Won't the 507/8 units need replacing soon anyway? You could wire Preston - Ormskirk to coincide with a new delivery of 378s to take advantage of this.
Significant new stock in the North?
Won't the 507/8 units need replacing soon anyway? You could wire Preston - Ormskirk to coincide with a new delivery of 378s to take advantage of this.
Well my proposal for 679 DMU carriages is not really enormous and the 23m Sprinters should last long enough to allow them to be replaced by EMUs.
At least one person's not far off my count mentioned at the start. Is there a chance the number required would go down in the future if any of the routes the sprinters/pacers use are electrified before they're due replacement?
That assumes that Cascaded Cl323s end up on the Valley Lines and remove any need for Pacers/Cl150s to be replaced with DMUs on that route, it does however assume rather pessimistically that any electrification on the GWML will not net release any multiple units as the Networkers would be used to strengthen remaining DMU services (such as Chiltern) and would not cascade.
How would 323s be cascaded to the Valley Lines? There won't be enough 319s going to the North West to replace 323s as well as run all the newly electrified routes, so a new order of EMUs for either/both of Northern and LM would be required before 323s get cascaded anywhere.
Well there are all the 319s and the 315s from Crossrail to cascade
Pretty sure that 315s are going to be on their way to the scrap heap upon retirement. Especially seeing as they're older than any existing 14x or 15x unit by about 5 years at least!
What about first capital connect's class 317's etc are these being replaced by the new thameslink trains when the thameslink services are expanded?
Are they going to be running Thameslink Trains onto the ECML via those new tunnels they built? Im still not sure what those are even for
Well there are all the 319s and the 315s from Crossrail to cascade, you should be able to drown the 323s in a horde of multiple units, at which point I just picked them because the fleet is about the right size and they are 3 coaches, so seemed well suited to the Valley Lines.
Well there are all the 319s and the 315s from Crossrail to cascade, you should be able to drown the 323s in a horde of multiple units, at which point I just picked them because the fleet is about the right size and they are 3 coaches, so seemed well suited to the Valley Lines.
315s are to be withdrawn after Crossrail.
Ideally Northern should be getting either 3 car EMUs or 4 car EMUs with SDO considering there are a lot of platforms in the North West that take a maximum of 6 carriages. The 319s are not exactly the best suited units!
On your logic of 315s replacing 323s, why not cascade the 3 car 314s to Cardiff after Valley lines electrification?
Because the 314 class is almost certainly too small to take over Valley Lines operation by itself and would thus require a mixed fleet to be operated on those services, undermining my purpose in concentrating the 323s with one operator in one region.
Also because Id never heard of Cl314s before now
EDIT:
Does this Thameslink to Welwyn thing mean that FCC will have additional multiple units that will be surplus or will Kings Cross/Moorgate Services continue regardless of what happens?
Because the 314 class is almost certainly too small to take over Valley Lines operation by itself and would thus require a mixed fleet to be operated on those services, undermining my purpose in concentrating the 323s with one operator in one region.
Also because Id never heard of Cl314s before now![]()
Bah, then new rolling stock for GWML it is to allow the 319s to go North and send the 323s to Wales.
I'd go for replacing all pacers with stretched, 2 car, articulated, bi-mode Parry people movers. Cruising around northernland at 40mph.
Does this Thameslink to Welwyn thing mean that FCC will have additional multiple units that will be surplus or will Kings Cross/Moorgate Services continue regardless of what happens?
I hope they dont give us the class 314's considering how old they will be by 2018.
yes i think we will happily have the class 323's from Northern & London Midland.
Didn't London midland look at replacing the class 323's with other units?
There will be fewer FCC services into Kings Cross than now, especially offpeak, but more into Moorgate (see below). This is all discussed in the London and SE RUS. The remaining mainline suburban services certainly won't need as much stock as they do now, my personal expectation is that their services into Kings Cross will be able to be covered by a reduced number of the 365s - especially as the Kings Lynns are almost certainly going to be IEPs. So the 321s and 317s look as though they could all be spare, although again they are quite old by 2018.
Then they are also intending to run more trains from the Hertford loop into Moorgate as well - not sure how they'll resource that, but the 313s won't last for ever either...
I am expecting to see an order for class 377/2378's from Bombardier to replace the class 313's on services into Morrgate
Southern have issued a tender for new units in lieu of their 377/5s delayed by Thameslink, so it's likely either the new units they order or the 377/5s will replace the 313s when the 377/5s are released by Thameslink.
Is that SN's 313s or FCC's 313s, there won't be enough in that order to cover both will there?
the 365s will be available for an internal cascade at FCC if IEP goes ahead.
Oh please no. The mistakes that were made in ordering the Pacers should never be repeated with the modern equivalent. I hope that this post was made in jest?I'd go for replacing all pacers with stretched, 2 car, articulated, bi-mode Parry people movers. Cruising around northernland at 40mph.
I hope they dont give us the class 314's considering how old they will be by 2018.
yes i think we will happily have the class 323's from Northern & London Midland.
Didn't London midland look at replacing the class 323's with other units?
Would twenty three metre carriages (As the 323s have) be permitted to run on the Valley Lines? I have heard that there are clearance issues on some of the lines when it comes to clearing vehicles longer than twenty metres.That assumes that Cascaded Cl323s end up on the Valley Lines and remove any need for Pacers/Cl150s to be replaced with DMUs on that route, it does however assume rather pessimistically that any electrification on the GWML will not net release any multiple units as the Networkers would be used to strengthen remaining DMU services (such as Chiltern) and would not cascade.
I thought it was a pretty good idea when it was first suggested that, as a short term interim cost saving measure, that the electrified Valley Lines could receive the 315s released from the Great Eastern by Crossrail (Reduced to run as 3-car trains like their 313 and 314 brethren). However, having considered the advanced age these units will have reached by the time that Crossrail is completed, it seems that new stock would be the only way forward for an electrified Valley Lines network.However, realistically, what else is there that could head down to South Wales? 318s or 320s possibly, but that's about it, and that's a pretty big shift considering the distances involved! Something tells me that there won't be new units involved...