Bridge strike.Is that due to a structural problem or a bridge strike?
Bridge strike.
How many strikes has it had, and when? That would be my first thought for a gradual increase in damage.The structure must have already been compromised though to fail like that from being hit by a lorry surly?
Perhaps the structure was designed with plenty of strength to support vertical loads, but wasn't designed to have much strength when pushed horizontally.The structure must have already been compromised though to fail like that from being hit by a lorry surly?
Depends how hard and how quick it was hit presumably? Force = mass x acceleration etc...The structure must have already been compromised though to fail like that from being hit by a lorry surly?
Depends how hard and how quick it was hit presumably? Force = mass x acceleration etc...
Say it was 40mph and 10tonnes, that is 140,000 Newtons.
We do have them, but only on a small minority of bridges.Maybe.
It still amazes me that we don't have something as simple as a sacrificial girder before low bridges to take the brunt of the hit, especially when the bridge carries multiple trains an hour doing 125mph.
That's Marston Lane. It's a low bridge (3.6m / 12ft) although the signage seems to have gone missing, maybe dropped out of view
Or some very substantial road vehicle only just too tall that effectively lifted it up and shifted it sideways?Depends how hard and how quick it was hit presumably? Force = mass x acceleration etc...
Say it was 40mph and 10tonnes, that is 140,000 Newtons.
What was planned? to hit the bridge? behave.If I understand correctly that the part of the bridge that was hit actually has a track over it, we're lucky there wasn't a train passing at the same time... though if it is a hit and run I guess this was planned.
If I understand correctly that the part of the bridge that was hit actually has a track over it, we're lucky there wasn't a train passing at the same time... though if it is a hit and run I guess this was planned.
Its bidi along there, depends if they can run on the other two lines furthest away.I assume that the West Coast Main Line will face disruption for several weeks due to this?
Hopefully the damaged vehicle will get reported by someone or the perpetrator will have injuries or say something to a third party who will inform the relevant authorities.Post and subsequent photo from Bedworth Community Forum suggests a hit and run.
Depends how hard and how quick it was hit presumably? Force = mass x acceleration etc...
Say it was 40mph and 10tonnes, that is 140,000 Newtons.
We do have them, but only on a small minority of bridges.
That's why I didn't do A Level maths then.No, your 40mph is a speed not acceleration.
Impulse = change in momentum: Ft = mv - mu
If the lorry is brought to rest uniformly in 1 second, taking your 40mph as 17.9 m/s
Force x 1 = 10,000 x 17.9 - 0
17,900 N
And if the lorry was brought to uniform rest in 0.5s, the force would be doubled.
If its not a high risk site, then they aren't going to get put on.I know, but to not have them to protect known low bridges on one of Europe's busiest main lines seems is rather inexcusable.
Surprises me that Marston Lane doesn't have this. Considering that the A5 at Hinckley has girders either side for a line which isn't as busy (I think the line speed is 80mph over it). Also, I believe the company that the lorry is from has been identified too.Maybe.
It still amazes me that we don't have something as simple as a sacrificial girder before low bridges to take the brunt of the hit, especially when the bridge carries multiple trains an hour doing 125mph.
Previous threads have suggested there’s a marked reluctance to fit them because of some strange reasoning that they are some sort of a hazard to road users.I know, but to not have them to protect known low bridges on one of Europe's busiest main lines seems is rather inexcusable.
Think about the traffic using the A5, versus a country lane. There is logic in it!Surprises me that Marston Lane doesn't have this. Considering that the A5 at Hinckley has girders either side for a line which isn't as busy (I think the line speed is 80mph over it).
its not a high risk site, then they aren't going to get put on.