Thanks. Makes sense of the differences. Even the layout of the actual depot is different. The main shed has lines both sides of it and I guess is longer so four roads of two units (8) has become three roads of three units (9). The ancillary (ish) buildings have moved to the other side of the main building so are not nearer the A470. The sidings on the station side are longer and slightly more 9 roads of 3 or 4 cars balanced by the roads (No 10 to No 14) at the Cardiff end having gone - space taken by the longer shed perhaps.Yes, that site plan is from March 2018 and was associated with planning application 18/0314/HYB. The plan was revised in application 19/0380/RVOC in April 2019, as the second access point, the 'Y' junction under Fford Bleddyn required the road to be raised on a 6m embankment. The primary access point was changed to be dual tracks at the south end of the site that curved north under Cardiff Road to join the line, and a spur off one of these tracks that ran south under a second bridge on Cardiff Road alongside the sliproad that links Cardiff Road to the A470 (see the plan here).
The south-facing link was dropped in application 20/0806/16 in 2022 due to the 'significant utilities' issue. Looking at the utilities surveys for the earlier applications, there is a 9-inch water main that runs between the A470 slip road and the railway to a junction where Cardiff Road meets Fford Bleddyn, and then continues along the sliproad to the A470 with a 4-inch branch that heads north under Cardiff Road (see the Welsh Water survey plan here). This is exactly where the bridge was going to be constructed to carry Cardiff Road over the south-facing link. I believe there is also a gas main in that area too, that runs through the old Garth Works site onto Fford Bleddyn and onto Cardiff Road (see the Wales & West Utilities survey plan here - it looks like it was routed under the old railway sidings in the site).
That layout improvement is probably allowed by not having the Y junction. That was pointing up the valleys and down to Cardiff so close to the station and came out of the side of the depot site so not having that makes rail access into the side of the depot site not necessary. The final layout of the depot looks better EXCEPT for the tight U turn out of the depot onto the main line. That water main has a lot to answer for !.
Last edited: