Nicholas Lewis
Established Member
So as usual for all the fault free running modern trains get they never survive first contact with passengers. In yonder years a couple of prototypes would have been built first and once they have satisfied the core requirements on safety of the train they were just put into use with travelling fitters to deal with issues. Flush out the problems find fixes and build into the production run.I caught 810010 from Kettering this afternoon. It was already 30 late due to technical issues. Apparently only running on 2 (from 4) engines. This meant no USB power and bizarrely the coffee machine wouldn't work either.
When it got to Corby the doors wouldn't open. Another 5 or so minutes delay. It then avoided Leicester in an attempt to recover time. However when it got to Long Eaton the doors wouldn't open again. Another 2 minute delay.
When we got to Derby a set swap had been arranged so we all alighted and marched down the platform to a replacement set (011) which was standing further forward on the same platform.
That then set off and nothing out of the ordinary occurred until we got to Sheffield when the doors of this set wouldn't open either. After a few minutes release came. It was meant to form the 18.00 back to St Pancras but still suffered a technical fault. There then followed a points failure at Ambergate so it wasn't clear what was still causing the delay when my northern train left at 19.05.