

Either way, there's clearly a majority of cost that gets spent on a lot of other stuff which isn't the electrification assets or enabling work and there doesn't seem to be a lot of effort spent on trying to reduce especially when you compare that to the wonderous world of discontinous electrification, which still requires new OLE going up (and also PSU work on existing stuff) and so will still cost many things on the "indirect" side.
1784635173126.png
 

InTheEastMids

Established Member
Joined
31 Jan 2016
Messages
1,382
If the clearance part is “still ongoing” what’s the next location
Many other bridges in this area were done 10 years ago. I haven't seen anything to suggest there is an ongoing pipeline of structures work that'd enable gauge clearance or electrification.

So unless we get announcements etc., I think this bridge replacement happened because of some combination of the overall condition of the bridge and/or the contract having already been awarded - ie cost to cancel made it better value to proceed with the works.

Given the cost pressures on transport, it is objectively weird to proceed with something that seems to have such weak benefits in the absence of electrification
 

AirGamer

Member
Joined
18 Jan 2022
Messages
5
Location
Hull
Many other bridges in this area were done 10 years ago. I haven't seen anything to suggest there is an ongoing pipeline of structures work that'd enable gauge clearance or electrification.

So unless we get announcements etc., I think this bridge replacement happened because of some combination of the overall condition of the bridge and/or the contract having already been awarded - ie cost to cancel made it better value to proceed with the works.

Given the cost pressures on transport, it is objectively weird to proceed with something that seems to have such weak benefits in the absence of electrification

According to post #24, An application to rebuild Marle Pit Hill bridge was put in, but had been withdrawn after electrification was cancelled.

Presumably this needed greater clearances for electrification, but was it deemed fine for freight as is?
 

londonmidland

Established Member
Joined
22 Dec 2009
Messages
2,347
Location
Leicester
I notice East Midlands Gateway to Felixstowe intermodal traffic is now routed this way, instead of the long way around via the West Midlands.

Does any other intermodal traffic use this section of the MML?
 

WAO

Established Member
Joined
10 Mar 2019
Messages
1,216
Pure conjecture but freight clearance would likely be done on a route basis, not bridge-by-bridge as one out of gauge structure would restrict the while route, making the other work pointless.

It also seems that freight clearance generally (W8) is enough for OLE, particularly with present rules.

WAO
 
Joined
5 Aug 2015
Messages
869
Location
Norfolk
I think there can be situations where an unelectrified line has a certain gauge clearance and can theoretically support OLE, but if you electrify it, the gauge will decrease. So neither the higher gauge nor electrification individually requires interventions except that if you want both than you will need to rebuild things. I believe this is the case with some parts of the TRUP route
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,583
In other words the clearance part of MMLEP (typically 25% of cost) is still ongoing, pause notwithstanding, under the guise of freight clearance (not paused).

Good on yer, Heidi!

WAO

The clearance part of MMLe has definitely been paused.


So unless we get announcements etc., I think this bridge replacement happened because of some combination of the overall condition of the bridge and/or the contract having already been awarded - ie cost to cancel made it better value to proceed with the works.

Correct.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,590
Location
Nottingham
Pure conjecture but freight clearance would likely be done on a route basis, not bridge-by-bridge as one out of gauge structure would restrict the while route, making the other work pointless.

It also seems that freight clearance generally (W8) is enough for OLE, particularly with present rules.

WAO
It is certainly done on a whole route basis. However if a bridge needs to be re-built for other reasons then (unless there's a major reason not to) it will be re-built to provide clearances for future larger gauges and electrification.

Larger gauges generally need extra clearances in the top corners, as they are driven by carrying larger containers, whereas electrification needs more clearance above the centre of the track (extending over the pantograph width). So arch bridges are more likely to need work for gauge enhancement and beam bridges are more likely to need work for electrification.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,583
So arch bridges are more likely to need work for gauge enhancement and beam bridges are more likely to need work for electrification.

I think ithe positin is:

Arched bridges are more likely to need work for gauge enhancement, but for OLE installation any type of bridge will need work if it is not sufficiently high over the track itself.
 