Hi, I was walking along the seafront between Dawlish and Teignmouth on Sunday (28th June) and observed the Paddington to Paignton (RTT link) service being overtaken by the Exeter-Penzance service (RTT link) running on the opposite line (against normal traffic).

I've never seen a service leap-frog another before. Does anyone have any insight on why this happened and is this a regular occurrence?

Thanks
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,590
Location
Nottingham
Can't answer the question directly, but I know the Up line (further from the sea) is bi-directionally signalled to allow some service to continue if the Down line is damaged. Hence signalled overtaking is possible in he Down direction only.
 

Purple Train

Established Member
Joined
16 Jul 2022
Messages
2,444
Location
Despond
Hi, I was walking along the seafront between Dawlish and Teignmouth on Sunday (28th June) and observed the Paddington to Paignton (RTT link) service being overtaken by the Exeter-Penzance service (RTT link) running on the opposite line (against normal traffic). I've never seen a service leap-frog another before. Does anyone have any insight on why this happened and is this a regular occurrence?

Thanks
I've had it happen before when I was on a late-running Paddington-Plymouth. I think it's just used to let a late-running fast service overtake a local stopping train while minimising delay to the local - obviously if there's a train booked the other way you can't do it, but it seems to be proactively used where possible.

In your case it looks like exactly that, that the local stopping service was overtaken at Teignmouth by 1C83 Paddington-Plymouth, which was running right behind the Paignton express. (Not sure why the Paignton wasn't held at Dawlish Warren, but there we are.)
 

HOOVER29

Member
Joined
26 Mar 2009
Messages
591
Saw light engine 66023 overtake 143611 by Kennaway tunnel a few years ago
 

Attachments

  • IMG_6002.png
    IMG_6002.png
    1.7 MB · Views: 377

DJP78

On Moderation
Joined
26 Nov 2019
Messages
193
Location
Bristol
Bi-directional working applies between Dawlish Warren - Teignmouth section on the Up Main in the down direction. This allows for the signallers to move on-time trains around other trains etc. It's a reasonably common occurrence. Fixed signalling is in situ. Trains return to the down main via the Teignmouth crossover.
 

Vince C

Member
Joined
19 Jan 2026
Messages
7
Location
Cheshire
I was on a late-running 'Northern' service Stockport to Wilmslow which was switched to 'wrong line' before Handforth to allow a London-bound Pendolino to overtake us 'right line'. This involved a lengthy dwell time at Handforth for the waiting passengers to climb the stairs, cross over the line, and descend the stairs on to the other platform.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,630
I was on a late-running 'Northern' service Stockport to Wilmslow which was switched to 'wrong line' before Handforth to allow a London-bound Pendolino to overtake us 'right line'. This involved a lengthy dwell time at Handforth for the waiting passengers to climb the stairs, cross over the line, and descend the stairs on to the other platform.
I am surprised they bothered, just get you to Adswood Road and out the way, it was only 3 miles away.
 

QueensCurve

Established Member
Joined
22 Dec 2014
Messages
2,195
Not seen it happen there, but seen it on the BLS in Switzerland. One time at Brig I could see a very heavy freight train on the Lötschberg line (it had three Re 6/6 locos at the front and another 3 in middle) waiting someway up the hill on 'the wrong line' while 2 passenger trains overtook it.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,590
Location
Nottingham
Not so long ago, just before an London-bound train arrived at Bath a freight went through "wrong line", which I assume was heading for Westbury and was thus able to keep out of the way. They were also using both lines bi-directionally to Bathampton during the week-long Bristol-Bath closure last October. But in the UK it's pretty unusual for there to be a long enough gap in traffic for that sort of overtaking on a double line.
 

sh24

Established Member
Joined
28 Sep 2023
Messages
1,471
Location
London
It happens on the seawall. Not routinely but I"ve done it a couple of times.
 

sharpener

Member
Joined
4 Oct 2018
Messages
371
I've had it happen before when I was on a late-running Paddington-Plymouth. I think it's just used to let a late-running fast service overtake a local stopping train while minimising delay to the local - obviously if there's a train booked the other way you can't do it, but it seems to be proactively used where possible.

In your case it looks like exactly that, that the local stopping service was overtaken at Teignmouth by 1C83 Paddington-Plymouth, which was running right behind the Paignton express. (Not sure why the Paignton wasn't held at Dawlish Warren, but there we are.)
The 2021 timetable has the hourly Exmouth - Paignton trains recessed for 4 mins in the loops at Dawlish Warren so the expresses could overtake there. I don't know if this still happens, it may have been before the bi-di signalling. I don't know if they are long enough to hold a 9-car 80x.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,590
Location
Nottingham
The 2021 timetable has the hourly Exmouth - Paignton trains recessed for 4 mins in the loops at Dawlish Warren so the expresses could overtake there. I don't know if this still happens, it may have been before the bi-di signalling. I don't know if they are long enough to hold a 9-car 80x.
The bi-di signalling was put in with the Exeter re-signalling, can't remember when this was but way before 2021.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,789
Location
East Anglia
Yes it’s all good fun when that happens. On Summer Saturdays around five years back a Penzance bound IET was booked to run bidi from the Warren to Teignmouth and pass the Paignton stopper around the Parsons Cove area.
 

Rab Smith

Member
Joined
7 Jul 2021
Messages
290
Location
Cardiff
Here's a video from 2016 showing an XC HST being undertaken by a GWR HST so it's been happening for years!
 

wimbledonpete

Member
Joined
25 Nov 2011
Messages
260
I've been on a 395 heading to Folkestone that overtook a stopper at Sandling. Also on HS1 when something broke down, we passed a couple of Eurostars.
 

sharpener

Member
Joined
4 Oct 2018
Messages
371
About 1987. Same time as the Newton Abbott remodelling.

