As reported by chime whistle on X this afternoon. The government has agreed to lend all 37 350/2 units to northern they will undergo a £25 Million refresh and begin to enter service in 2027 replacing the 323s
 

Attachments

  • image_2026-07-10_164235803.png
    image_2026-07-10_164235803.png
    292.7 KB · Views: 569
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

ewanh723

Member
Joined
24 May 2023
Messages
18
Location
Manchester
chime had access to in internal email to northern staff about it so id say pretty reliable. all down to not being able to get spare parts from the 323s
 

TheWalrus

Established Member
Joined
6 Oct 2008
Messages
2,069
Location
UK
Will some 323s remain in service and some be used as spares donors? Would be a shame to see them go to waste. Maybe wishful thinking but would be good if they fitted batteries to 350s to enable them to work lines which spend a lot of time under wires like Barrow/Windermere-Manchester for example.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,305
Location
Somerset
Will some 323s remain in service and some be used as spares donors? Would be a shame to see them go to waste. Maybe wishful thinking but would be good if they fitted batteries to 350s to enable them to work lines which spend a lot of time under wires like Barrow/Windermere-Manchester for example.
As they apparently hope to get 4 or 5 into service by the end of next year, some of the 323s will be around for a while yet.
 

py_megapixel

Established Member
Joined
5 Nov 2018
Messages
7,434
Location
Northern England
Probably a positive announcement suggestion overall, but is it not a downgrade in capacity if there are 37 350s for only 43 323s? I suspect we might see some double 323 diagrams downgraded to single 350s.

Edit: removed 'announcement' as it's just a random Twitter post and hasn't been formally announced yet
 

A60stock

Member
Joined
26 Aug 2019
Messages
229
Location
London
This is very interesting news.

Are the 323s considered life expired?

Are there enough 350s to replace the entire 323s? (3 vs 4 car units - or remove a car to have a like for like 6 car double)

Can a 350 reliably do the same work as what is effectively a metro service? (thinking acceleration, door dwell times, which are slow on those desiros)

I guess this means the 323s are destined for the scrapyard!
 
Last edited:

37069

Member
Joined
11 Jun 2025
Messages
236
Location
Cumbria
Probably a positive announcement suggestion overall, but is it not a downgrade in capacity if there are 37 350s for only 43 323s? I suspect we might see some double 323 diagrams downgraded to single 350s.

Edit: removed 'announcement' as it's just a random Twitter post and hasn't been formally announced yet
I believe Northern only operates 34 of the 323s, so this would be three additional units overall.
 

Clarence Yard

Established Member
Joined
18 Dec 2014
Messages
3,262
How reliable is this source?

The gen is accurate. It has been a fairly open secret in the industry that the DfT have been wanting to place the 350/2 with Northern and that is where they were heading. Northern declared their hand at industry timetable meetings quite a while ago.

The deal has taken ages to get through Government, not helped by the split of the DfT (some to DfTO) which is further affecting DfT decisions on rolling stock matters.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,778
Location
Somewhere, not in London
Also not helped by the indecision on what to actually do with the 350/2s before going to Northern.

Will be interesting to see what actually does happen before they find their new home.
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,708
Location
West of Andover
And it will be interesting to see if they get will reseated during the refurbishment or will they stay 3+2 with USB sockets added (and new seat covers & carpets etc)
 

Alder

Member
Joined
11 Sep 2024
Messages
13
Location
Kent
And it will be interesting to see if they get will reseated during the refurbishment or will they stay 3+2 with USB sockets added (and new seat covers & carpets etc)
It would look good with the seat type they're using with the 360 refurbishment, but that could be asking for too much!
 

Liam L

Established Member
Joined
19 Jun 2020
Messages
1,414
Location
Birmingham
Probably a positive announcement suggestion overall, but is it not a downgrade in capacity if there are 37 350s for only 43 323s? I suspect we might see some double 323 diagrams downgraded to single 350s.

Edit: removed 'announcement' as it's just a random Twitter post and hasn't been formally announced yet
Northern only have 34 323s.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,143
Location
Bolton
Can a 350 reliably do the same work as what is effectively a metro service? (thinking acceleration, door dwell times, which are slow on those desiros)
I would think more along the lines of where non-standard four car 20m units can physically be used before worrying about things like that. Especially when it comes to stabling, platform occupancy and sharing rules, and depot space.

No doubt the rosco will be on the hook for some rather pricey signalling alterations. Some for where the trains physically won't fit, some for where the track and platforms need to be moved, and some for where the signal can be viewed adequately from a 323 cab but not a 350 one.
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,112
How reliable is this source?
It's being reported by Modern Railways.

== Doublepost prevention - post automatically merged: ==

And it will be interesting to see if they get will reseated during the refurbishment or will they stay 3+2 with USB sockets added (and new seat covers & carpets etc)
Hopefully new seat cushions, not just covers!
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
As reported by chime whistle on X this afternoon. The government has agreed to lend all 37 350/2 units to northern they will undergo a £25 Million refresh and begin to enter service in 2027 replacing the 323s
Don’t you mean the government has agreed for Northern to lease them? They are not the governments property to lend to anyone...
 

