Looking at it is seems to have minimum time at Halifax, Bradford and Leeds and 15 mins at Hull on a 4 hour cycle.Why is this route so unreliable?
Seems a shame to reduce the variety of destinations on offer to Halifax, Bradford and Hull.
Looking at it is seems to have minimum time at Halifax, Bradford and Leeds and 15 mins at Hull on a 4 hour cycle.Why is this route so unreliable?
Seems a shame to reduce the variety of destinations on offer to Halifax, Bradford and Hull.
Ah I see, quite congested then really. Is there enough space at Leeds to hold an empty train for 30 minutes? Although it maybe OK as I seem to remember there are 2 east facing bay platforms, or at least there was before the rebuild in 2000. Is that still the caseAll the problems with it are fitting around Micklefield Jn with TPE.
Heading west, if the 1Pxx Scarborough - Victoria service is a few mins late, the Hull to Halifax service gets held for it. This means it arrives at Halifax late and has minimum turn around time, so often leaves late
Heading east, if the 9Exx TPE is a few min late at Leeds, the Halifax - Hull is held for it. This in turn delays the 1Sxx Cross Country behind it, and sometimes the 1Pxx TPE to Teeside as well. If the 2Kxx ends up more than 5 late as a result, chances are it gets put behind the Doncaster to Hull all stops service, which then means getting to Hull after it is due to leave back to Halifax.
Cutting at Leeds basically gives 30 min recovery time there and also means that delays aren’t imported to the clockface 15 min Leeds - Halifax service
Yes, there are still two bay platforms, of which platform 7 is used for the local York services, but platform 14 is empty except for a couple of trains at peak times, so they'll presumably use thatAh I see, quite congested then really. Is there enough space at Leeds to hold an empty train for 30 minutes? Although it maybe OK as I seem to remember there are 2 east facing bay platforms, or at least there was before the rebuild in 2000. Is that still the case
Always thought extending the Newcastle to Edinburgh TPE services to Glasgow would make sense. There is a quite a big flow from Motherwell to Edinburgh.Whilst I appreciate pax from Glasgow/Motherwell may well benefit from direct trains towards the XC network, I think it would be better use of their 220/221s to only run as far north as Edinburgh and potentially be able to double up another service or two.
Considering that the Scottish crew are all Glasgow based and currently have to either pass through on Scotrail services or use taxis before/after service, it makes even more sense.Always thought extending the Newcastle to Edinburgh TPE services to Glasgow would make sense. There is a quite a big flow from Motherwell to Edinburgh.
It will also help with timekeeping on the Chester to Leeds service which if running 7 or so minutes late through the Calder Valley can often be stuffed outside Halifax if the Hull unit is let out of the turnback siding early . My record is waiting 8 minutes outside Halifax waiting for the platform to become free . The Halifax to Hull service is timed through the eye of a needle , particularly Leeds to Micklefield and from Gilberdyke with little wiggle room at the bookends of the route . Running Leeds / Hull is a much better idea and should improve reliability .Looking at it is seems to have minimum time at Halifax, Bradford and Leeds and 15 mins at Hull on a 4 hour cycle.
No it isn’t a good idea. It is a disgraceful idea.It will also help with timekeeping on the Chester to Leeds service which if running 7 or so minutes late through the Calder Valley can often be stuffed outside Halifax if the Hull unit is let out of the turnback siding early . My record is waiting 8 minutes outside Halifax waiting for the platform to become free . The Halifax to Hull service is timed through the eye of a needle , particularly Leeds to Micklefield and from Gilberdyke with little wiggle room at the bookends of the route . Running Leeds / Hull is a much better idea and should improve reliability .
This kicks in at the beginning of October 2026, is scheduled to finish on Sunday 3 January 2027, and is, indeed, due to the Dolphin Junction replacement.Looks like the GWR London to Didcot Parkway services will cross over from the main lines after Slough from December which means they will stop at Platform 2. Is this possibly due to the upcoming Dolphin Junction works?
