• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Recent content by terryc

  1. T

    NW platform extensions

    Building work on Platform 1 extension looks complete, but not yet 'open' (as of Wednesday) Platform 2 building work not complete but is still ongoing.
  2. T

    NW platform extensions

    Work due to restart this month. Apparently delay was due to if the new Parkside development was going to have rail access, the down platform could have fouled the trackwork. Network Rail have since stated that would not be the case, even if rail connection is made in the future.
  3. T

    Newton le Willows Platform Extensions

    Despite being started months ago, both platform extensions to the east of the station appear to have stalled. The platform edges have been completed, but the actual platform tops are unfinished, and are therefore still out of use. Has anyone any idea as to the cause of delay? Many Thanks
  4. T

    Golborne Railway Station reopening updates

    I'm sure that was the reason behind the car sharing, which was thankfully improved once the new car park was opened. However, it's still difficult to find a space after 8:00 am. I think some sharing is still going on to some lesser degree, judging by the number of cars still parked at Golborne...
  5. T

    Golborne Railway Station reopening updates

    At a local public meeting in Golborne just prior to lockdown, Andy Burnham stated that the station at Golborne would definitely be going ahead. https://lowtonandgolbornenews.co.uk/re-opening-of-golborne-station-to-be-discussed-at-public-meeting/ At the moment, numerous commuters meet and park...
  6. T

    Golborne station reopening - How might it be served?

    Adding a stop for the Man Airport to Cumbria TPE was the service mooted. (I would have thought however that TPE wouldn't be too happy slowing that service...?) IIRC, Merseyrail was also mentioned as being interested in providing a service. For me, a (Northern) stopping service from Warrington...
  7. T

    Wigan-Bolton electrification. Construction updates only please

    I would have thought that approach control to the "mickey mouse" signal over the A573 would be the method on the Down line would be the solution for anything going into Wallgate? A brief few seconds stop whilst mode was changed over, then away.
  8. T

    Heinz Factory near Wigan to get its own siding?

    Slight digression, but there's an excellent cab ride video on Don Coffey's YouTube channel of the Knowsley binliner service, showing the reversal and also the container 'swops' in the depot (an internal 'pad'). Not sure if YouTube links are allowed here so I wont post it.. just do a search on...
  9. T

    Heinz Factory near Wigan to get its own siding?

    I did also think about this, but wouldn't top and tailing increase (double?) the carbon footprint of the service, which goes against the initial principle of the whole concept?
  10. T

    Heinz Factory near Wigan to get its own siding?

    I'm still curious as to how the return journey will be made? As there is no longer a loop at Burscough Bridge, then is it a trip all the way to Southport to run around?
  11. T

    Heinz Factory near Wigan to get its own siding?

    Should be fine. The regular Teeside to Knowsley (66+FKA's?) binliners pass through a-ok
  12. T

    Heinz Factory near Wigan to get its own siding?

    Wouldn't a simple loop be more efficient than a siding, and take up minimal space, with a load / unload facility adjacent? So a 50% width increase on the permanent way for a few hundred metres, and the loading facility on Heinz land? That would also provide a run-round option for eastbound exit...
  13. T

    New Station calendar

    Although I was only a young lad at the time, I too don't recall an original service to Manchester, but the services to the south IIRC went via Newton le Willows and Earlestown junctions / stations
  14. T

    New Station calendar

    Would make sense to site it in the same, or very close area as plenty of land where the old coal sidings were, and is adjacent to a current car park which does have scope for enlargement onto the afore mentioned NR land
  15. T

    New Station calendar

    The Golborne station reopening was always going to be close to the top of Andy Burnham's agenda, seeing that he lives in the town :smile: , and is much more likely to go ahead than the proposed parkway station at Kenyon, as that would need cooperation from Warrington Cheshire, which is situated...

Top