Amos390
Member
Could you also argue that there was an equipment failure on board that train, that has not necessarily pulled it from service but may have incurred a (hefty) delay? Would that not then be a failure of the train?
Thought a delay of 10 minutes or more was considered a failure? Doesn't have to totally sit down and need rescuing to count as a failure.
As far as I'm aware (although someone correct me if I am wrong), the railway recognises the term 'failure' if a train needs removing from a service, either terminating short at a station or if the unit has sat down out of course and needs rescuing or evacuating
In 10 years working on railway I have only head failure used when train has been taken out of service due to faults or where train needed rescuing.Thought a delay of 10 minutes or more was considered a failure? Doesn't have to totally sit down and need rescuing to count as a failure.
EMR said it was "pressing" Hitachi Rail, the manufacturer of its new £400m fleet of Class 810 Aurora trains, to solve the delivery issues.
"We recognise the frustration customers have been feeling recently and acknowledge that services have not always been up to the standards they rightly expect," added a spokesperson.
"Our teams have been doing everything possible to lessen the impact by making the best use of the available fleet, managing capacity across the network, and liaising closely with our Network Rail colleagues to keep services moving safely and reliably.
We are pressing Hitachi Rail to resolve the delivery issues and improve the reliability of our Intercity trains as quickly as possible.
Ok, thanks for info. I was of understanding definition in BR days was 10 minute delay or more, possibly I misunderstood or it's changed as that was quite a few years ago!In 10 years working on railway I have only head failure used when train has been taken out of service due to faults or where train needed rescuing.
Never heard failure used where a train was delayed due to a fault and was able to continue its journey.
Unfortunately the 0700 SHF-STP was started at Derby today, due to a train fault of course. No 810s were pulled from service on Sunday (although only 4 out), which I believe is the first day in a fair few weeks.Just seen there is no 810011 in service today, hopefully meaning there is a shot at today being a fault-free day for the units (although not too optimistic…)
Ah I wasn’t aware of this morning, oh well, could’ve been worse. At least there’s good news about the Sunday, however not sure if under a heavily reduced timetable counts much, still yet to see a day of normal full running for a while.Unfortunately the 0700 SHF-STP was started at Derby today, due to a train fault of course. No 810s were pulled from service on Sunday (although only 4 out), which I believe is the first day in a fair few weeks.
My boldUnfortunately the 0700 SHF-STP was started at Derby today, due to a train fault of course. No 810s were pulled from service on Sunday (although only 4 out), which I believe is the first day in a fair few weeks.
No 810006My bold
1C30 cape Sunday because the empty stock from Etches Park was cancelled 'problem with the train' - was this a 222?
Thank you.No 810006

Didn’t know that was supposed to be an 810 - does anybody know the last date when all diagrams were successfully completed?No 810006
Not sure of the last time all diagrams were done, but I think the reason why that was an 810 is all the services had been skewed all over the place because of engineering works causing services to be diverted via Melton and Corby, so less services, different route timings so on so forth.Didn’t know that was supposed to be an 810 - does anybody know the last date when all diagrams were successfully completed?
Taken from the north east rail scene on Facebook, it was 810021 on test.I saw an 810 passing The Sidings Hotel last night (16th) working 5Q58 Merchant Park to Doncaster, would anyone know which 810 it was been tested?
Thank you for this information, I've only seen a couple of these 810s so I'm not fully up to date with everything.Taken from the north east rail scene on Facebook, it was 810021 on test.
Screen grab from fb attached
== Doublepost prevention - post automatically merged: ==
So 810022 which has for the last nearly 3 weeks has been having work done to its doors in the yard at Merchant Park, seems to of had it completed.
810020 is now undergoing what ever work if is they are doing, I've attached a picture showing it with doors removed and sealed over. The 2 structures in front of it will be placed into the carriages which to me look like extractors.
I wonder if they are doing a fix to the continued door issues and that could be a reason why 810020 did not deliver to Etches Park as planned last week.
Ps this is a presumption on my part that it is work to the doors.
How many stations, that 810s frequently call at, are on a significant curve with super-elevation?Thew problem of course is the number of MML stations on curves with super-elevation. It was a problem with 170 Turbo trains
How many stations, that 810s frequently call at, are on a significant curve with super-elevation?
There aren't many calls anywhere between St Pancras and Kettering, Harborough was rebuilt.
The platforms at stations from Leicester northwards are mostly straight and/or low speed so don't think they have significant superelevation.
Whereas I get the impression door faults pop up anywhere and everywhere, so I'm wondering if this is really a factor?
022. Just passed me north of York.Currently there appears to be a new 810 heading south from Merchant Park to Etches Park. Anyone know which one please?
Let’s see if all the work on the doors has paid off.022. Just passed me north of York.
Thanks alm37022. Just passed me north of York.
== Doublepost prevention - post automatically merged: ==
Let’s see if all the work on the doors has paid off.
Well, it has a wheel flat when it arrived at Doncaster.022. Just passed me north of York.
== Doublepost prevention - post automatically merged: ==
Let’s see if all the work on the doors has paid off.
You would have thought a MP would understand about leases and contracts, and therefore understand why the trains were moved away.No new news in this, but shows the underperformance of Hitachi/EMR in getting the 810s into service is seen as having some political mileage.
Link is to a written question by Neil O'Brien (Con, Harborough) to DfT with response by Kier Mather (Transport Minister)
How many stations, that 810s frequently call at, are on a significant curve with super-elevation?
Just Wellingboro’ and Kette
Perhaps, but equally terms could have been included to give EMR a veto on trains moving away, if it was deemed valuable at the time of the agreement being made.You would have thought a MP would understand about leases and contracts, and therefore understand why the trains were moved away.
Perhaps, but equally terms could have been included to give EMR a veto on trains moving away, if it was deemed valuable at the time of the agreement being made.