To clarify, this is because dolphin junction will be out of action for those 3 months. Once this is done, the speed of trains over the junction will increase massively which will cause fewer delays in the future.This kicks in at the beginning of October 2026, is scheduled to finish on Sunday 3 January 2027, and is, indeed, due to the Dolphin Junction replacement.
Annoyingly, it causes lots of Class 1s to be retimed by up to 3 minutes too, (as you will see if you look in the current GWR timetable PDFs), owing to them needing to be flexed around the Class 2s that will stay on the Main lines for a bit longer.
Platforms 2 & 3 at Slough will be used for some of the Paddington - Didcot stoppers to call there, as they will need to cross between Main lines and Relief lines at either Slough West or Maidenhead East. Those platforms are currently gated off and only a tiny number of Class 1s actually call at Slough these days.
Always thought extending the Newcastle to Edinburgh TPE services to Glasgow would make sense. There is a quite a big flow from Motherwell to Edinburgh.
It’s good that they are adding more trains. TBH a morning peak service from Clacton should only really be stopping at those stations after Colchester, anything else is doing the job of a different service.There don’t seem to be many changes in GA land except one extra peak service in each direction on the GEML. A new 07:09 SX Colchester to Liverpool Street which results in some consequential changes to other services, the most noticeable is the 06:48 SX Clacton to Liverpool Street which is retimed to depart at 06:55 and only calls at Chelmsford and Stratford south of Colchester, presumably to provide relief to the 06:30 from Norwich. In the evening a new 16:51 SX Liverpool Street to Colchester filling the gap between the 16:42 and 17:02 departures, though even with this being overtaken at Witham by the 17:00 Norwich it still will provide a connection at Colchester into the 17:56 to Walton (currently provided by the 16:42 ex Liv St). This extra morning service makes a total of 20 Main and Southend arrivals in to Liverpool Street in the high peak hour (08:00-08:59) which is only 1 less than pre COVID.
Good to hear and just goes to show that even with the additional seating capacity on the new train fleets that at least 3 days (with Monday picking up no end too) the GEML has recovered very well. There is still some distain that the 06:55 ex-Norwich which was fast from Manningtree never returned.There don’t seem to be many changes in GA land except one extra peak service in each direction on the GEML. A new 07:09 SX Colchester to Liverpool Street which results in some consequential changes to other services, the most noticeable is the 06:48 SX Clacton to Liverpool Street which is retimed to depart at 06:55 and only calls at Chelmsford and Stratford south of Colchester, presumably to provide relief to the 06:30 from Norwich. In the evening a new 16:51 SX Liverpool Street to Colchester filling the gap between the 16:42 and 17:02 departures, though even with this being overtaken at Witham by the 17:00 Norwich it still will provide a connection at Colchester into the 17:56 to Walton (currently provided by the 16:42 ex Liv St). This extra morning service makes a total of 20 Main and Southend arrivals in to Liverpool Street in the high peak hour (08:00-08:59) which is only 1 less than pre COVID.
There are a number of people out there who’d be all too happy to tell you so please don’t ask themI don't know where all these people come from to be honest.
Just an anecdotal observation regarding the upcoming changes to the Luton to Rainham service - when I used this service to travel through the core the other day (weekday off-peak), I was quite surprised to see that the service was absolutely rammed full when it arrived at St Pancras, and was again rammed full when it was leaving London Bridge.
There weren't any cancellations, I even double checked that on RTT before posting as it wouldn't make sense for me to post such an observation if the service was carrying multiple trainloads of passengers.if the preceding fast service from Bedford was cancelled?? … then everyone from Luton to St Albans would be on this as the next service south.
Comeback for Varamis I wonder , Maybe with 325s ?Curiously Varamis seemed to have added more WCML paths. Appear to be old DBC postal paths to Warrington or Daventry.