1970-1974 WCML Weaver Jct -Glasgow electrification

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,453
Location
Preston Lancs
I thought I would start a thread on this topic because I would like to see if there are still people around that remember it. I am attaching a photograph of the wiring train doing its stuff 3.9 miles north of Preston at the now removed crossover that then continued onto the Barton and Broughton loop. It is a scanned colour slide so I appologize for the quality.
 

Attachments

  • Crossover wiring train 3.JPG
    3.3 MB · Views: 169
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Beebman

Member
Joined
17 Feb 2011
Messages
962
Location
Twyford
There's a very good BTF film about the project called 'Wires Over The Border' (which I remember being shown at the time on BBC2) that thanks to the Bennett Brook Railway channel is available for viewing:


This vintage railway film, produced by British Transport Films in 1974, is an account, in human and non-technical terms, of the electrification of the West Coast main line railway from Crewe to Glasgow; the logical completion of the Liverpool-Manchester-London electrification of 1966.

It covers not just the electrification work but also resignalling, track renewals and the construction (including driver training) of the 87s.
 

jfollows

Established Member
Joined
26 Feb 2011
Messages
10,076
Location
Wilmslow
Family canal boat holiday on the Lancaster canal, probably summer 1973, observed wiring work at, I think, Garstang.
 

Lloyds siding

Member
Joined
3 Feb 2020
Messages
621
Location
Merseyside
Yes, saw quite a bit of this going on in my first year at Lancaster uni (1973-74). A friend's uncle made the copper for the overhead wire at BICC, Prescot....when I say made it: he mixed the exact alloy mix which was then melted to make the wire. Another friend's dad was chief engineer and designer of the BCR electrolytic refinery on the BICC site, making the very pure copper used for the wire.
 
Last edited:

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,218
There seemed different approaches between the LMR and the Scottish Region for how the works were done, each presumably planned their own work. In those times the WCML was far busier overnight than in the day (seems strange now), with sleepers, mail, newspapers, much of the freight, etc, and the ScR closed north of Carlisle for several years from 0600 to 1800 each day to allow daytime works. I have to say I was a regular along the parallel A74 road during this time (in significant part because of the closure) and never saw a single works train there, but whatever. Passenger services to Glasgow were diverted via the G&SW through Dumfries.

Edinburgh was notably left out on a limb. The Waverley route had closed only shortly before the electrification was announced, I have wondered if it had hung on a bit it would never have closed while being a diversion route, and by the time the electrification was complete attitudes might well have changed, if only north of Hawick. There was a Birmingham to Edinburgh daytime service, which north of Carlisle was run via the G&SW, reverse at Glasgow Central, and then via Shotts to Edinburgh. It would have been quicker from Carlisle to go via Newcastle.

In England much of the freight was diverted via the Settle & Carlisle, which had a notable boost for a few years until works were complete.
 

Sir Felix Pole

Established Member
Joined
21 Oct 2012
Messages
2,151
Location
Wilmslow
There seemed different approaches between the LMR and the Scottish Region for how the works were done, each presumably planned their own work. In those times the WCML was far busier overnight than in the day (seems strange now), with sleepers, mail, newspapers, much of the freight, etc, and the ScR closed north of Carlisle for several years from 0600 to 1800 each day to allow daytime works. I have to say I was a regular along the parallel A74 road during this time (in significant part because of the closure) and never saw a single works train there, but whatever. Passenger services to Glasgow were diverted via the G&SW through Dumfries.

Edinburgh was notably left out on a limb. The Waverley route had closed only shortly before the electrification was announced, I have wondered if it had hung on a bit it would never have closed while being a diversion route, and by the time the electrification was complete attitudes might well have changed, if only north of Hawick. There was a Birmingham to Edinburgh daytime service, which north of Carlisle was run via the G&SW, reverse at Glasgow Central, and then via Shotts to Edinburgh. It would have been quicker from Carlisle to go via Newcastle.

In England much of the freight was diverted via the Settle & Carlisle, which had a notable boost for a few years until works were complete.
BR got the business case for Weaver / Glasgow electrification past the Minister on the basis that the Settle & Carlisle could be closed - fortunately that never came to pass. Electrification of connecting lines to Manchester, Liverpool, Blackpool and Morecambe had to be dropped though - happily now resolved except for the last. O. S. Nock was pretty grumpy in his column about the proposed timings for the 'Royal Scot' et al - 'barely competitive' as I recall.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,453
Location
Preston Lancs
Yes, saw quite a bit of this going on in my first year at Lancaster uni (1973-74). A friend's uncle made the copper for the overhead wire at BICC, Prescot....when I say made it: he mixed the exact alloy mix which was then melted to make the wire. Another friend's dad was chief engineer and designer of the BCR electrolytic refinery on the BICC site, making the very pure copper used for the wire.
It was actually alloyed with a trace of Cadmium.
 

