Diesel for trains

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Dr Hoo

Established Member
Joined
10 Nov 2015
Messages
5,702
Location
Hope Valley
AFAK TOC's buy the diesel for their trains, does that put companies like gWr at a disadvantage Vs a TOC like GTR/ Southeastern?
As a starting point surely all operators ‘buy’ their ‘fuel’, whether diesel or traction electricity. Maintenance costs for differently powered stock also have to be considered as part of the overall equation.
 

172007

Member
Joined
2 Jan 2021
Messages
1,170
Location
West Mids
As i understand it all operators pay the same amount for electric as Network Rail Supplies the electric as they have a long term contract. Now the massive, enourmous snag is. When the wind is blowing and electric consumers are being given free electric the railway is still locked into paying the contract ratr. This weekend is a prime example.

I suspect the Class 99 / 8xx and to a degree the Class 93 this autumn and spring will kickstart a debate on who can source railway traction electric. Network rail should/must be made a DNO or Designated Network Operator and work the same as National Grid or South West Power. Surely at some point GBrF will go to the competition authorities with there attornies and await a defence.
 

172007

Member
Joined
2 Jan 2021
Messages
1,170
Location
West Mids
NR is the largest single consumer of electricity in the country.
And is not overly good distributing it too. How many electric trains can run north of weaver Jct at one time, Class 90s in pairs with traction motors isolated so they are limited on electric draw. What a mess.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,942
And is not overly good distributing it too. How many electric trains can run north of weaver Jct at one time, Class 90s in pairs with traction motors isolated so they are limited on electric draw. What a mess.

That a matter of funding. NR is not a funder. If a funder decides to pay for additional power supply capacity, then it happens, as has been shown all over the network.
 

172007

Member
Joined
2 Jan 2021
Messages
1,170
Location
West Mids
That a matter of funding. NR is not a funder. If a funder decides to pay for additional power supply capacity, then it happens, as has been shown all over the network.
Thats my my point. They are a DNO in affect. They should not be looking for funding, they should be providing the means to supply electric to the end consumer through s
transmission charges. This is the same reason why alternative generation and battery farms and electic car charging hubs wait years to be connnected at times.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,328
Location
Bolton
Thats my my point. They are a DNO in affect. They should not be looking for funding, they should be providing the means to supply electric to the end consumer through s
transmission charges. This is the same reason why alternative generation and battery farms and electic car charging hubs wait years to be connnected at times.
Don't DNOs have a special statutory duty that Network Rail lacks? So for this to work they'd need to be given an additional duty.
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,664
And is not overly good distributing it too. How many electric trains can run north of weaver Jct at one time, Class 90s in pairs with traction motors isolated so they are limited on electric draw. What a mess.

Its not a problem specific around / north of Weaver Jn Class 90s do this on the GEML / NLL so I suspect its pretty much standard for them.
 

Top