• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Class 810 for East Midlands Railway Construction/Introduction Updates

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
7,983
Location
Surrey
I caught 810010 from Kettering this afternoon. It was already 30 late due to technical issues. Apparently only running on 2 (from 4) engines. This meant no USB power and bizarrely the coffee machine wouldn't work either.
When it got to Corby the doors wouldn't open. Another 5 or so minutes delay. It then avoided Leicester in an attempt to recover time. However when it got to Long Eaton the doors wouldn't open again. Another 2 minute delay.
When we got to Derby a set swap had been arranged so we all alighted and marched down the platform to a replacement set (011) which was standing further forward on the same platform.
That then set off and nothing out of the ordinary occurred until we got to Sheffield when the doors of this set wouldn't open either. After a few minutes release came. It was meant to form the 18.00 back to St Pancras but still suffered a technical fault. There then followed a points failure at Ambergate so it wasn't clear what was still causing the delay when my northern train left at 19.05.
So as usual for all the fault free running modern trains get they never survive first contact with passengers. In yonder years a couple of prototypes would have been built first and once they have satisfied the core requirements on safety of the train they were just put into use with travelling fitters to deal with issues. Flush out the problems find fixes and build into the production run.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Mugby

Established Member
Joined
25 Nov 2012
Messages
2,128
Location
Derby
That then set off and nothing out of the ordinary occurred until we got to Sheffield when the doors of this set wouldn't open either. After a few minutes release came. It was meant to form the 18.00 back to St Pancras but still suffered a technical fault. There then followed a points failure at Ambergate so it wasn't clear what was still causing the delay when my northern train left at 19.05.
Yes, that's what I was thinking. There was an infrastructure problem but EMR are very well versed in dealing with such events and diverting via alternative lines, it's a matter of routine to them so why was 011 held at Sheffield for an hour and a half. Particularly when Hitachi people were inspecting each carriage, it suggested there was an additional issue which wasn't mentioned.
 

duffield

Established Member
Joined
31 Jul 2013
Messages
3,268
Location
East Midlands
The fact that Hitachi still seems to be incapable of getting the doors to work reliably after all this time may point to a fundamental design issue with them, which does not bode well.
 

superkev

Established Member
Joined
1 Mar 2015
Messages
2,856
Location
west yorkshire
The fact that Hitachi still seems to be incapable of getting the doors to work reliably after all this time may point to a fundamental design issue with them, which does not bode well.
Have Hitachi changed there door supplier from previous 8xx trains?
K
 

Amos390

Member
Joined
22 Jan 2025
Messages
678
Location
Nottingham
AFAIK The doors are a completely new design due to the squashed/compact nature of the coach ends. This is why I'm concerned the design is fundamentally flawed.
Hasn’t there been talk here in the past of litter left by people getting trapped in the running treads of the doors along the floor and jamming up the system or something? If so then surely that’s one major oversight. Presuming theres also electrical issues baked in there to deal with too right?
 

duffield

Established Member
Joined
31 Jul 2013
Messages
3,268
Location
East Midlands
Hasn’t there been talk here in the past of litter left by people getting trapped in the running treads of the doors along the floor and jamming up the system or something? If so then surely that’s one major oversight. Presuming theres also electrical issues baked in there to deal with too right?
It seems to be happening far too often to be random occurrences of litter just happening to be in the wrong place. I don't remember ever seeing much litter lying around in the vestibules. But that's just my perception, I could be wrong.
 

dosxuk

Established Member
Joined
2 Jan 2011
Messages
2,428
There sounds to be a lot of cases of doors failing to release, which would be odd to be caused by things trapped in the runners - you'd expect that to cause problems with closing, not opening.

I seem to be remember there was another new design introduced years back which had problems with doors when there was any element of cant. They'd work perfectly in the depot / factory, but as soon as they were out in the real world they had problems all over the place. Took a fair while to design out the issue IIRC but it was sorted and they're now reliable.
 

DannyMich2018

Member
Joined
19 Dec 2018
Messages
932
Got my first ever ride on an 810 earlier, 11.05 from Leicester as far as Kettering (Via Corby this weekend)
Good points:-
Good legroom,
Pleasant inside, not overly loud engine noise, acceleration no worse than a 222, seats OK, arrived early at Corby and Kett, 810s don't seem to be speed restricted as much as 222s on this route

Cons:- as others have mentioned the air con is really loud and it is! Everything else is pretty good. On diesel leaving both Corby and Kett due to some engineering reasons I presume.

All in all a pretty good train, just need them to get more reliable, also multiple working will help as this train was busy.
 

Merle Haggard

Established Member
Joined
20 Oct 2019
Messages
3,850
Location
Northampton
There sounds to be a lot of cases of doors failing to release, which would be odd to be caused by things trapped in the runners - you'd expect that to cause problems with closing, not opening.

I seem to be remember there was another new design introduced years back which had problems with doors when there was any element of cant. They'd work perfectly in the depot / factory, but as soon as they were out in the real world they had problems all over the place. Took a fair while to design out the issue IIRC but it was sorted and they're now reliable.

That was the case when the 170s were introduced on Midland Main Line, coincidentally.
 

