Might the Whitehaven tunnel issues result in closure? Could Whitehaven be brought back into use? And other speculation on this issue...

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,718
Its been put out of use until May 2027 officially, though nothing to stop it opening earlier if some sort of rapid solution is found.
 

StoneRoad

Member
Joined
6 Jan 2010
Messages
486
Location
Haltwhistle
I was in Whitehaven last week [to see the Nao Santa Maria replica]
and noticed that the marina water was tolerably clear - but not as good as it was prior to Nov 2022, nor when the "Siltbuster" was running.
Due to the drought the beck is in low flow conditions and so it is not bringing down huge amounts of the dirty water.
 
Last edited:

Acathater

Member
Joined
11 Dec 2025
Messages
729
Location
NorthWest
I was in Whitehaven last week [to see the Nao Santa Maria replica]
and noticed that the marina water was tolerably clear - but not as good as it was prior to Nov 2022, nor when the "Siltbuster" was running.
Due to the drought the beck is in low flow conditions and so it is not bringing down huge amounts of the dirty water.
So now should be the perfect time to get access and plug it with pumped concrete...
 

Straus

Member
Joined
20 Jun 2025
Messages
118
Location
Manchester
So now should be the perfect time to get access and plug it with pumped concrete...


And then it goes where?

== Doublepost prevention - post automatically merged: ==

Its been put out of use until May 2027 officially, though nothing to stop it opening earlier if some sort of rapid solution is found.

Id put good money on it not being open by May
 

StoneRoad

Member
Joined
6 Jan 2010
Messages
486
Location
Haltwhistle
And then it goes where?
<snip>
One of the serious suggestions was to pump the tunnel drainage & the contaminated water "out to sea" and without treatment.
Which I thought was bizarre, as the Marina were not allowed to use the tides to flush out the mucky stuff from the harbour.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,389
Location
Yorks
We could do with the Environment agency and NR coming out with a clear roadmap of how the reopening will be progressed. It all seems a bit wishy washy at the moment.
 

yoyothehobo

Member
Joined
21 Aug 2015
Messages
853
We could do with the Environment agency and NR coming out with a clear roadmap of how the reopening will be progressed. It all seems a bit wishy washy at the moment.
my guess would be starting with a search for the magic money tree
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,389
Location
Yorks
my guess would be starting with a search for the magic money tree

If the roadmap is known, pressure can be applied to locate the said tree. It would also help to know if there is any thing else holding it up at the moment.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,523
Location
Taunton or Kent
We could do with the Environment agency and NR coming out with a clear roadmap of how the reopening will be progressed. It all seems a bit wishy washy at the moment.
Surely someone must have made an FOI request to either or both agencies at this point looking for this?
 

eldomtom2

On Moderation
Joined
6 Oct 2018
Messages
2,393
If the roadmap is known, pressure can be applied to locate the said tree. It would also help to know if there is any thing else holding it up at the moment.
Very well said. Discussions about whether repairs are worth doing can only be conducted once estimates of cost and time required are available.
 

Straus

Member
Joined
20 Jun 2025
Messages
118
Location
Manchester
Over 13 months since closure and everything seems to have gone quite quiet.

I'm sure it was a flippant comment, but I did hear someone (who should be in the know) say they'd written off the northern part of the line...
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,706
Location
"Marston Vale mafia"
Over 13 months since closure and everything seems to have gone quite quiet.

I'm sure it was a flippant comment, but I did hear someone (who should be in the know) say they'd written off the northern part of the line...

The northern part of the line is relatively busy. It's the middle bit that serves little purpose in passenger terms.
 

Minnietheminx

Member
Joined
31 Aug 2021
Messages
66
Location
Barnsley
Over 13 months since closure and everything seems to have gone quite quiet.

I'm sure it was a flippant comment, but I did hear someone (who should be in the know) say they'd written off the northern part of the line...
That's all very well, but the northern part of the line is where the passengers are. Aside from Sellafield commuters and tourists, there's not a great deal of passenger traffic between Corkickle and Millom, but unless you want to have separate services either side of a break, it's kind of useful to have a through service available.

Besides, writing off Bransty tunnel doesn't remove the non-transport liabilities. There's the water issue (I doubt the harbour commission will let that go, even if the Environment Agency does) and there's the maintenance of the tunnel itself. Somehow I doubt Whitehaven would be happy if the tunnel beneath the town - or more importantly, the main roads through the town centre - was allowed to fall into disrepair.

Repairing the track bed may be expensive, but at least there's some revenue from doing it. Closing the line under Whitehaven is all cost with no revenue.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,348
The northern part of the line is relatively busy. It's the middle bit that serves little purpose in passenger terms.
There doesn't seem to be much traffic towards the south from north of Sellafield, most traffic at St Bees etc is towards the North, and if that bit is out because of the tunnel....

On a peripheral note, does anyone know why the route via Egremont (through a town and some sizeable villages) closed whilst the route via Nethertown (through the middle of nowhere!) stayed open? Was it another case of closing infrastructure by "line" rather than assembling the most useful track available?

== Doublepost prevention - post automatically merged: ==

That's all very well, but the northern part of the line is where the passengers are. Aside from Sellafield commuters and tourists, there's not a great deal of passenger traffic between Corkickle and Millom, but unless you want to have separate services either side of a break, it's kind of useful to have a through service available.
Well we are 13 months in to separate services either side of the break, so it doesn't seem to be entirely unworkable.
You could operate Sellafield (later Millom) to Barrow and Whitehaven to Carlisle as separate branches.
Besides, writing off Bransty tunnel doesn't remove the non-transport liabilities. There's the water issue (I doubt the harbour commission will let that go, even if the Environment Agency does) and there's the maintenance of the tunnel itself. Somehow I doubt Whitehaven would be happy if the tunnel beneath the town - or more importantly, the main roads through the town centre - was allowed to fall into disrepair.

