GRALISTAIR
Established Member
Well I am none the wiser!
So now should be the perfect time to get access and plug it with pumped concrete...I was in Whitehaven last week [to see the Nao Santa Maria replica]
and noticed that the marina water was tolerably clear - but not as good as it was prior to Nov 2022, nor when the "Siltbuster" was running.
Due to the drought the beck is in low flow conditions and so it is not bringing down huge amounts of the dirty water.
So now should be the perfect time to get access and plug it with pumped concrete...
Its been put out of use until May 2027 officially, though nothing to stop it opening earlier if some sort of rapid solution is found.
Not the only one. The restriction can easily be extended.Id put good money on it not being open by May
One of the serious suggestions was to pump the tunnel drainage & the contaminated water "out to sea" and without treatment.And then it goes where?
<snip>
Wherever it went before without being noticedAnd then it goes where?
my guess would be starting with a search for the magic money treeWe could do with the Environment agency and NR coming out with a clear roadmap of how the reopening will be progressed. It all seems a bit wishy washy at the moment.
my guess would be starting with a search for the magic money tree
Surely someone must have made an FOI request to either or both agencies at this point looking for this?We could do with the Environment agency and NR coming out with a clear roadmap of how the reopening will be progressed. It all seems a bit wishy washy at the moment.
Surely someone must have made an FOI request to either or both agencies at this point looking for this?
Very well said. Discussions about whether repairs are worth doing can only be conducted once estimates of cost and time required are available.If the roadmap is known, pressure can be applied to locate the said tree. It would also help to know if there is any thing else holding it up at the moment.
Over 13 months since closure and everything seems to have gone quite quiet.
I'm sure it was a flippant comment, but I did hear someone (who should be in the know) say they'd written off the northern part of the line...
That's all very well, but the northern part of the line is where the passengers are. Aside from Sellafield commuters and tourists, there's not a great deal of passenger traffic between Corkickle and Millom, but unless you want to have separate services either side of a break, it's kind of useful to have a through service available.Over 13 months since closure and everything seems to have gone quite quiet.
I'm sure it was a flippant comment, but I did hear someone (who should be in the know) say they'd written off the northern part of the line...
There doesn't seem to be much traffic towards the south from north of Sellafield, most traffic at St Bees etc is towards the North, and if that bit is out because of the tunnel....The northern part of the line is relatively busy. It's the middle bit that serves little purpose in passenger terms.
Well we are 13 months in to separate services either side of the break, so it doesn't seem to be entirely unworkable.That's all very well, but the northern part of the line is where the passengers are. Aside from Sellafield commuters and tourists, there's not a great deal of passenger traffic between Corkickle and Millom, but unless you want to have separate services either side of a break, it's kind of useful to have a through service available.
I imagine that if they filled the tunnel with foam concrete, it would be very difficult for anyone to prove huge future liabilities against the railway.Besides, writing off Bransty tunnel doesn't remove the non-transport liabilities. There's the water issue (I doubt the harbour commission will let that go, even if the Environment Agency does) and there's the maintenance of the tunnel itself. Somehow I doubt Whitehaven would be happy if the tunnel beneath the town - or more importantly, the main roads through the town centre - was allowed to fall into disrepair.
Repairing the track bed may be expensive, but at least there's some revenue from doing it. Closing the line under Whitehaven is all cost with no revenue.
The northern part of the line is relatively busy. It's the middle bit that serves little purpose in passenger terms.
Even that's not true.
There are plenty of passengers using Millom, Bootle, Sellafield etc.
Thats incorrect. Wildly.Over 13 months since closure and everything seems to have gone quite quiet.
I'm sure it was a flippant comment, but I did hear someone (who should be in the know) say they'd written off the northern part of the line...
No, all that does is satisfy a regulatory requirement and puts a date on it. Nothing stops it reopening before that if the problem is fixed.I notice the sectional appendix has been updated to show the tunnel out of use until May 2027.
I don’t think in this bodes well. I’ve never seen a portion of a line temporarily closed in the sectional appendix like that unless it is some sparsely used freight line.
I think what has happened is a huge shame. The line used to have 4-hour gaps in the timetable under BR between Millom and Whitehaven. Before the tunnel issue it had a roughly service from roughly 0600-2100. And of course got its Sunday service back for the first time since the 70s.
The current situation south of the tunnel is considerably stripped back from that.
And as the country’s finances get worse I can see this happening elsewhere where money has to be spent.
Closing Whitehaven - Sellafield/Millom would save maintenance/renewals of route and cut traincrew costs, although you would have to introduce some form of bus transport. Shame the coalmine near Whitehaven was blocked as the cost of the tunnel repairs could of been shared with them.Repairing the track bed may be expensive, but at least there's some revenue from doing it. Closing the line under Whitehaven is all cost with no revenue.
Closing Whitehaven - Sellafield/Millom would save maintenance/renewals of route and cut traincrew costs, although you would have to introduce some form of bus transport.
Closing Whitehaven - Sellafield/Millom would save maintenance/renewals of route and cut traincrew costs
Are there anymore maintenance nasties waiting in the wings between Millom and Corkickle to warrant total closure? If not id have thought the least politically damaging solution is just to continue with the status quo albeit with a more sparse parliamentary service continuing from Millom or Sellafield to Corkickle.
).