The policy change allowed signallers the freedom to utilize bi di as they see fit for regulating.
The bi-di Cheadle Hulme-Crewe includes appropriate feather and approach release for the speed of the crossover - 60mph from memory. Trains aren’t stopped, but drivers may well be notified in advance.If it's done on the fly as it were then do drivers get warned over the radio or do they just encounter an unexpected yellow - with a feather if they are lucky - and a lurch sideways?
I am almost certain that it works everywhere like a regular diverging route.If it's done on the fly as it were then do drivers get warned over the radio or do they just encounter an unexpected yellow - with a feather if they are lucky - and a lurch sideways?
The issue is that there are few instances in the UK where a) there are long enough station-station distances with enough varied traffic and b) an amount of traffic that actually allows stopping everything going the other way. Crossovers simply can't be provided at every signal for multiple reasons, and honestly the Dawlish example is the best location I can think of for this sort of working.Very common in Austria too, as - as in Switzerland, I believe - everywhere is bi-directionally signaled ("wrong-line" working as a term does not exist anymore). If a stopper gets overtaken, if possible the overtaking train will use the "non-scheduled" track, so that at stations en-route, no passenger needs to change platforms at the last minute.
Innerwick to Granthouse (southbound) on the ECML in Scotland could be done to get round a labouring southbound freight.
That’s not involving running in the wrong direction though, which is the main question of this thread.Once had an IET cross from the Up Main to Up Slow and then back again to get around a stopping service in P3 at Slough.
What you witnessed was actually a fruit of the love affair with single lead junctions that was prevalent in the Glasgow/Strathclyde area back in the 1980s. Westerton and Knightswood North Junctions functioned as a 'back-to-back' pair, half a mile apart. Could be quite un-nerving. Needs a layout plan to fully appreciate the set-up.I have seen this at Westerton where the train I was on, an electric local train starting at Milngavie, was overtaken on the other side by a Class 156 diesel presumably heading down from the West Highland Line (and yes, overtaken- it went back onto the track ahead of us). Rather disconcerting!
The only warning we get is a yellow with the feather at the Warren. It's a reasonably common thing, I'd say i do it 2 or 3 times a year personally. Seems mainly to happen in the evening when up traffic is lighter.If it's done on the fly as it were then do drivers get warned over the radio or do they just encounter an unexpected yellow - with a feather if they are lucky - and a lurch sideways?
Needs a layout plan to fully appreciate the set-up.
Something which sadly contributed to bringing the suburbs of Bellgrove and Newton into unwanted prominence.What you witnessed was actually a fruit of the love affair with single lead junctions that was prevalent in the Glasgow/Strathclyde area back in the 1980s.
A point of order...the Western does not run 'slow' trains! The lines are referred to as 'Reliefs' as they relieve the load on the Mains.Once had an IET cross from the Up Main to Up Slow and then back again to get around a stopping service in P3 at Slough.
The Sectional Appendix showing the layout you describedIIRC the only crossover at Westerton is the facing one on the Dalmuir side of the station. This serves a dual purpose, allowing trains to Milngavie to cross from Down onto Up line and then onto the branch, and trains from the Dalmuir direction (normally West Highland services) to cross from Up to Down line and then onto the Maryhill branch at the Glasgow end of the station.
On the Teignmouth section, no warning. Single yellow cautionary encountered followed by another main aspect with a No.4 junction indicator. All down to Sectional Appendix rules and route knowledge.If it's done on the fly as it were then do drivers get warned over the radio or do they just encounter an unexpected yellow - with a feather if they are lucky - and a lurch sideways?
I wonder why these reasons don't apply abroad, as others have described. The main Swiss mountain routes have very frequent crossovers, and looking at their condition they are in constant use.Crossovers simply can't be provided at every signal for multiple reasons, and honestly the Dawlish example is the best location I can think of for this sort of working.
It's a balance and related to the traffic mix and the maintenance requirements. By contrast, the Shinkansen network in Japan has very few crossovers outside major stations. Every turnout added is an asset requiring maintenance and renewal and is another failure point in the system that could lose detection in the heat or cold and revert a signal to red in front of a train. The costs and risks need to be accompanied by sufficient benefit to make them worthwhile.I wonder why these reasons don't apply abroad, as others have described. The main Swiss mountain routes have very frequent crossovers, and looking at their condition they are in constant use.
I heard a story from a signaller friend in Vic ASC, something had gone wrong and the bi di on the WLL needed using. The driver of a LO train stopped at the signal (with the route to the other road) rung the box to say he didn't sign the down road in the up direction......A signal and associated route indications are a signaller's intention and instruction, filtered through a safety interlocking. Assuming a driver has the route knowledge, a signalled wrong road move along the same corridor is still, in most cases, a viable route for a train to get to its next call, so it can't be a misroute, where an unexpected route will not get the train to where it's going or leads towards a section where the particular rolling stock is not permitted.
If it's done on the fly as it were then do drivers get warned over the radio or do they just encounter an unexpected yellow - with a feather if they are lucky - and a lurch sideways?
As others have said, normal junction signalling arrangements are used, either approach control / approach release or a flashing yellow(s) aspect sequence with the junction signal clearing up to a main aspect with junction (or route) indicator.I am almost certain that it works everywhere like a regular diverging route.
No, the reason is not the safety systems that you have listed (although these do add to the cost as well).I believe the main reason we haven't got round to installing bi-di for disruption purposes on mainlines (with a few exceptions for short sections) is that the safety systems make it unnecessarily difficult to have a proper bi-di system, so the cost would increase dramatically as it's not just replacing interlocking that is the issue. Yet another reason to finally get round to installing ETCS L1 nationwide, which was one of the justifications for downgrading ATP to TPWS.