• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Recent content by adimac37_19

  1. A

    Overhead Line Engineer

    Thanks for looking guys, I applied for the principal engineer role in Birmingham and have been made an offer so all is ok now!
  2. A

    What are you listening to?

    Metallica - For Whom the Bell Tolls followed by: Bob Seger - Turn The Page
  3. A

    Network Rail Discretionary Fund

    Hi, I found a link to NRs website showing their Discretionary fund schemes (Authorised to completion and Schemes in Development). How often are these updated and how reliable are they? Also, is there anywhere to look to try and find out what projects NR have in the pipeline that they...
  4. A

    Nottingham

    Does anyone know if Nottingham's Line 2 scheme is likely to be going ahead? It looked like quite a big project and having done a recent survey on Line 1, I was quite keen to find out if I could get involved with it.
  5. A

    Overhead Line Engineer

    Hi, Does anyone know of any OLE designer positions that are open or anyone who may be looking for OLE designers in the near future? Preferably in the North West or within 1 1/2 hours of Warrington by train. (So Liverpool, Manchester, Birmingham, those sorts of places) Thanks.
  6. A

    Bonding in an ATFS system area

    Hi, Does anyone know what the maximum track to track bond separation is in an ATFS area? I have looked through NR/SP/ELP/21085 but it only states distances for classic feeding systems. Cheers

Top