this might sound silly - why dont LM Just order fixed formation 8 car units One Pan so they pull a bit more power off the juice wire.then u can have ya 110mph emus - as its just 2 pans up !!

this might sound silly - why dont LM Just order fixed formation 8 car units One Pan so they pull a bit more power off the juice wire.then u can have ya 110mph emus - as its just 2 pans up !!
If LM are talking 110mph running then is there any hope of removing the painful 75mph speed limit between Northampton and Rugby? Speaking as someone who travels often between MKC and Stafford it seems that 95% of the percieved journey time is on that stretch because it's just fields going past really slowly and never quite having yet gone past Long Buckby. The Northampton loop is a complete disgrace compared to the rest of the WCML.
Not a bad idea but current set up in the depot is the ability to lift 4 cars. If you did this you'd have to pay to rebuild parts of the depot to be able to work on an 8 car in the same way pushing up the price of this.
The only depot that would be able to handle an fixed formation 8 car is the new build Hornsey (which has only just got planning permission).
If LM are talking 110mph running then is there any hope of removing the painful 75mph speed limit between Northampton and Rugby? Speaking as someone who travels often between MKC and Stafford it seems that 95% of the percieved journey time is on that stretch because it's just fields going past really slowly and never quite having yet gone past Long Buckby. The Northampton loop is a complete disgrace compared to the rest of the WCML.
There can't be that many maintenance activities that involve lifting a unit, are there?
It can't be the case surely that most EMUs 319s, 317s, 379s etc, which spend their lives running around in 8-car formations, are split into 4-car units whenever they go to the depot.
Or is it?
Given the power available in the 350's, would it not be possible - assuming the 3 pan tests dont prove too good of course - to run a 12 car set on just two pans and drag/propel the 3rd unit using the other two units?
There can't be that many maintenance activities that involve lifting a unit, are there?
It can't be the case surely that most EMUs 319s, 317s, 379s etc, which spend their lives running around in 8-car formations, are split into 4-car units whenever they go to the depot.
Or is it?
its not beyond any depot to get some more jacks and get them synchronised to cope with an extra four cars, failing that theres a depot in west london called NORTH POLE that Siemens could always use for their heavy repairs thats empty and being wasted!!, such as code 4 bogie changes etc, for individual bogie changes im sure the siemens depots have bogie drop facilities now.
as for having full 8 car emus why not, with common sense diagramming an 8 car fleet would be easy to insert in to the heavy use jobs and still be available to run your rush hour high density services, you will also have some that are stabled during the day and at least one unit will be on planned maintenance, for arguements sake one on casualty, so your availabilty wouldnt be compromised.
just a thought
Please, please, will they run our 360 s at 110 on GEML... an hour to do 50 miles on a semi fast is not good.!!!..and how about our cl 90s 110 mph and our mk 3 125 cugging on at 100 on a good day..
This might be of interest:
http://www.networkrail.co.uk/browse...ember 2011/lm 30 sa project 110 timetable.pdf
I don't think that adding 10 mph will change anything.
Looking at the proposed timetable the Crewe - Euston service will not run via Northampton or join with the Birmingham service. This speeds the Nuneaton - Euston journey time up by 18 minutes.