Depressing observations from Chris Gibb, formerly of HS2:
“they are negotiating to increase the fleet from 432 carriages to 530 carriages. This will provide a fleet of 60 trains, of which 25 will be 250m (ten-carriages) for Glasgow and Manchester to London services. This fleet will replace the 644 Class 390 and 807 vehicles, in part to provide depot space to maintain the new trains. Washwood Heath's contract and planning permission will be varied to have 250m facilities. Will 530 carriages replace 644 carriages and provide more seats and faster journeys on all routes? With no kitchens, limited luggage space, tewer tables etc. there may be a tew more on some routes, but no room for growth. So compulsory reservations will be used to suppress and constrain demand. The two extra carriages will be unpowered, so the weight will add up to eight minutes to the remaining Glasgow to London hourly journey, and they will not tilt.
Even with ETCS and £200m spent on track changes they will be much slower than a new tilting train would be on that route, which would not only run up to 140mph but could be twelve-coaches long: enough seats for passenger volume growth to drive real economic growth in Scotland and Manchester. It won't be possible to easily add either more services or carriages later: this plan will use up all the track capacity on HS2”