• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

PPM - Should it be in here or in the main forum ?

Status
Not open for further replies.

Mutant Lemming

Established Member
Joined
8 Aug 2011
Messages
3,191
Location
London
Limited to 20mph and with only a handful of seats should Class 139's be classed as light rail or not ?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Mike395

Forum Staff
Staff Member
Administrator
Joined
23 May 2009
Messages
3,399
Location
Bedford
It's designed to run on heavy rail tracks, so I'd say no :)
 

Mutant Lemming

Established Member
Joined
8 Aug 2011
Messages
3,191
Location
London
It's designed to run on heavy rail tracks, so I'd say no :)

..but could it really run on the national rail network ? It is restricted to 20mph on the Stourbridge branch and even then it's a fairly rough ride. I wouldn't fancy it's chances out on the proper rail network.
--- old post above --- --- new post below ---
Simpler answer: it's used by National Rail, so it belongs on the National Rail board.

..but British Railways used to run the Grimsby-Immingham tramway and Vale of Rheidol line.
 
Last edited:

Crossover

Established Member
Joined
4 Jun 2009
Messages
9,493
Location
Yorkshire
..but could it really run on the national rail network ? It is restricted to 20mph on the Stourbridge branch and even then it's a fairly rough ride. I wouldn't fancy it's chances out on the proper rail network.

I'd actually love to see it out on the main line :D

I think part of the reason why they are so shaky is the jointed track of the branch line rather than entirely being the fault of the traction
 

Yew

Established Member
Joined
12 Mar 2011
Messages
7,244
Location
UK
..but could it really run on the national rail network ? It is restricted to 20mph on the Stourbridge branch and even then it's a fairly rough ride. I wouldn't fancy it's chances out on the proper rail network.

I'd actually love to see it out on the main line :D

I think part of the reason why they are so shaky is the jointed track of the branch line rather than entirely being the fault of the traction

Maybe we could hook it with some pacers to the back of a 91 and see what happens at 125?
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,384
Location
Yorks
..but could it really run on the national rail network ? It is restricted to 20mph on the Stourbridge branch and even then it's a fairly rough ride. I wouldn't fancy it's chances out on the proper rail

The Stourbridge Branch is a part of the National network, so by definition it can :)
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
It passed NR's tests for mainline certification, and they were more thorough with it since it wasnt from an experienced manufacturer...
 

Temple Meads

Established Member
Joined
2 Sep 2010
Messages
2,283
Location
Devon
I'll give you my verdict after I've ridden on it on Wednesday ;)

I'm strangely really looking forward to it!
 

185

On Moderation
Joined
29 Aug 2010
Messages
5,709
Deformed Ford transit with a lawnmower engine.

Still better than a 142 though ;)
 

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,573
Location
Macclesfield
The Parry People Movers definitely count as light rail IMO. The Tyne and Wear Metrocars run over heavy rail tracks between Pelaw and Sunderland, but are still light rail vehicles.

As far as the PPMs are concerned, I'd also suggest that they are light rail vehicles in the traditional sense of the days of Colonel Stevens, rather than the ultra-modern supertrams that the term has come to describe in the present day. Quaint little contraptions that they are. They're the minibus equivalent of a Pacer!
 

Schnellzug

Established Member
Joined
22 Aug 2011
Messages
2,926
Location
Evercreech Junction
The Parry People Movers definitely count as light rail IMO. The Tyne and Wear Metrocars run over heavy rail tracks between Pelaw and Sunderland, but are still light rail vehicles.

As far as the PPMs are concerned, I'd also suggest that they are light rail vehicles in the traditional sense of the days of Colonel Stevens, rather than the ultra-modern supertrams that the term has come to describe in the present day. Quaint little contraptions that they are. They're the minibus equivalent of a Pacer!

Although to be fair, a Model T Ford on rails would like a TGV in comparison.
Yes, maybe that's it; they a sort of rail breadvan.
 

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
17,849
Location
Epsom
Has it ever happened yet ( that both 139s were failed at the same time and a 153 was drafted back in )?
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Far as i know the only time the 153 returned was just after the trial when there was only one as the second hadnt arrived to provide cover in case of failure/maintenence. They are averaging 96% reliability and only on one occasion (to my knowledge) have both failed at the same time, second was sent out to recover the first after it failed and it failed too.
 

sprite

Member
Joined
4 Jan 2011
Messages
168
Location
Leeds
All this talk of them looking like transit vans etc, am I the only one that sees them as a railborn Fiat Multipla?
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,348
If it wasnt for the engine using LPG I would be wholeheartedly in support of them to enable more hybrid light/heavy rail projects to occur.
But the LPG thing puts me off.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Their putting a normal diesel engine in the next attempt of their latest trial service, the first attempt the lpg engine didnt have enough oompth for the gradients and the flywheel ran out of power between stations. Also locals were concerned with LPG storage risks. I think they mainly trumpet the LPG to lower the emmisions compared to a normal diesel railcar.
 

150222

Member
Joined
9 Jul 2011
Messages
1,002
They do if the 139s fail.

No they don't! The crews do not sign them anymore. I don't think they are even employed by London Midland. Also they have/are planning to segregate the branch from the rest of the network by lifting the junction to platform 1 at Stourbridge Junction.
--- old post above --- --- new post below ---
All this talk of them looking like transit vans etc, am I the only one that sees them as a railborn Fiat Multipla?

I hope your on about the older one! :)
 

dooton

Member
Joined
18 Nov 2010
Messages
121
No they don't! The crews do not sign them anymore. I don't think they are even employed by London Midland. Also they have/are planning to segregate the branch from the rest of the network by lifting the junction to platform 1 at Stourbridge Junction.
--- old post above --- --- new post below ---


I hope your on about the older one! :)

I don't think so, they are looking at running them on the line to Brierley Hill which means they would be running on the same tracks for a short distance as the 172's. They would have to go into platform 1 as I cannot see there would be free paths into the main platforms. Perhaps this would mean a slight reduction in the shuttle to every 15mins?
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
The connection has already been lifted, the branch line is now physically isolated.
 
Status
Not open for further replies.

Top