Thanks. It also occurred to me it might have been part of the post-2014 reconstruction and resilience work so earlier than that as well.

2021 was a random date bc that was an old pocket t/t handy on a shelf. According to RTT just now there is still provision in the t/t for overtaking at DWW in both directions (eg 1T11 waits for 8 mins to be passed by 1V42, 2F15 stops there for 16 mins to be passed by 1A81).

But I guess if a down train is going to be late for its slot the bi-di is a useful alternative.
 
Last edited:

Dr Hoo

Established Member
Joined
10 Nov 2015
Messages
5,604
Location
Hope Valley
Innerwick to Granthouse (southbound) on the ECML in Scotland could be done to get round a labouring southbound freight. Services were far less frequent in those days. (Once done 'for fun' when the Chairman was trundling south in an inspection saloon and an Up HST was whizzed by around Penmanshiel.) Cowlairs Tunnel and through to Eastfield was often worked 'parallel'.
 

Vince C

Member
Joined
19 Jan 2026
Messages
7
Location
Cheshire
The trains were going south by the sounds of it.
Yes, a glance at a map shows that Stockport to Wilmslow is southbound.

== Doublepost prevention - post automatically merged: ==

I am surprised they bothered, just get you to Adswood Road and out the way, it was only 3 miles away.
If you look at a map you'll see that Stockport to Wilmslow is a southbound journey.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,630
Yes, a glance at a map shows that Stockport to Wilmslow is southbound.

== Doublepost prevention - post automatically merged: ==


If you look at a map you'll see that Stockport to Wilmslow is a southbound journey.
Yep, and I replied earlier to someone else about it.
 

6Gman

Established Member
Joined
1 May 2012
Messages
9,185
Was on a Crewe-Manchester Pendolino once when the stopper in front of us was held at Chelford awaiting an ambulance, so we went onto the Up. The TM announced what we were doing and why; very interesting though I did find it a little disconcerting! The 323 was just pulling out at Chelford as we passed so we ran alongside it for a little way.

Very lucky to find a long enough slot to fit us through though!
 

MarlowDonkey

Established Member
Joined
4 Apr 2013
Messages
1,825
Stopping westbound trains on the Reliefs can be looped at Maidenhead into platform 4 (normally eastbound). It can be used at peak hours to give cross platform interchange to the Marlow branch trains.
 

Lucan

Established Member
Joined
21 Feb 2018
Messages
1,246
Location
Wales
The 2021 timetable has the hourly Exmouth - Paignton trains recessed for 4 mins in the loops at Dawlish Warren so the expresses could overtake there. I don't know if this still happens
I saw it happen a few weeks ago : 5th June, at around 10:00
 

Uncle Buck

Member
Joined
30 Jun 2020
Messages
336
Location
Glasgow
I have seen this at Westerton where the train I was on, an electric local train starting at Milngavie, was overtaken on the other side by a Class 156 diesel presumably heading down from the West Highland Line (and yes, overtaken- it went back onto the track ahead of us). Rather disconcerting!
 

Bryson

Member
Joined
24 Jan 2022
Messages
118
Location
Yorkshire
Not seen it happen there, but seen it on the BLS in Switzerland. One time at Brig I could see a very heavy freight train on the Lötschberg line (it had three Re 6/6 locos at the front and another 3 in middle) waiting someway up the hill on 'the wrong line' while 2 passenger trains overtook it.
It happens in Canada as well. Last year I was on a Via Rail service from Montreal to Toronto and I was puzzled as to why we had crossed over to the "wrong" line. I soon realised that we were over taking a slower moving train.
 

Austriantrain

Established Member
Joined
13 Aug 2018
Messages
1,786
Not seen it happen there, but seen it on the BLS in Switzerland. One time at Brig I could see a very heavy freight train on the Lötschberg line (it had three Re 6/6 locos at the front and another 3 in middle) waiting someway up the hill on 'the wrong line' while 2 passenger trains overtook it.

Very common in Austria too, as - as in Switzerland, I believe - everywhere is bi-directionally signaled ("wrong-line" working as a term does not exist anymore). If a stopper gets overtaken, if possible the overtaking train will use the "non-scheduled" track, so that at stations en-route, no passenger needs to change platforms at the last minute.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,549
Location
Torbay
Thanks. It also occurred to me it might have been part of the post-2014 reconstruction and resilience work so earlier than that as well.

2021 was a random date bc that was an old pocket t/t handy on a shelf. According to RTT just now there is still provision in the t/t for overtaking at DWW in both directions (eg 1T11 waits for 8 mins to be passed by 1V42, 2F15 stops there for 16 mins to be passed by 1A81).

But I guess if a down train is going to be late for its slot the bi-di is a useful alternative.
The bi di on the up line was provided from new. Unfortunately, they also installed continuous conventional track circuiting. The previous absolute block signalling had very few track circuits through the area by contrast. The TI21 jointless track circuits installed worked well in good weather, but with stormy high seas, salty seawater spray often caused multiple failures due to the ballast resistance changing. A special temporary absolute block system was quickly devised at Exeter that could be switched into use by the panel supervisor. That converted all the signalling along the sea wall into a single long block section for each direction between Dawlish Warren and Teignmouth, clearing all the intermediate signals regardless of the state of the track circuits. Staff were posted at the two end stations to observe tail lamps and report back to the panel. Meanwhile, a project was initiated to replace the track circuits with axle counters.
 