730227 has finally appeared. 2B00 05:31 Bletchley to Euston (04/08)
I jinxed it.
Well I suppose we cannot expect a brand new unit to work for more than one day.

I planned to visit Euston as I was in town today. But 730227 has done nothing today.
Last night it went to Northampton depot from Bletchley. This morning its first run to Euston plus its exit from the depot were cancelled.
Across midday it instead worked ECS to Bletchley CS.
No not very near Euston at all !.

Anyone know whats wrong with 730227 and how likely it is to give me something to do soon ?.
 

Liam L

Established Member
Joined
19 Jun 2020
Messages
1,415
Location
Birmingham
Does anyone know why the Gascoigne Wood Sidings moves are still taking place for 730/0s from Soho? Are the units being shuffled around for storage as they surplus to requirements with the cross city still running a 4tph service?
 

SCDR_WMR

Established Member
Joined
17 Dec 2017
Messages
2,610
Location
Crewe
Does anyone know why the Gascoigne Wood Sidings moves are still taking place for 730/0s from Soho? Are the units being shuffled around for storage as they surplus to requirements with the cross city still running a 4tph service?
Modifications
 

wythallpaul

Member
Joined
25 Feb 2024
Messages
125
Location
Bulkington
AFAIK 730201, 202 & 204 are still at Derby. Seems a long time since the last one (227) was delivered to BY.
Post No4077 suggests that 730227 moved to BY on 19th June 2026.
Post No4143 confirms it's entry into Service on 4th August 2026 - Around 45 Days Later.

if these Timescales are Replicated by 730201, 730202 & 730204 being Delivered to BY individually, it could (in theory) be that the last one of these 3 to enter Service could be in 2027.

Starting Tomorrow (21/08/2026) there are 133 days of 2026 left to go.

My 1st Ride on a Cl730/2 was 730234 on 21st July 2025 (13 Months ago).
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,573
Location
Croydon
Post No4077 suggests that 730227 moved to BY on 19th June 2026.
Post No4143 confirms it's entry into Service on 4th August 2026 - Around 45 Days Later.

if these Timescales are Replicated by 730201, 730202 & 730204 being Delivered to BY individually, it could (in theory) be that the last one of these 3 to enter Service could be in 2027.

Starting Tomorrow (21/08/2026) there are 133 days of 2026 left to go.

My 1st Ride on a Cl730/2 was 730234 on 21st July 2025 (13 Months ago).
I think 730227 was at Bletchley much earlier than 19 June 2026 as I thought I saw it (not 100% sure) in the sidings just North of Bletchley station on 24 February 2026. It then might have gone to Gascoigne Wood. I think the date 19 June 2026 might be when it returned from its visit to Gascoigne Wood !.
So it is even worse.
 

rogercov

Member
Joined
8 Feb 2019
Messages
272
Location
Coventry/London
I think 730227 was at Bletchley much earlier than 19 June 2026 as I thought I saw it (not 100% sure) in the sidings just North of Bletchley station on 24 February 2026. It then might have gone to Gascoigne Wood. I think the date 19 June 2026 might be when it returned from its visit to Gascoigne Wood !.
So it is even worse.
Are you sure it wasn't a few weeks before 24th February as I thought it went to Gascoigne Wood on the 16th.
According to my records (correct me if I'm wrong):
730227 was dragged from Old Dalby to Bletchley on 23rd December 2025 but never went into service.
Then on 16th February 2026 it was dragged to Gascoigne Wood.
Then on 19th June 2026 it was dragged back to Bletchley.
It entered service on 4th August 2026.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,573
Location
Croydon
Are you sure it wasn't a few weeks before 24th February as I thought it went to Gascoigne Wood on the 16th.
According to my records (correct me if I'm wrong):
730227 was dragged from Old Dalby to Bletchley on 23rd December 2025 but never went into service.
Then on 16th February 2026 it was dragged to Gascoigne Wood.
Then on 19th June 2026 it was dragged back to Bletchley.
It entered service on 4th August 2026.
You might well be correct. I know I thought I saw it (730227) while travelling South from a visit to Wolverton around February.
And yes it spent an age after first delivery before actually entering services - I had been waiting for it !.

Now 730206 is spending an age not in service after its initial use.

Question/speculation regarding 730201, 202 & 204.
Are they actually the ones originally built as 730/1s before the order was changed ?.
Reason I ask is I seem to recall some were numbered initially as 730/1s. Not necessarily in order but could the three above be adapted from 730101, 730102 and 730103 with 730203 being the first non-converted 730/2 ?.
Just a hunch and the first few of a class can often be the last in service anyway - but in this case a subclass.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,015
Location
West Wiltshire
Anyone know what the series of West Midlands tenders posted today are about eg

Class 730 Cascade Stabling​

Buyer: WM Trains

Description​

Requirement is for overnight train stabling for 7X 730 5-car units. Stabling to allow for refuelling and cleaning. Requirement to include cleaning and servicing


example 2

Description​

6X OLE monitoring systems for the class 730 fleets to be compatible with class 350 fleets, enabling early identification of OLE faults and allow for timely alerts to Network Rail, helping prevent infrastructure damage, reduce delays and cancellations, and improve safety
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,573
Location
Croydon
Also it says "730 Cascade Stabling" - Are we expecting 7 x 5car 730 units to get cascaded to somewhere ?
"Stabling to allow for refuelling and cleaning"

Refuelling?
Hmm. I noticed that - I wonder if it should be replenishing ?.

