I just read the description of On Track with Tim’s members only video, and it’s written as though it’s gone.
There is video of it being demolished.

There were engineering trains and on track machines on Huddersfield viaduct on Sunday when I drove past.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

YorksLad12

Established Member
Joined
5 Feb 2020
Messages
2,728
Location
Leeds
Didn't notice any breaks in the steelwork today between Cross Gates and Church Fenton.

Bridge at Church Fenton gone and looking very sorry for itself in the compound, certainly didn't owe anyone anything!

Fixings now appearing around Church Fenton in the wire gap with them clearly using the bridge blockades to get going with the wiring now that the bridge isn't stopping them. Expect the wires to appear during the week blockade, probably after the deck is lifted in. I imagine the bridge team wouldn't thank them for putting some brand new wires in the area of their lift.
Definitely breaks between Cross Gates and Garforth, heading east. Difficult for me to see, but the corresponding westbound masts might be in place.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,678
Definitely breaks between Cross Gates and Garforth, heading east. Difficult for me to see, but the corresponding westbound masts might be in place.
I will check again today as I didn't see any. Lots of sections with twin track cantilevers. Fixings well on with in that area and they don't usually appear until steelwork is done.

== Doublepost prevention - post automatically merged: ==

Update
Didn't see any steelwork good cross gates to Garforth. Return conductor is now up most of the way from cross gates to Garforth. Catenary wire up from Thorpe Park all way through to Barkston Ash at least on the Leeds bound line that I can see.
 
Last edited:

superkev

Established Member
Joined
1 Mar 2015
Messages
2,873
Location
west yorkshire
Latest bumper On Track with Tim Youtube video part 1 shows work on the bridges abd stations east of Leeds including the preperation for the Sat removal of Church Fenton bridge. Part 2 shows the demolition of the A62 Leeds Road bridge, mast installation aroend Colne Bridge, more progress with the canopies at Huddesfield Station as well as the new crossover at the wesf end of the new fast lines.

K
 
Last edited:

quantinghome

Established Member
Joined
1 Jun 2013
Messages
2,925
Do we know when East of Leeds is planned to be energised and in use? Fairly soon or is it waiting for the realignment around Neville Hill?
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,869
Location
Beeston (Notts)
Do we know when East of Leeds is planned to be energised and in use? Fairly soon or is it waiting for the realignment around Neville Hill?
I don't quite know, but it could well be the case that the OLE from Church Fenton is energised to the western Limit of Wiring to the east of Neville Hill (wherever that may be). The sooner it's energised, the slimmer the chance that the copper fairies come to call.

== Doublepost prevention - post automatically merged: ==

West of Huddersfield, a few new Planning Applications have been raised:
  1. 2026/65/91336/W - MVL3/64 (Crimble/Crimble Bank Viaduct) - Listed Building Consent for installation of five overhead electric line equipment portals on piers 2, 6,10,14 & 18 with supporting wall brackets; tubular handrail added to both parapets; new downpipes on north elevation at piers 2, 6,10,14 & 18; Addition of precast reinforced concrete L units installed on the inner face of entire northern parapet. New parapet over north side of Span 1 (Carr Lane) and L unit constructed over south side of Span 1. LISTED BUILDING CONSENT GRANTED.
  2. 2026/65/91337/W - MVL3/76 (Milne/Lockwood Viaduct) - Listed Building Consent for installation of five overhead electric line equipment portals on piers 1, 5, 10, 15 and 19 with supporting wall brackets; tubular handrail added to both parapets; new downpipes on south elevation at piers 1, 5, 10, 15 and 19; parapets on northern side of the viaduct strengthened with addition of precast reinforced concrete L units installed on the inner face (within a Conservation Area). LISTED BUILDING CONSENT GRANTED.
  3. 2026/65/91339/W - MVL3/61 (Slaithwaite Viaduct) - Listed Building Consent for installation of five overhead electric line equipment portals on piers 3, 7 and 11 with supporting wall brackets; tubular handrail to replace existing on span over Bank Gate; new downpipes on same piers connected to existing outflow pipes. Reinforcement of the north parapet with precast concrete L units and rebuilding north side of eastern terminating span over Bank Gate, including replacement of bridge deck, parapet, and reconstruction of flanking pilasters (within a Conservation Area). LISTED BUILDING CONSENT GRANTED.
 
Last edited:

YorksLad12

Established Member
Joined
5 Feb 2020
Messages
2,728
Location
Leeds
I will check again today as I didn't see any. Lots of sections with twin track cantilevers. Fixings well on with in that area and they don't usually appear until steelwork is done.

== Doublepost prevention - post automatically merged: ==

Update
Didn't see any steelwork good cross gates to Garforth. Return conductor is now up most of the way from cross gates to Garforth. Catenary wire up from Thorpe Park all way through to Barkston Ash at least on the Leeds bound line that I can see.
It's weird, because I wouldn't have thought they'd put masts on one side but not the other. It feels as if only one in 10 masts has gone up, eastbound!

I'll see if I can grab some video from the train tomorrow to explain what I mean to people who don't know the area (if I'm awake and remember).
 