Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
Cost I feel may have something to do with that, you can’t buy a 66 anymore, a 69 is in the region of 1.5million. I suspect 60’s would be ready for use having spent considerably less than a 69, which depending on what contract they have lined up for them may work out well for them.
Recently went through interview for a rolling stock engineer, although it was for already qualified/skilled.
I took from that the norm is 2/3rds of the shifts are nights.
But as you said depots will have many different shift patterns.
Slightly off topic although related. Would a large windowed train be possible considering the strict guidelines rolling stock is built to (im thinking structural strength etc etc)
Quick question for anyone who has had contact with northern since interview.
I had a missed call from HR today and was unable to get back in touch.
Anyone able to shed any light on weather this is good or bad news.
Once all sets that due back arrive, will these trains get up to Edinburgh again?
I'm not a fan of the Azumas, so would be good to know I could book onto a mk4/91 set instead of enduring the torture of the 80x seats
Has anyone seen the lumo YouTube channel. Looks like they’ve employed some bored children to produce them.
Actually I take that back, some bored children would have done a much much better job!
As the title says, will the class 395 ever be deployed on other routes other than hs1. Im not upto speed on them and my only real reasoning for asking this question is i know the 373's worked the ecml.
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.