The extension of the 492 and 495 through the tunnel to Liverpool will surely make the situation in Birkenhead Bus Station more chaotic than it already is.
And I believe was a key reason that Wirral postcodes were changed from L to CH, in order to avoid the cost to Royal Mail of all these tunnel trips.Must cost the bus companies a lot of money
The extension of the 492 and 495 through the tunnel to Liverpool will surely make the situation in Birkenhead Bus Station more chaotic than it already is.
It was absolutely one of the reasons, and Chester mail centre had plenty of excess capacity to handle it. The suspicion that later materialised was also that senior management knew the longterm plan was to close Liverpool and reroute everything to Warrington, which wouldn’t have been sustainable for Wirral.And I believe was a key reason that Wirral postcodes were changed from L to CH, in order to avoid the cost to Royal Mail of all these tunnel trips.
Is it definitely extended as I cant see this on the timetable updates?Not unless they route it like the 464/471/472/487, were to Liverpool they go from Borough Road via Argyle Street straight to the tunnel, & they call at the bus station from Liverpool.
However i don't see the need to extend the 492/495 to Liverpool, as Birkenhead-Liverpool is busy enough as it is.
No, they're not being extended to Liverpool. It was suggested up-thread that they could have been as part of the changes.Is it definitely extended as I cant see this on the timetable updates?
I imagine that the plan is for an integrated public transport fares structure, with no particular differential based on whether they run on tyres or tracks (as is already the case with Saveways and concessionary passes etc)The reducing the 407 to Moreton is one of the many blunders of franchising. Just because a a train runs along the West Kirby corrridor does not mean that a bus service running parallel to it is not required otherwise much of Liverpool would have no need of a bus service due to a train line.
Despite what people say, the trains are far too expensive and there are many people who are willing to get a bus despite the time penalty if it gets them where they want to go. The 38,soon to be 438 is an interurban route route snaking through the top end of the wirral borough to the bottom. The 407 was a more direct bus to Liverpool for residents of Meols,Hoylake and part of West Kirby, Moreton, Bidston and North Birkenhead. It should have been kept as it was, and the evening timetable cordinated with the 438 to create a half an hour frequency in the common sections. Let reason prevail! Merseytravel once used to create tenders that ran exclusively on evenings and sundays to retain links such as the 423, but when they have full control of everything they sever links. It doesn't make sense.
I do have some doubts about the Health and Safety implications of running double decker buses through the old tunnel (HGVs etc. are banned).When the PTE were in charge of things, pre-deregulation, there were limited cross-river services (31/32 New Brighton - Liverpool, 418/419 Heswall - Liverpool, and the Night Tunnel Service) because a lot of resources were put into the rail services between the Wirral and Liverpool. After de-reg, buses have regularly competed with the trains for passengers on this lucrative corridor. I suspect that because there is talk about Merseyrail extensions and upgrades, the PTE may downgrade these tunnel bus services, but only if there was suitable infrastructure for bus turnaround / interchange in Birkenhead town centre. I'm not familiar with the current status at Woodside.
What a silly thing to say. Double deckers run perfectly fine through the tunnel and have done for decades. If there were any health and safety implications here, do you really think that Merseytravel would be letting 22 buses per hour each way run through the tunnel?I do have some doubts about the Health and Safety implications of running double decker buses through the old tunnel (HGVs etc. are banned).
If you want to decimate public transport usage and significantly increase private vehicle usage, you've got the nail on the head there.There are interchange opportunities but need some rerouting work to better link with Conway Park and Birkenhead Central stations. That said, the area around Central station is planned to be blitzed for new housing with flyover removal, which may provide the opportunity for better integration.
There simply isn't the demand for 5 buses and hour between Moreton and West Kirby for the majority of the year. It's extremely rare to see 407s run this section with more than single figure passenger numbers.The reducing the 407 to Moreton is one of the many blunders of franchising. Just because a a train runs along the West Kirby corrridor does not mean that a bus service running parallel to it is not required otherwise much of Liverpool would have no need of a bus service due to a train line.
I know I've had differences of opinion with you in the past but you're on the money here.What a silly thing to say. Double deckers run perfectly fine through the tunnel and have done for decades. If there were any health and safety implications here, do you really think that Merseytravel would be letting 22 buses per hour each way run through the tunnel?
