No, but they'll be entering service on Cambrian Coast Line services between Machynlleth and Pwllheli on Mon 19/10/26.Have these entered service on the Cambrian yet?
I'm sure there were some fairly confident posts on here earlier this year saying September...
Have these entered service on the Cambrian yet?
I'm sure there were some fairly confident posts on here earlier this year saying September...
(next Monday)197s will start Monday 19th
The plan has since changed to 197s taking over only the Cambrian Coast Line between Machynlleth/Dovey Junction and Pwllheli on Mon 19/8/26,Someone mentioned earlier it would be a 48 hour introduction and the 158s would be gone, so does that mean next Wednesday is the last chance to ride one on the Cambrian? Or will they keep some ticking over as backup? We still get plenty of 153s and 150s in west Wales!
+Someone mentioned earlier it would be a 48 hour introduction and the 158s would be gone, so does that mean next Wednesday is the last chance to ride one on the Cambrian? Or will they keep some ticking over as backup? We still get plenty of 153s and 150s in west Wales!
The 48 hour introduction @BenBracken mentions would surely be Saturday 17th and Sunday 18th, not starting Wednesday - and for Machynlleth to Pwlleli only. That is if the switch over time is needed ?.The plan has since changed to 197s taking over only the Cambrian Coast Line between Machynlleth/Dovey Junction and Pwllheli on Mon 19/8/26,
so between Shrewsbury and Aberystwyth - via Machynlleth/Dovey Junction - will remain 158s for a bit until... we're still trying to find out when.
Nobody knows yet. Whilst looking pretty solid, it could be jeoprdised yet. It relies on CAF getting the regular fleet fully repaired to release Cambrian 197's. they only need 3 per day for the cambrian coast line to go over, and even that is touch and go.The plan has since changed to 197s taking over only the Cambrian Coast Line between Machynlleth/Dovey Junction and Pwllheli on Mon 19/8/26,
so between Shrewsbury and Aberystwyth - via Machynlleth/Dovey Junction - will remain 158s for a bit until... we're still trying to find out when.
It is not. 2 197's will be taken to Pwllheli Sunday ready for Monday morning. Then 1 will come off depot at Machynlleth, the coast will then be self sustaining from there as they will terminate at machynlleth and work the next service back to Pwllheli.+
The 48 hour introduction @BenBracken mentions would surely be Saturday 17th and Sunday 18th, not starting Wednesday - and for Machynlleth to Pwlleli only. That is if the switch over time is needed ?.
Any 48-hour plan is old ("earlier" refers to weeks ago) - the current plan is, as you quoted me saying (first paragraph):+
The 48 hour introduction @BenBracken mentions would surely be Saturday 17th and Sunday 18th, not starting Wednesday - and for Machynlleth to Pwlleli only. That is if the switch over time is needed ?.
...but as you can see from the second paragraph, there's still something we're trying to find out!The plan has since changed to 197s taking over only the Cambrian Coast Line between Machynlleth/Dovey Junction and Pwllheli on Mon 19/8/26,
so between Shrewsbury and Aberystwyth - via Machynlleth/Dovey Junction - will remain 158s for a bit until... we're still trying to find out when.
Someone mentioned earlier it would be a 48 hour introduction and the 158s would be gone, so does that mean next Wednesday is the last chance to ride one on the Cambrian? Or will they keep some ticking over as backup? We still get plenty of 153s and 150s in west Wales!
Is there any engineering work planned on the Cambrian and/or any other TfW served routes in/out of Shrewsbury in the next few weeks? I ask because Realtime Trains appears to be showing many (in some cases all) of the through workings between Aberystwyth and Birmingham to be STPed to start/terminate at Shrewsbury instead of Birmingham between 24th Oct and mid-November. Are they trying to catch-up on the plan they announced earlier this year (which had the first 8 class 197 diagrams in service on the Cambrian in September, then stepping up to 12 Cambrian 197 diagrams in October (and starting hand back of the 158s to Angel) before reaching the full 18 class 197 diagrams (with 158s reduced to zero) in Feb 2027?The plan has since changed to 197s taking over only the Cambrian Coast Line between Machynlleth/Dovey Junction and Pwllheli on Mon 19/8/26,
so between Shrewsbury and Aberystwyth - via Machynlleth/Dovey Junction - will remain 158s for a bit until... we're still trying to find out when.
I think its pretty clear and obvious to see that plans regularly change. Second guessing TFW's plans really isn't worth the time and energy.That doesn't seem to tie up with an FOI release from 2025 though,
Possibly, but it's interesting how according to this thread possibilities vary from all 158s being gone from Aber services in weeks, to spring 2027.I think its pretty clear and obvious to see that plans regularly change. Second guessing TFW's plans really isn't worth the time and energy.
Its all tied into the wider fleet cascades, getting 398s into service and 231s pnto the mainline. That will relieve the pressure on fleet availability.Possibly, but it's interesting how according to this thread possibilities vary from all 158s being gone from Aber services in weeks, to spring 2027.
Either way, I hope they stick around for a while. As 'regional' style trains designed for longer journeys, they're actually very well suited to the route from a passenger's perspective
(next Monday)
2 cars trains on Liverpool to Llanduno services are leading to overcrowding.Its all tied into the wider fleet cascades, getting 398s into service and 231s pnto the mainline. That will relieve the pressure on fleet availability.
If TFW had any sense they would at least keep some 158s, as even with the 197s where they need to be capacity on certain routes is still stretched and they are still seeing decent growth on the network.
Keeping any 158s at Mach also means retaining all operational and maintenance competences and their associated assessments in parallel with competence and assessments for 197s.I can’t imagine TfW hanging onto 158s getting mouldy in Mach and other depots for long,
Your right. But. Of course then Machynlleth is going to have to cope with a mixed fleet for many months I fear.Keeping any 158s at Mach also means retaining all operational and maintenance competences and their associated assessments in parallel with competence and assessments for 197s.
I guess there will also be specific parts and materials held at Mach?
So, no, I can’t see 158s staying longer than necessary.
I'm sure the Maesteg, Ebbw Vale and Cheltenham routes wouldn't complain about having some nice trains for a while before we get our 231sWhen the 197s start taking over the Cambrian services, the 158s will be moved out of Machnylleth to another location within the TfW network before they move on to another TOC. At least that is the current plan anyway.
Easier to confine the first ones to the Coast line and Aberystwyths can work through to Birmingham.Interesting that the Pwllheli line gets the new trains first over Aberystwyth. I’d always thought that branch carried more passengers and its status as a university town creates more demand?
Delete 'move on to another TOC' from that and I think it would be a sensible plan. TfW need more capacity (including, without a major remapping of where TfW run, ETCS-fitted units for the Cambrian) than they have and, from what I've read on here, doing it with all 77 class 197s being based at Chester sounds impossible. I'm assuming the maintenance team at Machynlleth are getting close to completing their training on the work required on 197s, so they are presumably the quickest way the pressure on Chester for 197 maintenance can be eased somewhat (ie. by moving some work on the 21x class 197etcs units to Machynlleth).When the 197s start taking over the Cambrian services, the 158s will be moved out of Machnylleth to another location within the TfW network before they move on to another TOC. At least that is the current plan anyway.