There aren't enough of them for the Southeastern services they operate. They will almost certainly be a fleet (of 29 units) which remains on the network they were built for throughout their working lives. Put simply, nothing else can operate the services they work and the particular features they have aren't needed elsewhere.As the title says, will the class 395 ever be deployed on other routes other than hs1. Im not upto speed on them and my only real reasoning for asking this question is i know the 373's worked the ecml.
Doubt it very much, they're very much well used by SouthEastern passengers on HS1 services to Kent so you have to replace them as to saying that they won't be anything like Pre Covid loadings I have to disagree as they are still fairly well loaded even off peak considering how many people I've seen at various Kent stations waiting for the HS1 service or actually onboard them.Maybe they could work a low cost low frills service similar to the old cross country services. Margate to Birmingham. They won’t be at anywhere like pre Covid loading as those were mainly commuters.
Maybe they could but the idea wouldn't have a low cost.Maybe they could work a low cost low frills service similar to the old cross country services. Margate to Birmingham. They won’t be at anywhere like pre Covid loading as those were mainly commuters.
Maybe they could but the idea wouldn't have a low cost.
Of course, they already operate part of a regular Margate to Birmingham service which involves a relatively short walk on the way and carries far more passengers than a through service would.
There is lots of discussion on here about the ten minute walk between Euston and St Pancras but actually the break in the journey might actually help with the attention span of children as does the speed and interest of HS1 and, one day, HS2. Children like fast trains, not rambling ones.Whilst it is a short walk (interchange) , it is much longer if you have luggage and kids etc - maybe the convenience of a through service might sway passengers.
That is going to need a source of funding to support the operation. It isn't going to fill without substantial advertising. We have just had the launch of Lumo which has captured the imagination of people on this forum. I'm guessing the first trains have booked up well. A through 395 service from Birmingham to Margate, which has a very slow bit in the middle and can't use the fast bits of the current route, would need similar marketing and passengers would note they can get to their destination in half the time by changing on (behind) the Euston Road.Maybe they could trial by running it as some sort of ad hoc rail tour that operates weekly to see how numbers are.
Maybe they could trial by running it as some sort of ad hoc rail tour that operates weekly to see how numbers are. Whilst it is a short walk (interchange) , it is much longer if you have luggage and kids etc - maybe the convenience of a through service might sway passengers. It could call at Birmingham International creating an airport link there rather than having to use the overcrowded and expensive London airports ?
There is lots of discussion on here about the ten minute walk between Euston and St Pancras but actually the break in the journey might actually help with the attention span of children as does the speed and interest of HS1 and, one day, HS2. Children like fast trains, not rambling ones.
The Marshlink services have post covid have been 4 car units but the stay cation boost to the likes of Pontins at Camber Sands and the Romney Marsh caravan parks mean that several of the morning departures have left people at Ashford because they are full and standing. A lot of these people come from Stratford on HS1. I know that despite the loss of the commuter traffic Southeastern don't have enough 395s to deal with events like West Ham home matches and the Golf open at deal so Id suggest they are going nowhere.Maybe they could work a low cost low frills service similar to the old cross country services. Margate to Birmingham. They won’t be at anywhere like pre Covid loading as those were mainly commuters.
they prob wouldnt be 395's, more likly a 80X class as they are already rated for 140mph like the 395's just never used for it but thats assuming NPR would be a 140mph line and not fasterI’d like to see more 395s. A new variation of that train for NPR services would be great!
NPR will be using the HS2 line south of Manchester, so they’d need to be capable of matching the line speed on the stretch from Piccadilly to the junction to Liverpool, or all the way down to Crewe. NPR services could also be used as an extension of the Birmingham-Manchester services too, so something capable like a 395 would be useful.they prob wouldnt be 395's, more likly a 80X class as they are already rated for 140mph like the 395's just never used for it but thats assuming NPR would be a 140mph line and not faster
Yes, but equally a 350 shows you don't need a pointy nose to do 110mph on a fast route. Getting the track up to 125mph for a pointy nose on commuter/regional services could only ever be done in limited places on the existing network where it isn't already the case.It demonstrates that higher speed units can be meaningfully used for commuter/regional operation - this will be important moving forwards.
395's wouldnt be able to ordered any more as they are first gen UK A-Trains, it would be a comuter spec'd 80X instead as they are the 2nd gen A-TrainsNPR will be using the HS2 line south of Manchester, so they’d need to be capable of matching the line speed on the stretch from Piccadilly to the junction to Liverpool, or all the way down to Crewe. NPR services could also be used as an extension of the Birmingham-Manchester services too, so something capable like a 395 would be useful.
The 395 are actually a part of the same Hitachi AT300 family, so if the new class numbers had became available much earlier they would probably be 80x anyway…they prob wouldnt be 395's, more likly a 80X class as they are already rated for 140mph like the 395's just never used for it but thats assuming NPR would be a 140mph line and not faster
yea i suspect soThe 395 are actually a part of the same Hitachi AT300 family, so if the new class numbers had became available much earlier they would probably be 80x anyway…
Yes I agree. My earlier point referenced an updated 395. Ideally 200m, but it would depend on how NPR manifests. Doors at 3rds may not be required, even though the doors on a 395 are hardly any different to end doors, just in a different position along the carriage.395's wouldnt be able to ordered any more as they are first gen UK A-Trains, it would be a comuter spec'd 80X instead as they are the 2nd gen A-Trains
80X's are just 395's but with updated tech and a Diesel mode instead of a DC third Rail shoe
Euston to Milton Keynes is timed at 30 minutes on the 1043 Pendolino from Euston and 32 minutes on the 1046 Desiro. That really isn't much of a difference.
Why does that sound familiarIdeally all trains would have identical, very high, performance for ease of timetabling.
In which case we should ditch the 395s all together and only run 373 and 374 formations on HS1. It'd make timetabling of both HS and Classic networks through Kent a lot easier, but make the service offering much, much poorer.Even that small journey time difference can cause significant pathing issues.
Ideally all trains would have identical, very high, performance for ease of timetabling.
And how would passengers travel from stations like Ashford or Ebbsfleet International to St Pancras?In which case we should ditch the 395s all together and only run 373 and 374 formations on HS1. It'd make timetabling of both HS and Classic networks through Kent a lot easier, but make the service offering much, much poorer.
In which case we should ditch the 395s all together and only run 373 and 374 formations on HS1. It'd make timetabling of both HS and Classic networks through Kent a lot easier, but make the service offering much, much poorer.
395s stop too often to really benefit from high speed, and need to gearing for better acceleration more than outright top speed to fit in with the Kent classic services.Or.... buy 300km/h 395-type trains?
395s stop too often to really benefit from high speed, and need to gearing for better acceleration more than outright top speed to fit in with the Kent classic services.
Gearing perhaps being the wrong choice of word - 'setting up' might be more what I was going for.Gearing is no longer the limiting factor it once was.
Motor and traction package technologies have advanced a long way in recent years - as modern Shinkansen performance demonstrates.
In which case we should ditch the 395s all together and only run 373 and 374 formations on HS1. It'd make timetabling of both HS and Classic networks through Kent a lot easier, but make the service offering much, much poorer.
Or.... buy 300km/h 395-type trains?
395s stop too often to really benefit from high speed, and need to gearing for better acceleration more than outright top speed to fit in with the Kent classic services.