If you want to decimate public transport usage and significantly increase private vehicle usage, you've got the nail on the head there.
This nonsense of forcing people to change from buses to train under the guise of integration simply will not work. Even if the bus and train were both free of charge, people wouldn't do it because it stupid and faffy. The bus takes around 10 minutes from Sir Thomas Street to Birkenhead Bus Station. The train from Liverpool Lime Street to Conway Park is 8 minutes. By the time you add on connection time from train to bus (normally around 10 minutes), and all of the escalators/lifts/stairs at the stations, you are looking at 15+ minutes longer per journey by forcing this silly connection upon people. Yippee for integration and improving peoples journeys. By making them longer, adding more points of failure, and forcing connections.
The irony of your claim is public transport usage would be decimated and private vehicle usage significantly increased - well, that's already happened because of the folly of deregulation. All LCR and MPTE are doing is putting the public interest ahead of commercial considerations. If you think that the current schedules are justified, I think you may be in for a shock. Unless demand is there, there is no way the PTE will continue to allow the current traffic flow of 20+ buses per hour through either tunnel, when a 5-minute frequency already exists between Birkenhead and Liverpool on Merseyrail. Some of the legislation may have changed, but Merseytravel still have a statutory duty as part of the Transport Act 1968 to provide their operating area with an integrated public transport system, and current duplicating bus / train movements will not be a long-term view.If you want to decimate public transport usage and significantly increase private vehicle usage, you've got the nail on the head there.
Personally I'd be shrinking the 38 to Moreton then keep the 407 extension to West Kirby, but then I'd additionally use the 407 frequency and extend it to Caldy High or the Grammar Schools to remove one of the school buses and better use the core bus network to provide such movements. It'd also help to improve reliability of the 38 as it would be a shorter route.There simply isn't the demand for 5 buses and hour between Moreton and West Kirby for the majority of the year. It's extremely rare to see 407s run this section with more than single figure passenger numbers.
Your arguments don't stack up. "unless demand is there" but you are saying that the bus operators are putting their commercial considerations first. So either there is demand and bus operators are running because there is money in it for them, or there isn't sufficient demand for these buses and that would mean bus operators are losing money. In which case, if they are losing money and running through the tunnel for the sake of it, that isn't putting commercial interests first?All LCR and MPTE are doing is putting the public interest ahead of commercial considerations. If you think that the current schedules are justified, I think you may be in for a shock. Unless demand is there, there is no way the PTE will continue to allow the current traffic flow of 20+ buses per hour through either tunnel, when a 5-minute frequency already exists between Birkenhead and Liverpool on Merseyrail.
A standard double-decker bus is typically about 4.2–4.4 metres high.There are no Health & Safety implications in running double deck buses through the tunnel.
Then buses follow the very well rehearsed plan of diverting via the Wallasey tunnel.So what happens if the middle lanes are blocked?
They have to wait in the queue until the emergency services (usually the tunnel police) have cleared the problem.A standard double-decker bus is typically about 4.2–4.4 metres high.
The old Mersey Tunnel—the Queensway/Birkenhead Tunnel—has a normal maximum height limit of 3.9 metres. However, local passenger buses may be granted permission to use it up to 4.75 metres, provided they use a middle lane when over 3.9 metres.
So what happens if the middle lanes become blocked?
So where is your evidence that this is a major issue, let alone (as you originally framed it), a Health and Safety issue? Double deckers have safely worked through the tunnel for decades.A standard double-decker bus is typically about 4.2–4.4 metres high.
The old Mersey Tunnel—the Queensway/Birkenhead Tunnel—has a normal maximum height limit of 3.9 metres. However, local passenger buses may be granted permission to use it up to 4.75 metres, provided they use a middle lane when over 3.9 metres.
So what happens if the middle lanes become blocked?