Amos390

Member
Joined
22 Jan 2025
Messages
678
Location
Nottingham
Got my first ever ride on an 810 earlier, 11.05 from Leicester as far as Kettering (Via Corby this weekend)
Good points:-
Good legroom,
Pleasant inside, not overly loud engine noise, acceleration no worse than a 222, seats OK, arrived early at Corby and Kett, 810s don't seem to be speed restricted as much as 222s on this route

Cons:- as others have mentioned the air con is really loud and it is! Everything else is pretty good. On diesel leaving both Corby and Kett due to some engineering reasons I presume.

All in all a pretty good train, just need them to get more reliable, also multiple working will help as this train was busy.
I definitely agree with all these points, when given all greens and not breaking down, the 810s perform very well, however I also don't like how you can feel the pressure changing as the doors open and close, makes my ears go pop, and was something picked up on by the other people I travelled with. I also like how you can hardly notice the changeover from diesel to electric, just a slight rumble under the seat and that's all really.
 

londonmidland

Established Member
Joined
22 Dec 2009
Messages
2,347
Location
Leicester
however I also don't like how you can feel the pressure changing as the doors open and close, makes my ears go pop, and was something picked up on by the other people I travelled with.
There’s definitely some weird pressure change going on with the 810s. I noticed it when on a fast service from Nottingham to Leicester.

Strangely, I haven’t had this issue on the other 80x series trains.
 

Mugby

Established Member
Joined
25 Nov 2012
Messages
2,128
Location
Derby
There’s definitely some weird pressure change going on with the 810s. I noticed it when on a fast service from Nottingham to Leicester.

Strangely, I haven’t had this issue on the other 80x series trains.
Actually, when 011 arrived at Derby on Saturday evening, I was standing right by the door waiting for the 'Open' button to light up.
Suddenly, the door seemed to be forced outwards by about half an inch, as if someone or something had given it a mighty whack. It immediately settled back into it's true alignment and the release lit up after about ten seconds.
I can only conclude that this strange phenomenon was caused by some sudden interior pressure change, something which hadn't occurred to me until I read the last couple of posts. Next time I travel on one, I'll try to be at the door when the train stops at a station to see if it recurs.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,581
Assuming 810s have the same principles of operation (albeit different design) to all the other 800 seroes and the 395s, there is a cam which pushes the door inwwrds against the seal just after closure / moving off, and this releases just before opening. This causes the door to move in/out a little.
 

43055

Established Member
Joined
8 Mar 2018
Messages
3,678
Assuming 810s have the same principles of operation (albeit different design) to all the other 800 seroes and the 395s, there is a cam which pushes the door inwwrds against the seal just after closure / moving off, and this releases just before opening. This causes the door to move in/out a little.
Yes this still happens on a 810.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,609
Location
Hampshire
Assuming 810s have the same principles of operation (albeit different design) to all the other 800 seroes and the 395s, there is a cam which pushes the door inwwrds against the seal just after closure / moving off, and this releases just before opening. This causes the door to move in/out a little.
Very much this, it’s a standard piece of Hitachi kit used across their high speed designs and I believe originated with one of the Shinkansen designs.
 

Trainman40083

Established Member
Joined
29 Jan 2024
Messages
4,522
Location
Derby
I had a reasonable run from Derby to London St Pancras this morning, with 810016. I decided not to go double or quits, and caught a Class 91 hauled Leeds train out of Kings Cross instead
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,728
It's not failed, it's still out in service
That depends on your definition of a failure. If it has incurred delay minutes over a certain threshold due to a fault it counts as a failure for reporting purposes.
 

QSK19

Member
Joined
29 Dec 2020
Messages
1,143
Location
Leicestershire
810011 is showed on RTT as having been cancelled at Leicester. I got off there and, apart from a driver change, nothing looked untoward. Admittedly, I left the platform before the train set off, but I can’t recall passengers being detrained.
 

Amos390

Member
Joined
22 Jan 2025
Messages
678
Location
Nottingham
810011 is showed on RTT as having been cancelled at Leicester. I got off there and, apart from a driver change, nothing looked untoward. Admittedly, I left the platform before the train set off, but I can’t recall passengers being detrained.
Definitely been cancelled now - M8 ‘Problems with the Train’
 

Richard Scott

Established Member
Associate Staff
International Transport
Railtours & Preservation
Joined
13 Dec 2018
Messages
4,575
That depends on your definition of a failure. If it has incurred delay minutes over a certain threshold due to a fault it counts as a failure for reporting purposes.
Thought a delay of 10 minutes or more was considered a failure? Doesn't have to totally sit down and need rescuing to count as a failure.
 

liamf656

Established Member
Joined
2 Aug 2020
Messages
1,692
Location
Derby
That depends on your definition of a failure. If it has incurred delay minutes over a certain threshold due to a fault it counts as a failure for reporting purposes.
Thought a delay of 10 minutes or more was considered a failure? Doesn't have to totally sit down and need rescuing to count as a failure.

As far as I'm aware (although someone correct me if I am wrong), the railway recognises the term 'failure' if a train needs removing from a service, either terminating short at a station or if the unit has sat down out of course and needs rescuing or evacuating
 

Top