70014IronDuke

Established Member
Joined
13 Jun 2015
Messages
4,067
There seemed different approaches between the LMR and the Scottish Region for how the works were done, each presumably planned their own work. In those times the WCML was far busier overnight than in the day (seems strange now), with sleepers, mail, newspapers, much of the freight, etc, and the ScR closed north of Carlisle for several years from 0600 to 1800 each day to allow daytime works. I have to say I was a regular along the parallel A74 road during this time (in significant part because of the closure) and never saw a single works train there, but whatever. Passenger services to Glasgow were diverted via the G&SW through Dumfries.
2 x Cl 50s over the Glasgow and South Western must have produced timings never, ever seen before. Pity I never took the chance to do that at the time.

Edinburgh was notably left out on a limb. The Waverley route had closed only shortly before the electrification was announced, I have wondered if it had hung on a bit it would never have closed while being a diversion route, and by the time the electrification was complete attitudes might well have changed, if only north of Hawick.
That's an interesting thought. I wonder if they even thought of re-opening it? Or perhaps, that was one reason for closing it ASAP when they did?
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,218
BR got the business case for Weaver / Glasgow electrification past the Minister on the basis that the Settle & Carlisle could be closed - fortunately that never came to pass. Electrification of connecting lines to Manchester, Liverpool, Blackpool and Morecambe had to be dropped though
I wonder if the wired loop through Earlestown was a hangover from links to Liverpool and Manchester. That never seemed to be meaningfully used for electric traction.
 

Beebman

Member
Joined
17 Feb 2011
Messages
962
Location
Twyford
I wonder if the wired loop through Earlestown was a hangover from links to Liverpool and Manchester. That never seemed to be meaningfully used for electric traction.
I believe it acted as the relief lines for the 2-track section between Winwick Jct and Golborne Jct so in theory freight should have gone that way on a regular basis.
 

52290

Member
Joined
23 Oct 2015
Messages
726
I wonder if the wired loop through Earlestown was a hangover from links to Liverpool and Manchester. That never seemed to be meaningfully used for electric traction.
Once when traveling from Preston to London my electrically hauled train was diverted via Earlestown to Warrington due to engineering works, in the 1980's I think.
 

Solweytracker

Member
Joined
10 Oct 2020
Messages
48
Location
UK
...the ScR closed north of Carlisle for several years from 0600 to 1800 each day to allow daytime works. I have to say I was a regular along the parallel A74 road during this time (in significant part because of the closure) and never saw a single works train there, but whatever.
The electrification teams definitely used works trains during the day on the Gretna to Glasgow WCML section, including to drill the holes for the mast foundations, where suitable, and another train had facilities to mix and pour the concrete for the foundations. I worked on the latter for a short while during a uni. vacation ca 1971. These would have been operated from Carstairs and/or Beattock to the border, I cannot remember which; I think with EE Type 1s as traction. I remember they had a staff 'comforts coach' with a cooking area, where a partly incapacitated gentleman was paid by some of the others to prepare meals for them. There would also have been wiring trains, obviously.
 

jfollows

Established Member
Joined
26 Feb 2011
Messages
10,076
Location
Wilmslow
2 x Cl 50s over the Glasgow and South Western must have produced timings never, ever seen before. Pity I never took the chance to do that at the time.
2h26 Crewe-Carlisle non-stop D455 1S57 10:05 Euston-Glasgow
2h30m Carlisle-Crewe with a stop at Preston 1M30 11:20 Glasgow-Euston (1h53m Glasgow-Carlisle)
From 1971-72 working timetable
Oh but maybe not G&SW; https://www.railforums.co.uk/threads/article-on-wcml-electrification.267668/post-6769728 has more information.
 
Last edited:

Oxfordblues

Member
Joined
22 Dec 2013
Messages
1,114
I started as a railman* at Preston station on 22 July 1974 and dealt with the first summer of electric trains which were quite a novelty. There was a lot of engine-changing and portion-working: Euston-Blackpool, Liverpool/Manchester-Glasgow/Edinburgh, etc.

* There were no "railwomen"!
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,453
Location
Preston Lancs
I started as a railman* at Preston station on 22 July 1974 and dealt with the first summer of electric trains which were quite a novelty. There was a lot of engine-changing and portion-working: Euston-Blackpool, Liverpool/Manchester-Glasgow/Edinburgh, etc.

* There were no "railwomen"!
Shunter to contact 20 - was a frequent Preston Station announcement in those days.
 