Ah yes, the folly of deregulation.The irony of your claim is public transport usage would be decimated and private vehicle usage significantly increased - well, that's already happened because of the folly of deregulation. All LCR and MPTE are doing is putting the public interest ahead of commercial considerations. If you think that the current schedules are justified, I think you may be in for a shock. Unless demand is there, there is no way the PTE will continue to allow the current traffic flow of 20+ buses per hour through either tunnel, when a 5-minute frequency already exists between Birkenhead and Liverpool on Merseyrail. Some of the legislation may have changed, but Merseytravel still have a statutory duty as part of the Transport Act 1968 to provide their operating area with an integrated public transport system, and current duplicating bus / train movements will not be a long-term view
And do we, for completeness, know how many buses are currently operating in the Merseyside area?Ah yes, the folly of deregulation.
When Merseyside PTE was created, it had c1300 vehicles (1000 Liverpool, 225 Birkenhead, 75 Wallasey). After absorbing Southport and St Helens it had 1396 so it had already lost 80 odd vehicles. By 1986, it was about 1200 because of the decline in passenger numbers during the 1970s and 1980s (despite subsidies
Fewer, obviously. They're talking of c.700 new vehicles plus you have the schools fleets too (so probably a 1000) whilst the 1200 doesn't include the Ribble and Crosville vehicles (c.500) - fleets that also experienced a marked decline between 1969 and 1986.And do we, for completeness, know how many buses are currently operating in the Merseyside area?
I guess the issue for me is whether operating vehicles that don't fit in one lane and barely fit in the other would present increased risk of injury and worse in the event of a very serious incident.So where is your evidence that this is a major issue, let alone (as you originally framed it), a Health and Safety issue? Double deckers have safely worked through the tunnel
Demand is there.Unless demand is there, there is no way the PTE will continue to allow the current traffic flow of 20+ buses per hour through either tunnel, when a 5-minute frequency already exists between Birkenhead and Liverpool on Merseyrail.
It’s no different to any other road where there is restricted width or restricted height. There’s nothing more intrinsically dangerous about running double deckers through the tunnel compared to running double deckers anywhere else.I guess the issue for me is whether operating vehicles that don't fit in one lane and barely fit in the other would present increased risk of injury and worse in the event of a very serious incident
Double deck buses have used the tunnel since it opened in 1934 albeit initially on a limited basis. The cross-river services, as we see them now, began in the 1970s under Merseyside PTE and have continued ever since.I guess the issue for me is whether operating vehicles that don't fit in one lane and barely fit in the other would present increased risk of injury and worse in the event of a very serious incident.
If not fine. Otherwise you would seek to mitigate this risk and using single deckers would be the obvious, as well as trying to reduce bus movements.
The old Mersey Tunnel—the Queensway/Birkenhead Tunnel—has a normal maximum height limit of 3.9 metres. However, local passenger buses may be granted permission to use it up to 4.75 metres, provided they use a middle lane when over 3.9 metres.
So what happens if the middle lanes become blocked?
Probably equidistant (or as close as dammit) to Birkenhead CentralDemand is there.
It’s also only 8tph from Conway Park, which is the nearest station to Birkenhead Bus Station.
It’s no different to any other road where there is restricted width or restricted height. There’s nothing more intrinsically dangerous about running double deckers through the tunnel compared to running double deckers anywhere else.
although they were very rare through the Birkenhead Tunnel pre-deregulation as far as I remember.Double deck buses have used the tunnel since it opened in 1934 albeit initially on a limited basis. The cross-river services, as we see them now, began in the 1970s under Merseyside PTE and have continued ever since.
Double deck buses have used the tunnel since it opened in 1934 albeit initially on a limited basis. The cross-river services, as we see them now, began in the 1970s under Merseyside PTE and have continued ever since
Again, my ignorance is showing here. For comparison, how tall were double decker buses in 1934?A standard double-decker bus is typically about 4.2–4.4 metres high.
The old Mersey Tunnel—the Queensway/Birkenhead Tunnel—has a normal maximum height limit of 3.9 metres. However, local passenger buses may be granted permission to use it up to 4.75 metres, provided they use a middle lane when over 3.9 metres.
Yeah, although Birkenhead Central is more of a pain to get to because you have to get across the dual carriageway first. Central also has 6tph but it's not at an even headway, there are two 15-minute gaps in service every hour. At least Conway Park, as a more modern station, is fully accessible and has a more even headway.Probably equidistant (or as close as dammit) to Birkenhead Central
....except it's in a tunnel