Repairing the track bed may be expensive, but at least there's some revenue from doing it. Closing the line under Whitehaven is all cost with no revenue.
I imagine that if they filled the tunnel with foam concrete, it would be very difficult for anyone to prove huge future liabilities against the railway.

And thats assuming the tunnel is actually in danger of collapse as it is, rather than merely being unusable for heavy trains.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,706
Location
"Marston Vale mafia"
Even that's not true.

There are plenty of passengers using Millom, Bootle, Sellafield etc.

I wouldn't class Millom as the middle bit. Indeed I can see, if the tunnel is not repaired, this becoming the northern terminus of the southern section once Sellafield is done with transporting flasks and has a lower commuter demand.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,718
Over 13 months since closure and everything seems to have gone quite quiet.

I'm sure it was a flippant comment, but I did hear someone (who should be in the know) say they'd written off the northern part of the line...
Thats incorrect. Wildly.
 

King Lazy

Member
Joined
24 Apr 2019
Messages
158
I notice the sectional appendix has been updated to show the tunnel out of use until May 2027.

I don’t think in this bodes well. I’ve never seen a portion of a line temporarily closed in the sectional appendix like that unless it is some sparsely used freight line.

I think what has happened is a huge shame. The line used to have 4-hour gaps in the timetable under BR between Millom and Whitehaven. Before the tunnel issue it had a roughly service from roughly 0600-2100. And of course got its Sunday service back for the first time since the 70s.

The current situation south of the tunnel is considerably stripped back from that.

And as the country’s finances get worse I can see this happening elsewhere where money has to be spent.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,718
I notice the sectional appendix has been updated to show the tunnel out of use until May 2027.

I don’t think in this bodes well. I’ve never seen a portion of a line temporarily closed in the sectional appendix like that unless it is some sparsely used freight line.

I think what has happened is a huge shame. The line used to have 4-hour gaps in the timetable under BR between Millom and Whitehaven. Before the tunnel issue it had a roughly service from roughly 0600-2100. And of course got its Sunday service back for the first time since the 70s.

The current situation south of the tunnel is considerably stripped back from that.

And as the country’s finances get worse I can see this happening elsewhere where money has to be spent.
No, all that does is satisfy a regulatory requirement and puts a date on it. Nothing stops it reopening before that if the problem is fixed.
 

3RDGEN

Member
Joined
6 Mar 2023
Messages
639
Location
Hull
Repairing the track bed may be expensive, but at least there's some revenue from doing it. Closing the line under Whitehaven is all cost with no revenue.
Closing Whitehaven - Sellafield/Millom would save maintenance/renewals of route and cut traincrew costs, although you would have to introduce some form of bus transport. Shame the coalmine near Whitehaven was blocked as the cost of the tunnel repairs could of been shared with them.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,706
Location
"Marston Vale mafia"
Closing Whitehaven - Sellafield/Millom would save maintenance/renewals of route and cut traincrew costs, although you would have to introduce some form of bus transport.

There already is a parallel bus service which I expect is already nicking numbers from the railway due to the £3 (soon £2) fare and passes. Some locals seem to prefer it as it goes closer to where they are going:


Only 4 a day and nothing on a Sunday, but it could be upgraded for a fraction of the cost of the railway.

== Doublepost prevention - post automatically merged: ==

Closing Whitehaven - Sellafield/Millom would save maintenance/renewals of route and cut traincrew costs

It would also simplify the operation somewhat.

A logical pattern would probably be something like extending the Newcastle-Carlisle service to Whitehaven hourly, and the south end being Manchester Airport-Barrow hourly with two-hourly extensions to Millom (with the Windermere hours just starting from Lancaster but otherwise being the same), all Class 195 worked from Barrow depot.
 
Last edited:

Killingworth

Established Member
Joined
30 May 2018
Messages
6,490
Location
Sheffield
An occasional Cumbrian Coast heritage special train doesn't attract the same levels of interest seen for the Settle and Carlisle line!
 
Joined
9 Dec 2012
Messages
843
Are there anymore maintenance nasties waiting in the wings between Millom and Corkickle to warrant total closure? If not id have thought the least politically damaging solution is just to continue with the status quo albeit with a more sparse parliamentary service continuing from Millom or Sellafield to Corkickle.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,706
Location
"Marston Vale mafia"
Are there anymore maintenance nasties waiting in the wings between Millom and Corkickle to warrant total closure? If not id have thought the least politically damaging solution is just to continue with the status quo albeit with a more sparse parliamentary service continuing from Millom or Sellafield to Corkickle.

I'd imagine coastal erosion is a risk, just like it is on the Cambrian (change one letter, get largely the same issues minus the tunnel :) ).
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,309
Location
Bolton
Network Rail are still on the hook for their portion of the cost of the works, nothing has changed in that regard. It will still be restored to previous layout.

The problem is the rather large number of other stakeholders, including the local authority, coal remediation authority, harbour and other landlords nearby. Some of them will agree and others won't but until it's signed off we don't know. Liability if the problem with the harbour is recurrent is another risk factor as well as the cost of the works.
 

Top