Progress with 345 071 - 345 080

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,559
Location
Croydon
I feel like they’re making them quite quickly, if they’re close to testing the second and third units out of 10, and this order is meant to be tiding them over until they start building the trains for HS2 as they said, if the HS2 trains don’t need to be in service for a decade from now. Their original request was for a minimum order of 5 units, and they got an order for 10. Will they have to go back to the Government begging for another emergency order to keep the factory open before then again? Perhaps the 3 more options for trains on the original Crossrail contract of 13 optional orders, which haven’t yet been ordered? There’s no guarantee that they’ll win the forthcoming Southeastern or ScotRail tenders which are the closest to being awarded from now, and they haven’t won any bi-mode tenders before now for the other possible tenders, which don’t have any news of being close to awarded yet (Northern, GWR, TransPennine Express, Chiltern, possibly TfW, maybe SWR).
My bold. That is quite a long time I agree BUT I really hope they start to build one or two HS2 trains soon and get them thoroughly tested before rushing into building the entire fleet with bugs baked in. Of course the risk there is the customer is unlikely to settle on a final design / formation any time soon !.

I assume the costs of lead up to production and awaiting money from the customer are borne by the banks (or loans from somewhere), As long as firm orders are there. So interim orders will be more for keeping staff on the payroll which, long term, reduces costs of training.

As for progress it does feel like, at this rate, summer 2027. That is because 345071 was sent from Derby on 14/07/2026 and 345072 sent on 17/08/2026, that is 33 days elapsed between the first two units. So for ten units we could assume 330 days which from 14/07/2026 is roughly mid June 2027. I am assuming no variation in progress that is more associated with a new design.

The following is a bit off topic except the purpose of the order for these 345s was to keep Derby going and also buy more of an existing design while still available from Derby.
Only two days ago I pondered if some more 710s are needed ?.
Something like 730s for Northern perhaps ?.
I think we can rule out any more 701s and 720s ?.
What are the latest ridership figures like for the Elizabeth line (Crossrail) ?.

Perhaps a new thread if folks are interested ?.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,941
Location
London
Heard some rumours that 345071 will come out in passenger service this evening or tomorrow morning.
 

tfw756rider

On Moderation
Joined
30 Nov 2024
Messages
1,935
Location
Wales (sometimes in England), thanks for replying!

bluegoblin7

Established Member
Joined
10 May 2011
Messages
2,109
Location
JB
…and duly red penned! Still got that new train smell. It’s remarkable to compare to the original 70 - you don’t notice slow wear and tear.
 

Attachments

  • IMG_1146.jpeg
    4.7 MB · Views: 120
  • IMG_1148.jpeg
    3.1 MB · Views: 85
  • IMG_1140.jpeg
    6 MB · Views: 80
  • IMG_1157.jpeg
    5.6 MB · Views: 52
  • IMG_1165.jpeg
    4.4 MB · Views: 57
  • IMG_1167.jpeg
    IMG_1167.jpeg
    2.4 MB · Views: 59

RUK

Member
Joined
5 Aug 2009
Messages
400
Location
East of England
Gosh, the first one is in service already! They’re being built for Old Oak Common services - when will Old Oak Common come into use? All of the trains will be finished years before then, I think?
 

Benjwri

Established Member
Joined
16 Jan 2022
Messages
3,260
Location
Bath
They’re being built for Old Oak Common services - when will Old Oak Common come into use? All of the trains will be finished years before then, I think?
They're also needed to reduce strain on the current fleet, so they can progressively be sent for maintenance overhauls at Derby, and then should hopefully allow for some frequency increases before OOC opens.
 

RUK

Member
Joined
5 Aug 2009
Messages
400
Location
East of England
They're also needed to reduce strain on the current fleet, so they can progressively be sent for maintenance overhauls at Derby, and then should hopefully allow for some frequency increases before OOC opens.
Will that slack-in-the-fleet-enabled over-haul include installing charging points, being 3-pin-plug sockets and/or USB ports, etc.?
 

Benjwri

Established Member
Joined
16 Jan 2022
Messages
3,260
Location
Bath
Will that slack-in-the-fleet-enabled over-haul include installing charging points, being 3-pin-plug sockets and/or USB ports, etc.?
The majority of the 345s have had usb ports retrofitted by the carriage join and at the seating bays. 345071 has been delivered with this installed already.
 