Liam L

Established Member
Joined
19 Jun 2020
Messages
1,414
Location
Birmingham
Don’t you mean the government has agreed for Northern to lease them? They are not the governments property to lend to anyone...
Not how it works, Northern went to government with a business case to lease the units from Poterbrook, Now government have agreed.
 

py_megapixel

Established Member
Joined
5 Nov 2018
Messages
7,434
Location
Northern England
And it will be interesting to see if they get will reseated during the refurbishment or will they stay 3+2 with USB sockets added (and new seat covers & carpets etc)
It would look good with the seat type they're using with the 360 refurbishment, but that could be asking for too much!
They didn't even replace the ancient seats in the Sprinters so I don't think replacing the relatively modern seats in the 350s is particularly likely.

The £25m figure given is actually a bit less than than the £27.6m given for the EMR 360 refurb, and has to stretch to quite a lot more vehicles, so I can't imagine it will be anything approaching the same standard.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
So what happened to Northern absolutely definitely not getting the 350s because they couldn't keep to the current timetables on the 323 routes, as discussed on here repeatedly?
 

Liam L

Established Member
Joined
19 Jun 2020
Messages
1,414
Location
Birmingham
So what happened to Northern absolutely definitely not getting the 350s because they couldn't keep to the current timetables on the 323 routes, as discussed on here repeatedly?
323 parts becoming harder to get, according to the internal email. the aim is to get rid of a fleet which is getting too expensive to maintain.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,156
It's being reported by Modern Railways.
For the benefit of forum members, I have quoted the article in question:
Northern is to lease the 37x4-car Class 350/2 EMUs currently stored at Long Marston.

The Siemens-built sets, which date from 2008/09, were sent off-lease last year by WM Trains following the introduction of its Class 730 EMUs.

A briefing sent to Northern staff, and seen by Modern Railways, states that prior to entering traffic, some £25 million will be spent on modifications for the units including upgrading the passenger experience through refreshed interiors. The investment comes from Siemens, which built the trains, and Porterbrook which owns them.

Northern has confirmed that the first five units will enter traffic at the end of next year, and they will be used on South Manchester routes, replacing the Class 323s, however, their introduction does not affect the longer-term plan of ordering up to 450 new trains.

Northern told Modern Railways in a statement that it had been exploring the potential introduction of the ‘350s’ as part of its wider fleet strategy. It added: “Alongside our ongoing programme to add up to 450 new trains to the Northern network, we are looking at whether Class 350s could provide additional capacity and help replace some of our oldest electric trains as they reach the end of their working lives.

“Any trains introduced would undergo significant modification and refurbishment before entering service to ensure they meet the needs of our customers and colleagues. This has the potential to improve the customer experience while providing a cost-effective solution for taxpayers.

"We are progressing through some procurement and approval steps with the Department for Transport and HM Treasury. There remains a significant amount of work to do, including further engagement with colleagues and trade union representatives.

“Our aim is to provide a reliable railway for customers, represent good value for money and support the railway’s transition towards Great British Railways. We will continue to engage with colleagues and stakeholders as this work progresses.”
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
323 parts becoming harder to get, according to the internal email. the aim is to get rid of a fleet which is getting too expensive to maintain.

Yeah, the point I was making is there were several posters on here until recently that categorically ruled out the 350/2s going to Northern.
 

507 001

Established Member
Joined
3 Dec 2008
Messages
2,173
Location
Huyton
This is going to make Northern’s west side fleet deployment very interesting.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,143
Location
Bolton
Don’t you mean the government has agreed for Northern to lease them? They are not the governments property to lend to anyone...
I think what they're probably trying to get at (without saying it) is that the bank has done a very clever lobbying job persuading the Department to force Northern lease them.

Yeah, the point I was making is there were several posters on here until recently that categorically ruled out the 350/2s going to Northern.
See above. The owners have connections in high places.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,305
Location
Somerset
So what happened to Northern absolutely definitely not getting the 350s because they couldn't keep to the current timetables on the 323 routes, as discussed on here repeatedly?
They can presumably keep to the timetables better than a fleet of 323s all parked up awaiting non-existent spare parts- which is presumably becoming increasingly likely.
 

py_megapixel

Established Member
Joined
5 Nov 2018
Messages
7,434
Location
Northern England
They can presumably keep to the timetables better than a fleet of 323s all parked up awaiting non-existent spare parts- which is presumably becoming increasingly likely.
And better than the glacially slow 319s - which, not that long ago, Northern was planning on replacing the 323s with.

The same applies to concerns about platform lengths. 350s are the same length as 319s!
 

Peter0124

Established Member
Joined
20 Nov 2016
Messages
2,740
Location
Glasgow
Can platforms currently served by 6x323 fit 8x350?

Or I assume these 350s will be used on primarily 3 car services like Manchester - Hadfield/Crewe/Stoke to become 4 car.
 