swt_passenger
Veteran Member
- Joined
- 7 Apr 2010
- Messages
- 34,227
By May this year, the two Blackfriars bay platforms should be reopened.
So, is there any confirmation yet of which services will terminate there normally? IIRC the various Southeastern services that were effectively 'linked up' with Thameslink Moorgate services (to produce the Key Output 0 timetable) still need to run through the core for the same reason.
Will there be any additional Southeastern services diverted into Blackfriars and terminating? I'm surprised there doesn't seem to be anything in teh public domain yet.
I've intentionally kept this question separate from the one about future Sutton/Wimbledon loop services to avoid confusion, because that one concerns the relatively long term (6 yrs) future.
So, is there any confirmation yet of which services will terminate there normally? IIRC the various Southeastern services that were effectively 'linked up' with Thameslink Moorgate services (to produce the Key Output 0 timetable) still need to run through the core for the same reason.
Will there be any additional Southeastern services diverted into Blackfriars and terminating? I'm surprised there doesn't seem to be anything in teh public domain yet.
I've intentionally kept this question separate from the one about future Sutton/Wimbledon loop services to avoid confusion, because that one concerns the relatively long term (6 yrs) future.
Last edited: