birchesgreen
Established Member
So, not a big bloke in a top hat?
An end to different-coloured chairs for the different sides of the office??Just out of interest, when Great British Railways finally comes in. What do you think will be the future of all the splintered current Network Rail and TOC’s control rooms?
Close but not quite right.Back in the oughties I worked in the Virgin Trains Control on Smallbrook Queensway in Birmingham which housed both XC and WC. I understand there was a lot of pressure to move us in with Network Rail and other TOCs in the Mailbox to became an ICC. Virgin resisted it but when the franchise passed to Arriva in 2007 the stance changed and XC and WC moved in along with London Midland Trains.
Unfortunately the Mailbox was far from what was expected - mice running over your feet !!! So XC Control left and moved "back" to XC HQ building ikn Birmingham and I believe LM also moved out. The ICC didn't really work out.
These are the charter operators for railtours?the freight ancillary operators like Rail Adventure, LSL and WCR
Thanks for the correction.Close but not quite right.
Virgin WC were in the Mailbox before 2007 alongside Central Trains (I'm going to guess I visited them in there in 2004 or 5)
I think a lot of NR staff were expected to move to Milton Keynes, but that didn't altogether materialise. I remember a former colleague who lived in Walsall electing not to commute to Milton Keynes everyday !!As you say Cross Country didn't come in until after Arriva took them over and then left.
It ended because NR decided to split their Control and send half of their staff to Rugby and the other half to Saltley. Virgin and London Midland didn't want to split their staff (and I don't think Saltley had the room) so they retreated to their respective head offices in Birmingham City Centre) Different now but that's another story!
Yes. I had mice run over my shoes mope than once !!How the Mailbox Canteen got a score of 5 when I saw mice run across the floor has always made me wonder about places which don't get a score of 5....
Quite! The MFK move saw an enormous amount of experience let go.I think a lot of NR staff were expected to move to Milton Keynes, but that didn't altogether materialise.
Quite! The MFK move saw an enormous amount of experience let go.
That's very interesting - I was going to ask if it's at all comparable to other control centres such as emergency services, or air traffic control?Also seen some external staff from say the emergency services (inc. their control) really struggle, yet some succeed and progress.
Yeah there was definitely one about the introduction of a computerised system for mileage based train maintenance in the Wessex area and they all said control in that way. There might have been 2 videos: the first about a Southampton points failure causing the wrong unit to end up at the depot for planned inspection, and the other has the infamous Paul Tyreman playing a sloppy driver who didn't report a break fault until the very end of his shift. I can't seem to find them either!Does anyone remember the 80s BR (possibly NSE) training video where they always say "CON-trol" with the emphasis on the first syllable? Very odd. I can't seem to find the video though...
Wessex area sounds right, I'm sure one of the scenes is someone pretending to talk into a telephone who says "Pompey" about 30 times in 30 secondsYeah there was definitely one about the introduction of a computerised system for mileage based train maintenance in the Wessex area and they all said control in that way. There might have been 2 videos: the first about a Southampton points failure causing the wrong unit to end up at the depot for planned inspection, and the other has the infamous Paul Tyreman playing a sloppy driver who didn't report a break fault until the very end of his shift. I can't seem to find them either!
Does anyone remember the 80s BR (possibly NSE) training video where they always say "CON-trol" with the emphasis on the first syllable? Very odd. I can't seem to find the video though...
That's very interesting - I was going to ask if it's at all comparable to other control centres such as emergency services, or air traffic control?
On the other hand, the controls in the ROC feel quite cut off from the rest of the railway, and the locations themselves range from uninspiring to utterly grim.From a jealousy perspective summer late turns or 12hr nights were particularly bad seeing all the people enjoying themselves in the bars outside in the basin
And Shefali on the rare occasion she did the weather outside !!From a jealousy perspective summer late turns or 12hr nights were particularly bad seeing all the people enjoying themselves in the bars outside in the basin
Interesting to learn about the consequences of Central and WCML South routes. I think they're trying to make a WCML North route as well, maybe to ultimately join them together like East Coast route?Don’t ever remember any talk of moving to MK but I was against splitting the 2 sides of NR which at the time left 1 RCM going to Rugby but managing Saltley too.
So what was the justification for NR splitting apart the Midland area into Central and WCML South? Kind of sounds like a disintegration of operations caused by NR machinations rather than privatisation directly. But equally interesting to learn about the events which ultimately led to XC control working out of an office with a somewhat un-resilient power supply.It ended because NR decided to split their Control and send half of their staff to Rugby and the other half to Saltley. Virgin and London Midland didn't want to split their staff (and I don't think Saltley had the room) so they retreated to their respective head offices in Birmingham City Centre) Different now but that's another story!
STP planners are generally part of a wider train planning department and wouldn't normally be considered to be control.I would say "Control" colloquially refers to resource managers, STP train planners, and the information delivery teams at the train operating companies. May also extend to Network Rail signalling and ECRO staff.
Set up for NR LNW South used to be;I'd be quite interested to know if anyone can share any examples of how geographies are divided up within a Route by NR Train Running Controllers, and within a company area by TOC Service Controllers (although these are sometimes also called TRCs??). Obviously, I'd imagine it has a lot to do with the intensity of service.
I think I'm missing something, but if the previous four controllers (WCN, WCS, WM, Ch) are *not* the TRCs? Then who are they?2 x TRC = 1 x WC, 1 x WM (TOCs had their own route controllers as well)
In the last days of 222 Marylebone Road , I found a discarded copy of the Tanganikan Rule book - fascinating document and carefully updated by it's one time owner - the classification of trains was interesting with total priority given to HMG's Governer being total and those conveyed solely "natives" the bottom of the hierarchy.Second Arm front usually!
I don't suppose many of you will have a clue what that means.
Many years ago when Royalty had to visit Sandringham, on the Royal Train before the last one, somebody had to travel on the train wearing leg irons ready to jump out and climb up the nearest telegraph pole if the train stopped for some unscheduled reason, clip a portable phone on the Control circuit and alert Control. You carried a pole rig book which told you where the Control circuit was on the pole route over the route you were travelling - which was very often well off your district so you had to get the information well in advance of the train running.
As a young trainee I was very surprised when I was told to be on the Train from Kings Lynn to London one relatively early morning, I was told later that it was because nobody else wanted to climb a telegraph pole wearing leg irons, it isn't easy!
I did several trips, but when the new train arrived it all stopped, radio had taken over.
So, to me, Control will always be second arm front!
They were Incident Controllers. Managed responses to events/incidents and logged faults failures, directing maintenance teams as required. TRCs worked with them to manage services around any problem and in general higher level regulatingInteresting, thanks. Looks like there was already a division between the Trent Valley+via Stoke lines and the rest that would eventually become a Route boundary.
I think I'm missing something, but if the previous four controllers (WCN, WCS, WM, Ch) are *not* the TRCs? Then who are they?
I'd be quite interested to know if anyone can share any examples of how geographies are divided up within a Route by NR Train Running Controllers, and within a company area by TOC Service Controllers (although these are sometimes also called TRCs??). Obviously, I'd imagine it has a lot to do with the intensity of service.
Ah I see, interesting the Incident Controllers have a smaller remit than TRCs, suggests something of how all these concepts are meant to function. I suppose an incident controller will have a lot of different people to talk to surrounding all the different parties involved in something, whereas maybe the TRCs are more primarily concerned with what trains are in the area and what they should do, meaning they're more likely focused on speaking to drivers and signallers. Is there a meaningful difference in seniority between incident controller and TRC?Th
They were Incident Controllers. Managed responses to events/incidents and logged faults failures, directing maintenance teams as required. TRCs worked with them to manage services around any problem and in general higher level regulating
Thanks so much for this, very much what I wanted. I might make a little graphic out of this at some later date. Is it normal practice across the railway to divide TRC along signalling lines? Seems sensible.Western Route
For NR Train Running Controllers, aligned with signalbox / workstation boundaries
Incident Controllers are the more senior role and 'take charge' more. NR controllers don't tend to have interactions with TOC staff directly - they deal primarily with signallers, MOMs etc.Ah I see, interesting the Incident Controllers have a smaller remit than TRCs, suggests something of how all these concepts are meant to function. I suppose an incident controller will have a lot of different people to talk to surrounding all the different parties involved in something, whereas maybe the TRCs are more primarily concerned with what trains are in the area and what they should do, meaning they're more likely focused on speaking to drivers and signallers. Is there a meaningful difference in seniority between incident controller and TRC?
TSM = Train service manager. Some TOCs group by area, others group by service group (e.g., Avanti have the Anglo Scots, West Mids and North West). All TOC controls are set up very differently in terms of the division of responsibilities.Thanks so much for this, very much what I wanted. I might make a little graphic out of this at some later date. Is it normal practice across the railway to divide TRC along signalling lines? Seems sensible.
I assume TSM means "Train Service Manager".
Interesting that the TOC controls still have a geographic split wherein a London-Penzance train will cross all the TOC internal boundaries as well as NR controller boundaries.
I remember the days in the 1980s before Western Region had a fault control. Bristol Panel had a supervisor for the four signallers on the operating floor that often appeared to make decisions. It was this supervisor that often called the (S&T) signalling fault team when they were needed (although sometimes one of the signallers would do this).Western Route
For NR Train Running Controllers, aligned with signalbox / workstation boundaries
NR TV0 TRC
(TVSC Paddington, Paddington Assist, Acton, Hayes, Heathrow and Slough)
NR TV1 TRC
(TVSC Twyford, Reading Station, Newbury; Westbury Panel)
NR TV2 TRC
(TVSC Reading W Jn, Didcot, Oxford, Swindon; Ascott-u-Wychwood SB, Evesham SB)
NR WC TRC
(TVSC Stoke Gifford, Bath, Bristol; Bristol Panel, Gloucester Panel, Exeter Panel, Exmouth Jn, Crediton, Paignton, Plymouth Panel, Liskeard SB, Mid Cornwall, St Blazey, Goonbarrow, St Erth and Penzance)
***
Crossrail West Duty Controller (Paddington to Reading for XR)
***
GWR TSM East - Paddington to Swindon, Paddington to Hereford, Paddington to Banbury, Paddington to Westbury
GWR TSM Wessex - Heathrow Express, Greenford, Windsor, Marlow, Henley branches, Reading to Gatwick, Reading to Basingstoke, Westbury to Portsmouth, Westbury to Weymouth, Westbury to Swindon
GWR TSM Central - Swindon to Gloucester, Bristol to Westbury, Bristol to Swindon, Bristol to Ashchurch, Bristol to S Wales, Bristol to Severn Beach, Bristol to Taunton
GWR TSM West - Westbury to Taunton, Taunton and every west of.
***
XC South Coast controller looks after XC services on the axis down from the route boundary south of Banbury, to Bournemouth
XC South West controller looks after XC services on the axis down from Worcestershire parkway to Plymouth and Cardiff
***
SWR Windsor Lines TSM looks after services into Reading via Ascot
SWR West TSM looks after diesel services to Reading (from Basingstoke), and through Westbury, Caste Cary; and into Exeter
***
There’s lots of variety with the freight operators; some have a single point of contact, some are split on geography, some are split on commodities.
XC South Coast controller looks after XC services on the axis down from the route boundary south of Banbury, to Bournemouth
XC South West controller looks after XC services on the axis down from Worcestershire parkway to Plymouth and Cardiff
If you are referring to the XC route controllers it is actually Five Ways to Penzance / Cardiff including Galton Jn via Hartlebury for the SW Controller and Proof House Jn to Bournemouth on the South Coast desk.Western Route
XC South Coast controller looks after XC services on the axis down from the route boundary south of Banbury, to Bournemouth
XC South West controller looks after XC services on the axis down from Worcestershire parkway to Plymouth and Cardiff