Report of Partial Bridge Collapse WCML 11/6

SCDR_WMR

Established Member
Joined
17 Dec 2017
Messages
2,610
Location
Crewe
Network Rail have reported that there is a partial bridge collapse near Bedworth, a few miles south of Nuneaton station.

All traffic to be routed via West Midlands until further examination completed.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Noseygit

Member
Joined
25 Nov 2023
Messages
104
Location
Bedworth
I saw another picture online of that bridge collapsed with a lorry in it but the lorry seems to have disappeared , that will be a long repair job
 
Joined
30 Jan 2024
Messages
13
Location
North-East
That's Marston Lane. It's a low bridge (3.6m / 12ft) although the signage seems to have gone missing, maybe dropped out of view. Must have been a big hit to carve that substantial fresh gouge out of the concrete over the centre of the road. Maybe a crane knuckle?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,897
Location
Mold, Clwyd
From RTT, the first diversion off the Trent Valley route appears to be at about 1600 (at Rugby, Stafford or Stone).
Several earlier trains appear to be stuck elsewhere on the Trent Valley section.

Marston Lane appears to be a minor road, so it's unlikely for the bridge to have been hit at speed.
The railway is 3-track at that point (just south of where it becomes 4-track at Attleborough).
From the SA, all 3 lines are reversibly signalled, so there is some flexibility if any of the tracks are usable.
 
Last edited:

dmncf

Member
Joined
4 Sep 2012
Messages
520
The structure must have already been compromised though to fail like that from being hit by a lorry surly?
Perhaps the structure was designed with plenty of strength to support vertical loads, but wasn't designed to have much strength when pushed horizontally.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,624
The structure must have already been compromised though to fail like that from being hit by a lorry surly?
Depends how hard and how quick it was hit presumably? Force = mass x acceleration etc...

Say it was 40mph and 10tonnes, that is 140,000 Newtons.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
Depends how hard and how quick it was hit presumably? Force = mass x acceleration etc...

Say it was 40mph and 10tonnes, that is 140,000 Newtons.

Maybe.

It still amazes me that we don't have something as simple as a sacrificial girder before low bridges to take the brunt of the hit, especially when the bridge carries multiple trains an hour doing 125mph.
 

thenorthern

Established Member
Joined
27 May 2013
Messages
4,710
I assume that the West Coast Main Line will face disruption for several weeks due to this?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
Maybe.

It still amazes me that we don't have something as simple as a sacrificial girder before low bridges to take the brunt of the hit, especially when the bridge carries multiple trains an hour doing 125mph.
We do have them, but only on a small minority of bridges.
 

rmHawk765

Member
Joined
8 Apr 2025
Messages
708
Location
ECML South
If I understand correctly that the part of the bridge that was hit actually has a track over it, we're lucky there wasn't a train passing at the same time... though if it is a hit and run I guess this was planned.
 

SuspectUsual

Established Member
Joined
11 Jul 2018
Messages
6,664
That's Marston Lane. It's a low bridge (3.6m / 12ft) although the signage seems to have gone missing, maybe dropped out of view

I think the signage is on the chunk of bridge that's directly on the road surface, so hidden from view now
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,303
Location
Somerset
Depends how hard and how quick it was hit presumably? Force = mass x acceleration etc...

Say it was 40mph and 10tonnes, that is 140,000 Newtons.
Or some very substantial road vehicle only just too tall that effectively lifted it up and shifted it sideways?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,624
If I understand correctly that the part of the bridge that was hit actually has a track over it, we're lucky there wasn't a train passing at the same time... though if it is a hit and run I guess this was planned.
What was planned? to hit the bridge? behave.
 

sh24

Established Member
Joined
28 Sep 2023
Messages
1,471
Location
London
If I understand correctly that the part of the bridge that was hit actually has a track over it, we're lucky there wasn't a train passing at the same time... though if it is a hit and run I guess this was planned.

Hit and run means someone has run from an accident. not a planned hit.

Truck looks potentially like a flatbed with a crane mounted (a hiab) hence the large scrape mark from the crane knuckle.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,787
Location
East Anglia
Post and subsequent photo from Bedworth Community Forum suggests a hit and run.
Hopefully the damaged vehicle will get reported by someone or the perpetrator will have injuries or say something to a third party who will inform the relevant authorities.
 

TheoBald

Member
Joined
21 Mar 2016
Messages
38
Depends how hard and how quick it was hit presumably? Force = mass x acceleration etc...

Say it was 40mph and 10tonnes, that is 140,000 Newtons.

No, your 40mph is a speed not acceleration.
Impulse = change in momentum: Ft = mv - mu
If the lorry is brought to rest uniformly in 1 second, taking your 40mph as 17.9 m/s
Force x 1 = 10,000 x 17.9 - 0
179,000 N
edit to improve my sums!

And if the lorry was brought to uniform rest in 0.5s, the force would be doubled.
 
Last edited:

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,624
No, your 40mph is a speed not acceleration.
Impulse = change in momentum: Ft = mv - mu
If the lorry is brought to rest uniformly in 1 second, taking your 40mph as 17.9 m/s
Force x 1 = 10,000 x 17.9 - 0
17,900 N

And if the lorry was brought to uniform rest in 0.5s, the force would be doubled.
That's why I didn't do A Level maths then.

== Doublepost prevention - post automatically merged: ==

I know, but to not have them to protect known low bridges on one of Europe's busiest main lines seems is rather inexcusable.
If its not a high risk site, then they aren't going to get put on.
 

james60059

Member
Joined
6 Jul 2006
Messages
874
Location
Hinckley
Maybe.

It still amazes me that we don't have something as simple as a sacrificial girder before low bridges to take the brunt of the hit, especially when the bridge carries multiple trains an hour doing 125mph.
Surprises me that Marston Lane doesn't have this. Considering that the A5 at Hinckley has girders either side for a line which isn't as busy (I think the line speed is 80mph over it). Also, I believe the company that the lorry is from has been identified too.
 
Last edited:

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
I know, but to not have them to protect known low bridges on one of Europe's busiest main lines seems is rather inexcusable.
Previous threads have suggested there’s a marked reluctance to fit them because of some strange reasoning that they are some sort of a hazard to road users.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,624
Surprises me that Marston Lane doesn't have this. Considering that the A5 at Hinckley has girders either side for a line which isn't as busy (I think the line speed is 80mph over it).
Think about the traffic using the A5, versus a country lane. There is logic in it!
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
its not a high risk site, then they aren't going to get put on.

False economy, a simple metal girder will cost far less than just the repair to this bridge alone, before you start to take into consideration the cost of disruption.
 

Top