Polarbear

Established Member
Joined
24 May 2008
Messages
1,894
Location
Birkenhead
I recall the many diverted trains coming through Chester station in the 1971-1973 period. Didn’t know why they stopped in 1973 at the time, but I understand the Weaver Junction-Preston section was energised at some point in 1973, with electric working as far as Preston for a short time?
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,218
I was working in Glasgow in May 1974 and just chanced to have gone into the centre on the first day, so went to Central station and saw the first London train in at 1245, spot on time. Very small reception, a few rail management, one with a camera, couple of porters, passengers all came off, that was it. I'd arrived there a couple of weeks previously, everything still seemed diesel, it was a notable quick and quiet transition. The key Euston trains each way were morning 0745-1245, and evening 1745-2245, just 5 hours each way, and day return tickets were offered from both ends with quite a number taking advantage.

I believe Weaver to Preston was energised for May 1973, it was north of there that changed over in May 1974.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,453
Location
Preston Lancs
------- but I understand the Weaver Junction-Preston section was energised at some point in 1973, with electric working as far as Preston for a short time?
Correct. Electric change over to diesel at Preston in that time period. (I cleared my electrics for sight because of this). The 87s introduced just after were very easy and i saw them being built in Crewe Works anyway.
 

Beebman

Member
Joined
17 Feb 2011
Messages
962
Location
Twyford
The key Euston trains each way were morning 0745-1245, and evening 1745-2245, just 5 hours each way, and day return tickets were offered from both ends with quite a number taking advantage.
My Dad took advantage of the tickets which I'm sure were £5 day return and we went on a family trip from Euston to Glasgow and back. The outward trip was hauled by 87001. It was my first ever visit to Glasgow and we did a circuit of the subway which still had its original cars and I remember getting a glimpse of the depot crane hoist. The only other thing of railway interest I remember seeing was the two class 20 bankers at Beattock Summit, one of which was still in green livery.
 

Crisso

Member
Joined
26 Jul 2012
Messages
45
Memory permitting, I recollect taking the down Royal Scot on a Friday in September 1972, departing from London Euston at 10.05 hours, consisting of Mk2a/Mk1 stock hauled by an electric Class 86 Loco. It was a very fast non stop run to Basford Hall but, we then stopped there for several minutes, before entering Crewe for a protracted Engine change to a single Class 50 Diesel. A fast onward journey to just past Weaver Junction then, we encountered several pws slowings/track occupations, passing at least two works trains on adjacent tracks, boldly emblazoned on the vehicle sides on large yellow panels in black type - EUSTON TO GLASGOW ELECTRIFICATION. Beyond Preston via Shap to Carlisle, progress was faster but not spectacular, due to only one Diesel Loco allocated. North of Carlisle, we took the G&SW Route via Kilmarnock and, eventually arrived at Glasgow Central around 40-45 minutes late.

Since it was just a long weekend away with my then girlfriend, the return journey on the Sunday departing at midday took 9 hours to Euston! Albeit, an interesting one, again via the G&SW to Carlisle then, over the Settle Route on via Blackburn and Bolton, where eventually on the outskirts of Manchester, we switched to Electric traction for the remainder.
 

308165

Member
Joined
11 Feb 2017
Messages
98
The diversions via the S&C produced some oddities in the 1973/73 WTT, including:

1. Certain Saturday night services making a call at Garsdale (two years after it closed). I think to unload newspapers (which must have been moved by road to Oxenholme)
2. The operation of a daily Euston - Carlisle parcels via Lancaster, Carnforth, Hellifield (reverse) and Settle. I'm guessing this was route learning/retention.
 

Falcon1200

Established Member
Joined
14 Jun 2021
Messages
6,496
Location
Neilston, East Renfrewshire
There was a Birmingham to Edinburgh daytime service, which north of Carlisle was run via the G&SW, reverse at Glasgow Central, and then via Shotts to Edinburgh. It would have been quicker from Carlisle to go via Newcastle.

Were there that many WCML/Edinburgh services back then, that would have justified retaining the Waverley route for them?

2 x Cl 50s over the Glasgow and South Western must have produced timings never, ever seen before.

One of my Scotland Control colleagues was given (long before my time of course) the task of travelling on the 2 x Class 50 services to assess their performance! This was IIRC when they ran via the WCML however, rather than the G&SW.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,282
Location
Glasgow
Were there that many WCML/Edinburgh services back then, that would have justified retaining the Waverley route for them?
Pre-electrification, there was one Birmingham to Glasgow & Edinburgh day train and two Manchester/Liverpool to Glasgow/Edinburgh. Plus some additionals in the summer.

Electrification quadrupled the Birmingham and doubled the Manchester/Liverpool services, each to 4 per day with one Birmingham starting back/running through to Bristol.
 