Overall I expect it is for out-stabling for services further up the WCML - perhaps Crewe or onwards to Manchester ?.
 

SCDR_WMR

Established Member
Joined
17 Dec 2017
Messages
2,610
Location
Crewe
Clearly interest at Bescot has been completely ended then. Was meant to be the home of 730s was it not?

Given the ongoing issues with tanking and availability of the 730/2s, this needs to be a WCML facility and online ASAP.
 

Omnishambles

Member
Joined
13 Jul 2019
Messages
204
Clearly interest at Bescot has been completely ended then. Was meant to be the home of 730s was it not?
Just what I was thinking, although the old school in me would have preferred to see Duddeston brought back into use. Probably totally impractical given the long dilapidated state, likely asbestos and more recently a stack of DU buildings that have been parked at what would be the exit area
 

boxerdog

Member
Joined
23 Apr 2016
Messages
80
Think that was necessary to accommodate the full /0 fleet in the West Mids, so presumably will still be required in the future when the Cross City goes back to a full service
Coventry is having further works for stabling more Class 730/0 units. This will free up space elsewhere to stable units. Northampton was being looked at for stabling more units, which would be the green ones.......
 

SCDR_WMR

Established Member
Joined
17 Dec 2017
Messages
2,610
Location
Crewe
Coventry is having further works for stabling more Class 730/0 units. This will free up space elsewhere to stable units. Northampton was being looked at for stabling more units, which would be the green ones.......
Stabling shouldn't be the priority though. Need places where they are maintained, cleaned and most importantly, tanked!

Northampton is purely stabling, if only units could be tanked there, it would improve unit availability. Crewe currently isn't classed as a maintenance depot, that is something which needs changing without delay.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
Stabling shouldn't be the priority though. Need places where they are maintained, cleaned and most importantly, tanked!

Northampton is purely stabling, if only units could be tanked there, it would improve unit availability. Crewe currently isn't classed as a maintenance depot, that is something which needs changing without delay.

Given how long it took to get the 730/2s into service and they have now been in service for 12 months, it's pretty poor that something as basic as emptying the toilet tanks is still an area of concern.
 

boxerdog

Member
Joined
23 Apr 2016
Messages
80
Stabling shouldn't be the priority though. Need places where they are maintained, cleaned and most importantly, tanked!

Northampton is purely stabling, if only units could be tanked there, it would improve unit availability. Crewe currently isn't classed as a maintenance depot, that is something which needs changing without delay.
Coventry works will include stabling/tanking and so will Northampton. Maintanance is carried out at Bletchley.
 

Jacob Porrett

Established Member
Joined
28 Jan 2022
Messages
1,929
Location
Telford
Stabling shouldn't be the priority though. Need places where they are maintained, cleaned and most importantly, tanked!

Northampton is purely stabling, if only units could be tanked there, it would improve unit availability. Crewe currently isn't classed as a maintenance depot, that is something which needs changing without delay.
Crewe is a maintenance depot. They do plenty of work there for a variety of trains.
 

InTheEastMids

Established Member
Joined
31 Jan 2016
Messages
1,382
Stabling shouldn't be the priority though. Need places where they are maintained, cleaned and most importantly, tanked!

Coventry works will include stabling/tanking and so will Northampton. Maintanance is carried out at Bletchley.

The scope of the works at each site is helpfully outlined on UK Gov Find a Tender service, which to summarise is a procurement of 3 lots
Lot 1 is Coventry: Up to 10 730/0, includes electrification and provision for cleaning and tanking/toilets
Lot 2 is Northampton: Includes tanking/cleaning at the two Riverside sidings (not the Siemens depot)
Lot 3 is works at Tyseley that are obviously unrelated to this thread.

 

Merle Haggard

Established Member
Joined
20 Oct 2019
Messages
3,850
Location
Northampton
The scope of the works at each site is helpfully outlined on UK Gov Find a Tender service, which to summarise is a procurement of 3 lots
Lot 1 is Coventry: Up to 10 730/0, includes electrification and provision for cleaning and tanking/toilets
Lot 2 is Northampton: Includes tanking/cleaning at the two Riverside sidings (not the Siemens depot)
Lot 3 is works at Tyseley that are obviously unrelated to this thread.

my bold

Those facilities already exist at the Siemens depot, but presumably taboo for units that aren't maintained by Siemens

Another expense to solve a problem created by the clever money saving idea of replacing 350/2 with 730/2.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,573
Location
Croydon
my bold

Those facilities already exist at the Siemens depot, but presumably taboo for units that aren't maintained by Siemens

Another expense to solve a problem created by the clever money saving idea of replacing 350/2 with 730/2.
I agree, all so fragmented.

BUT at least Siemens can/could bid for the operations at Northampton and if their bid is successful they could execute the tanking/cleaning at the existing Northampton depot. If it is a high enough value job then WMT will not have been allowed to give the work straight to Siemens. Only fair it goes out to tender for everyone to have a look at (and bid).

There might already be obvious answers but due process has to be gone through. It would not be so if it was all in house of course.
 