Does that look as if it is right over a culvert?Image from BBC said to be 1 hour before the incident. That would explain the previous train that went over this with a big jolt. (Image source: RAIB)
![]()
Does that look as if it is right over a culvert?Image from BBC said to be 1 hour before the incident. That would explain the previous train that went over this with a big jolt. (Image source: RAIB)
![]()
A quick flick through RTT suggests no freight has run to/from Newhaven since the derailment.Have the Newhaven aggregates trains been cancelled or have the gas the excitement of a reverse at Brighton?
But was the identification of the issues prompted by the derailment?
Interesting that they haven't used the camera footage from 1F34 yet nor explicitly said the driver of 1F34 braked due sighting the track defect. The rear facing camera picture is from a preceding train (1F28) and there were two more trains that followed this before 1F34. Im pretty sure all trains have forward facing cameras these days although quality maybe variable on older electrostars so either they didnt or they didnt want to show them. They actually provided more information on Elstow in my view.The RAIB have published an update establishing some basic information about what happened and outlining their lines of enquiry:
I've not included it in the above quote but there is an image of the track irregularity from the rear CCTV of a train prior to the incident train which does show quite a kink in the line.
![]()
Derailment of a passenger train at Lewes
Investigation into the derailment of a passenger train at Lewes, East Sussex, 13 August 2026.www.gov.uk
It does to me, though perhaps less than the down line.Is it me or does the up line also look distorted?
2 circuits (1 DB to Marine and 1 GBRf to Town Yard) ran on the 13th, and both have an inbound and corresponding return on RTT, suggesting no trains were trapped.Drat. Understandable but still drat.
To me it looks like the transition from underbridge back to embankment (in the direction of travel)Does that look as if it is right over a culvert?
It managed to lose nearly two and a half hours en route, too.
Inbound for collection…
It was berthed at Copyhold Junction a driver told me, close to an access gate2 circuits (1 DB to Marine and 1 GBRf to Town Yard) ran on the 13th, and both have an inbound and corresponding return on RTT, suggesting no trains were trapped.
When the derailment happened, 6O46 Hanwell Bridge Loop - Newhaven Day Aggregates (FLHH) was en-route and it last reported at Haywards Heath. It's not obvious from RTT where it then went, but other trains used platform 1 less than an hour after it arrived so presumably it either shunted to the sidings or was run to an alternative destination sharpish.
Thanks, makes sense.It was berthed at Copyhold Junction a driver told me, close to an access gate
It's the one in the bottom left image on this page, I think:That is over underbridge 674, it has a path connecting Landport Road to another path that follows the course of the Ouse.
It's also what connects the main working compound to the actual derailment site which are on opposite sides of the railway formation in this location.
123walks.org
A defect was found on railway tracks in East Sussex at the site where a train derailed leaving 30 injured, a report says.
Initial findings from the Rail Accident Investigation Branch (RAIB) found an "irregularity" with the tracks near Lewes where three carriages tumbled down an embankment last Thursday.
The RAIB, which is continuing to investigate the derailment, said it had received "several reports of rough riding at the location of the derailment from passengers on other trains".
Network Rail and Greater Thameslink Railway, whose Southern Rail train was involved in the crash, said in a joint statement they were "sorry this happened on our railway".
Investigators from the RAIB have said CCTV from a train which passed through the crash site at 14:04 BST showed the "irregularity" with the track geometry just before the point where the train came off the tracks.

Is it me or does the up line also look distorted?
Out the front or back would probably be my first thought, if your carriage is separated a gangway corridor would be open.Out of curiosity, I've never considered this before, but how DO you self-evacuate from a carriage which is on its side ?
It's the one in the bottom left image on this page, I think:
![]()
Lewes – The Pells & The Ouse 2.6m
The Pells is a beautiful L-shaped channel of water teeming with ducks and surrounded by elegant trees. This walk follows the Sussex Ouse Way along the riverbank, cuts under the railway and returns …123walks.org
I've walked under it a few times.
Very interesting, turns out to be Newhaven Marine after all.Interesting manoeuvres tonight…
Is it possible the distortion couid be due to a bridge strike?That is over underbridge 674, it has a path connecting Landport Road to another path that follows the course of the Ouse.
It's also what connects the main working compound to the actual derailment site which are on opposite sides of the railway formation in this location.
I think both locos haul it to newhaven marine, then one runs arround to haul to Brighton the other detaches to follow behind to Brighton.Very interesting, turns out to be Newhaven Marine after all.
Best as I can work out:
- ECS runs to Newhaven (5Z55)
- Light loco follows from Lewes to attach on London End at Newhaven (0Z55), Country end loco Detaches. Presumably the front loco from the 2 that have performed the rescue will shunt clear but not clear how!
- ECS moves to Brighton, detaches loco on blocks. loco detached at Newhaven runs light from Newhaven to attach on (now) London End to haul it to Selhurst (0Z56
- Loco on blocks follows light to Haywards heath (0Z57), not clear what the next onward movement would be.
seems like a lot of moves, you not top and tail the 47's from Newhaven.Very interesting, turns out to be Newhaven Marine after all.
Best as I can work out:
- ECS runs to Newhaven (5Z55)
- Light loco follows from Lewes to attach on London End at Newhaven (0Z55), Country end loco Detaches. Presumably the front loco from the 2 that have performed the rescue will shunt clear but not clear how!
- ECS moves to Brighton, detaches loco on blocks. loco detached at Newhaven runs light from Newhaven to attach on (now) London End to haul it to Selhurst (0Z56
- Loco on blocks follows light to Haywards heath (0Z57), not clear what the next onward movement would be.
It does seem odd, but that's what seems to be in the plan:seems like a lot of moves, you not top and tail the 47's from Newhaven.
The air brake being unavailable would make a lot of sense as the ECS is also timed with a lot of pathing/engineering in it.I guess they can haul a unit using the emergency coupler between locomotive and unit, but can't haul a locomotive on the back using an emergency coupler between the unit and locomotive, or can't get the air brake through to the second locomotive.
Difficult to tell but could the appearance of distortion on the up line be due to the effects of heat haze, it being hot and sunny at the time?
Doesn’t every unit carry a ladder for this purpose? Some definitely have it visible to the public, am assuming others do but in a cupboard somewhere.Out the front or back would probably be my first thought, if your carriage is separated a gangway corridor would be open.
or yes climbing out the top is an option (you could use the emergency door open rather than breaking a window), but obviously climbing requires strength plenty would not have.