That's just a selection from a preset list, no doubt done in a hurry.The NR website (https://www.nationalrail.co.uk/service-disruptions/luton-20260619/) states disruption will continue until the end of the day. If this is true, and everything gets cleared up in 6 hours, all I'll have to say is wow!
Not necessarily. Could be anything. Signal passed at danger, anything at all.So, if 1st train stopped to report AWS fault, and then another hits from the rear, at a fair speed, to me, that points towards a signalling fault ?
I assume, in most circumstances, the most severe option, too. Read it less as disruption will be sorted by tomorrow and more, disruption will not be clearing up any time soon.That's just a selection from a preset list, no doubt done in a hurry.
I’m deeply concerned to hear reports of the collision involving 2 East Midlands Railway passenger trains. I’m grateful to emergency services who are on the scene, attending to those affected. We're working quickly with the rail industry and local partners to support passengers.
Likely a VSTP Passenger service, I just saw a 1Z04 appear at Leicester and I believe your 1Z01 is at Long Eaton, so doubtful that it is not a passenger service.What is 1Z01 for? I saw it on Traksy earlier. Is it a rescue train or a VSTP passenger service?
Where? Heading which direction?What is 1Z01 for? I saw it on Traksy earlier. Is it a rescue train or a VSTP passenger service?
Not quite...Im guessing the signal visible it the one between the A421 underpass and Elstow stone siding.
Luckily right near the fire station and hospital.
Thoughts and prayers to all involved.
They will start being turned around and head back in direction they came from.What's happening with the other trains in the area? Are they being evacuated at the moment?
That 360 looks like hell. The impact from that must have been massive to do that much damage to the ends of the coaches.
ThanksLikely a VSTP Passenger service, I just saw a 1Z04 appear at Leicester and I believe your 1Z01 is at Long Eaton, so doubtful that it is not a passenger service.
That is what the train is designed to do in a collision of greater force. Notably the doors and windows are all intact so the passenger "survival space" has not been compromised. Once we get more information on speed, casualties etc we may well be thanking the Siemens engineers who designed the 360 that it performed as it did.That 360 looks like hell. The impact from that must have been massive to do that much damage to the ends of the coaches.
Currently near Long Eaton, heading towards Derby.Where? Heading which direction?
Could be a stranded train returning to where it came from.
Could be a train to collect the passengers evacuated from the incident trains.
Could be taking emergency personnel to the train
Many scenarios
London air ambulance just took off from siteTwo more air ambulances just arrived on scene (looking at a plane app)
As per post 106 who answered at same time, these will be special short notice planned services being operated by EMR ie Sheffield to Leicester etcCurrently near Long Eaton, heading towards Derby.
Stranded trains would presumably be running ECS as 5Zxx.
Since it's running in the opposite direction quite far up the MML I'd be shocked if it is an evac or emergency personnel train.
Sky News helicopter just about to arrive.London air ambulance just took off from site
Point of order. You get a junction indicator if coming up from the up slow , usually from P1 , but if on the up/down which is usually from P2 or P3 you just get a main aspect.Not necessarily. Signal overlaps are not long enough to provide a safety margin if a train passes a signal at danger at high speed. They are designed to cater for small misjudgments.
It would be common for up EMR services to experience a single yellow with junction indicator at Bedford South Junction after being turned out following a fast service on the up fast, much less common for the following signal to then remain at danger due to an out-of-course stop from the train in front.
London air ambulance just took off from site
It’s the RAIB’s railway now. With NR, they will determine how much adjacent railway they need on stop for everyone to work safely.With the RAIB investigating, examining and collecting evidence at the location and at signalling centres etc, I'm thinking it may not be possible to run even a restricted service past the scene for some time, perhaps even a matter of days.